You are on page 1of 1

MINUTES OF MEETING - ROOTS & EATON FLUID POWER

Roots Multi Clean


Eaton Fluid Power (1) Gopala Krishnan (2) Murali
16.09.2020
(1) Mukesh.V (3)R.Ravichandra Gandhi (4)
R.Arunkumar (5) P.Sathishkumar

Sl NO ACTION POINTS Observations Further actions TGT DATE

1.Eaton will communicate these readings to to


Test conditions : 950 RPM, pressure mfg plant and will revet with feedback.
Failed VDP Sl.No190227R161334 swaaped to the good machine
1 spikes were abserved upto 200-220 Bar 26.09.2020
and Pressure mapping carried out
range. 2.Eaton requested to hold the pump for one
more week till source plant .

Pressure readings were observed in the


For comparison pressure mapping carried out in the machine Eaton will make comparison and share the
2 50-30 Bars at 950 RPM & 80-100 Bar at 20.09.2020
which was tested and ready dispatch Sl.190227R161276 pressure reading to MFG plant and to RMCL.
1850 RPM in all test conditions

1) To be expedited & RCA report to be shared


In process of dispatch to source plant To be updated by
3 Rejected two VDP's 2) Complete inspection report of three VDP's
for analysis-info shared by eaton eaton
to be shared to RMCL.

RCA mail to be shared on 25.02.2020


4 Failed wheel motor RCA report Feedback on CAPA to be shared 26.09.2020
which is received from MFG plant

Debit note for rework Charges.-RMCL Explained the tedious process


RMCL will share the raised Debit note
5 on mounting & unmounting of VDP & motor wheel due to To be regualarize by Eaton -
to M/s.Eaton over mail
repeated failures