BASHUNDHARA BITUMEN PLANT Dt. Of Issue

Bicycle Requirment Sectionwise Last Rev. Dt.

No of Bicycle
S/L NO. Section Name Where to use Purpose
required
1 Process Process area 1
Boiler, ETP & Modified Bitumen
2 Utilities & Modified Bitumin 1
Area
Jetty, Drum Plant & Tank Farm
3 Offsite & Drum Plant 4
Area
1. For travelling all over the plant area to ch
Site-1 2
identify & verify all HSE issues
4 Health, Safety & Environment
2. To take prompt  actions for day to day ac
Site-2 2
for any kind of HSE observation
Site-1 2
5 Project inspection department
Site-2 2

Travelling from tank to tank, jetty, loading


6 Planning and Scheduling All Over the Plant 3 remote areas to perform product quantificat
product delivery

ADU/VDU Process Area 2

Drum Plant Area 2


7 Mechanical Maintenance Section
Boiler & Modified Bitumen Area 2

Diesel Tank Farm & ETP Area 2

Jetty Area 2
1.for construction power support team & M
2.for Electrician & electrical workshop
8 Electrical & Instrument Department All Over the Plant 4
3.for Instrument Technician
4.for Dormitory electrician at Riverview

Regular movement from office building to


of the plant and immediate response for pla
9 Plant Inspection & Integrity All over the plant 3
emergency of the 03 inspection engineer &
inspector.

Sum= 34
PR-OP-1

22-10-2020

Purpose

ver the plant area to check,


HSE issues
ctions for day to day activities and
observation

to tank, jetty, loading bay and


rm product quantification and
wer support team & MRSS attenda
lectrical workshop
hnician
trician at Riverview

rom office building to remote area


ediate response for plant
inspection engineer & 03

You might also like