Professional Documents
Culture Documents
○ ing
● Inform
○ Instruction
Briefing Materials
• Safety Precaution
• Preventive Architecture Monitoring
• Corrective Action
• Direct Request Handling
• Daily report & Updates
Participants
Supervisor : Uta Domas R.
Technician :
1. Abdul Wahab 3. Karnudin 5. Eben Ezer Hasibuan
2. Chaerul Anwar 4. Rinaldi Wiranata
Attendance :
Regular Hour Man Power
(08:00 ~ 17:00)
Position Total Present Permissi Sick Leave
on Leave Leave
Supervisor 1 1
Staff 5 4 1
1 CKD ARC Cracked wall in maintenance Gate 2,3,4 ARC Architecture Monitoring
storage CKD Routine
2 CKD ARC Cracked wall in Ruang Tamu CKD Truck Scale ARC Architecture Monitoring Routine
3 Body Shop ARC Repair cracked wall in stair beside TDO ARC Architecture Monitoring
body repair body shop Routine
4 Assembly Shop ARC Assembly Shop VIP Area Touch Up Gate 2,3,4 PL Plumbing Monitoring Routine
10
Building Maintenance
Routine Monitoring:
“Architecture Monitoring”
Building Maintenance Preventive Activity
Architecture Monitoring
Shop Area : Gate 2,3,4, TDO, Truck Scale
Issue(s) Found :-
3
Building Maintenance Corrective Action
N Area
Code Description Before After Remarks
o Detail Location
CKD
Cracked wall in
1 FN-1319 maintenance storage Closed
Maintenance CKD
Storage
CKD
Cracked wall in Ruang
2 FN-1320
Tamu CKD
Closed
Ruang Tamu
N Area
Code Description Before After Remarks
o Detail Location
Assembly
4 FN-1323
Shop Assembly Shop VIP
Closed
Area Touch Up
Lobby Area
Paint Shop
Repair clogged closet
5 FN-1324
in Paint Shop PA05
Closed
Toilet PA05
3 Body Shop ARC Repair cracked wall in stair beside body repair body shop Done Repair
4 Assembly Shop ARC Assembly Shop VIP Area Touch Up Done Repair
5 Paint Shop PL Repair clogged closet in Paint Shop PA05 Done Repair
6 Utility Center ARC Build scaffolding for repair in substation utility On Progress Repair
10