NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Pump motor’s and controller’s in pump house

Date of PMS: ____________________ Date of Last PMS: _________________________

Check the following components, fixed any defect and replace if needed.

ITEM Machine/ Electrical Equipment’s/Components G D R REMARKS


1 Heavy fuel unloading pump “A” 8.7kw
2 Heavy fuel unloading pump “B” 8.7kw
3 Heavy fuel transfer pump “A” 3.5kw
4 Heavy fuel transfer pump “B” 3.5kw
5 Heavy fuel supply pump “A” 3.5kw
6 Heavy fuel supply pump “B” 3.5kw
7 Diesel fuel unloading pump 4.7kw
8 Diesel fuel supply pump “A” 3.5kw
9 Diesel fuel supply pump “B” 3.5kw
10 Lube oil unloading pump 3.5kw
11 Lube oil loading pump 3.5 kw
12 No.1 and No.2 H.F.O purifier control panel

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: ____________ Noted By: ________________ Check By: _________________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager