NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Motor Control Center No.1

Date of PMS: ____________________ Date of Last PMS: _________________________

Check the following components, fixed any defect and replace if needed.
ITEM Machine/ Electrical Equipments/Components G D R REMARKS
1 DC 24V Battery charger panel
2 DC 110V Battery charger panel
3 220V UPS Panel
4 UPS input TR panel
5 220V UPS dist panel
6 480V LV incoming panel
7 480V BSDG main panel
8 480V No.1 common MCC incoming panel
9 480V unit MCC incoming panel
10 480V unit MCC PLC panel
11 220V dist panel
12 220V No.1 common panel
13 480V No.1 common MCC PLC panel
14 480V No.1 incoming panel

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: ____________ Noted By: ________________ Check By: _________________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager