Daily Accomplishment Report

Cadet Engineer: Geomarc Yvann A. Castaneto


Company: Masinloc Coal Power Plant
Assigned Area: Turbine Area Unit 3

DAILY WORK ACTIVITIES


WEEK 1
NO. OF
DAY DATE DAILY ACCOMPLISHMENTS WORKING
HOURS

● Walk down and familiarization in the


whole Turbine Area and BOP
(Intake).

September 19, ● Troubleshooting of Trash Rake with


2022 the operator. After the trash rake
Monday 8
was fixed, we operated it to clean
(8am-5pm) the CWP suction intake.
● Identification and explanation of
equipment in BOP and Turbine area
with the operator.

Tuesday September 20, ● We accompanied the operator on 8


2022 the Turbine area for routine
inspection.
(4pm-12pm)

● Conducted BEC (Basic Equipment


Care) on the motors and pumps of
turbine area and checked if there is
any excessive vibration on the
equipment.
● Witnessed the regeneration and
backwashing of CPP resins in the CPP
vessel performed by the operator.

● Conduct routine inspection and


reading in turbine systems for
pressures, temperatures, oil levels of
equipment and valves.

● Sir Correa discussed boiler start up


system and instructed us to line
trace it on the P&ID for
familiarization and to better
understand the system.
September 21,
Wednesday 2022 8
(4pm-12pm)
● Continued BEC (Basic Equipment
Care) on the motors and pumps of
turbine area with the operator.
Monitoring of its vibration on drive
end and non-drive end side of the
pumps and motors.

● We also line traced the auxiliary


steam system and assisted the
operator for hydrogen filling of the
generator cooling system.

Thursday September 22, ● Usual routine inspection in the 8


2022 turbine and generator area with the
operator and reading of pressures,
(4pm-12pm)
temperatures, oil levels of major and
auxiliary equipment and valves.

● Assisted the operator in CTS Cleaning


of the condenser.
● Familiarization of turbine flow
system and reading of manuals using
flow diagrams and P&ID.

● Usual routine inspection in the


turbine and generator area with the
operator and reading of pressures,
temperatures, oil levels of major and
auxiliary equipment and valves.

● Assisted BOP operator in conducting


BEC (Basic Equipment Care) on
pumps and motors of BOP area.
Monitoring of its vibration on drive
September 23, end and non-drive end side of the
Friday 2022 pumps and motors. 8
(4pm-12pm)

● Witnessed the regeneration and


backwashing of CPP resins in the CPP
vessel performed by the operator.

● Question and answer discussion with


the operators about the turbine
systems, valves, major and auxiliary
equipment for data gathering and
additional information.

TOTAL NO. OF HOURS: 40 HOURS

Certified by:
Engr. Noel Ladringan
Immediate Supervisor