Sl NO ACTION POINTS Observations Further actions TGT DATE
1.Eaton will communicate these readings to to
Test conditions : 950 RPM, pressure mfg plant and will revet with feedback. Failed VDP Sl.No190227R161334 swaaped to the good machine 1 spikes were abserved upto 200-220 Bar 26.09.2020 and Pressure mapping carried out range. 2.Eaton requested to hold the pump for one more week till source plant .
Pressure readings were observed in the
For comparison pressure mapping carried out in the machine Eaton will make comparison and share the 2 50-30 Bars at 950 RPM & 80-100 Bar at 20.09.2020 which was tested and ready dispatch Sl.190227R161276 pressure reading to MFG plant and to RMCL. 1850 RPM in all test conditions
1) To be expedited & RCA report to be shared
In process of dispatch to source plant To be updated by 3 Rejected two VDP's 2) Complete inspection report of three VDP's for analysis-info shared by eaton eaton to be shared to RMCL.
RCA mail to be shared on 25.02.2020
4 Failed wheel motor RCA report Feedback on CAPA to be shared 26.09.2020 which is received from MFG plant
Debit note for rework Charges.-RMCL Explained the tedious process
RMCL will share the raised Debit note 5 on mounting & unmounting of VDP & motor wheel due to To be regualarize by Eaton - to M/s.Eaton over mail repeated failures
R K Agrawal - "HOT SPOT" Temperature As Defined in The IS 2026-2IEC 60076-2 Importance Thereof As Diagnostic Tool in Conjunction With DGA-Citing A Case-Study