RPA Project– Daily Observation Report

Western Region Al Safa Palace Makkah

Date Location Work Type Description Quality Comments

2 pcs of False Ceilings are Need


Observation
to be Fixed Near lift
Bld#08
(-8 Floor)
No FE inside Electrical Room &
Observation Door Handle is missing, Room
Need to be Cleaned
Observation Cable Trenches are Full of Dust Not Acceptabale Need to be Cleaned

Observation T/F are Not Cleaned Not Acceptabale Need to be Cleaned


Bld#E01
( S/S# 01)

Civil Work is required Outside


Observation Not Acceptabale Need to be repaired
Wall of S/S#01

Observation No Any PM report Found

Observation Trenches are full of Dust Not Acceptabale


13-Aug-18

Panels( MDP-4, EMDP, MDP-4A)


Bld#4C Observation are Not Cleaned , too Much Not Acceptabale
(S/S#91) Dust on the Panels

DB-PR Panel Board is in Open


Observation Not Acceptabale
Condition and Rusty from Inside

Observation Room is not Cleaned Not Acceptabale


Fan Coil Units on the Top Roof
Observation are in Bad conditions need to be
Clean
Bld#24

Observation Some Lightings are not Working

Bld#7 Observation Civil Work is required Need to be done

Yasir Liaquat
Hard Services Supervisor