You are on page 1of 1

NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Weekly Inspection Checklist

Unit: FDAS Smoke Detector

Date of Inspection: ____________________ Date of Last Inspection _________________________

Check the following and functional testing.


ITEM FDAS SMOKE DETECTOR QTY G D R REMARKS
1. Zone No.1
Control room 4
MVSG 4
2. Zone No.2
Admin – Entrance 1
Admin – RPM Office 1
Admin – Conference Room 2
Admin Staff Room 5
3. Zone No. 3
MCC No. 1 6
Warehouse 3
Cable Tray 4
4. Zone No.4
Pump House 4
MCC No. 2 3

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: __________________ Noted By: _________________ Check By: ______________


Electrical Supervisor O & M Engineer Safety Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager