NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Cooling Fan, Submersible Pump, water pump and Oil Separator Pump.

Date of PMS: ____________________ Date of Last PMS: _________________________

Check the following components, fixed any defect and replace if needed.

ITEM Machine/ Electrical Equipment’s/Components G D R REMARKS


1 Oil Separator No. 1 1.5kw Motor and Control
2 Oil Separator No.2 Motor and Control 5.5 kw
3 Water Pump for SCAA Camp 0.75 kw
4 Air Vent No.1 Motor and Control 2.2 kw
5 Air Vent No.2 Motor and Control 2.2 kw
6 Air Vent No.3 Motor and Control 2.2kw
7 Cooling Fan Motor and Control 1.1kw 69kv
Transformer
8 Cooling Fan Motor and Control 0.37kw Battery
Station 69kv Substation
9 Cooling Fan Motor and Control 0.37kw Battery
Station Power House
10 Submersible Pump No.1 Motor and Control
7.5kw (Gate No.1)
11 Submersible Pump No.2 Motor and Control
1.5kw (Gate No.1)
12 Submersible Pump Motor and Control 1.1kw
(Cable Trench)

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: _____________ Noted By: ________________ Check By: _______________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager