NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Fire Pump

Date of PMS: ____________________ Date of Last PMS: _________________________

Check the following components, fixed any defect and replace if needed.

ITEM Machine/ Electrical Equipment’s/Components G D R REMARKS


1 Check output voltage of main circuit breaker
2 Check controller of of 37kw fire pump
3 Check controller of jockey pump.
4 Check timer and terminals.
5 Check relaying.
6 Check battery charger of diesel pump.
7 Check auto – manual of 37kw, jockey and diesel pump.
8 Check pressure switch of 37kw fire pump
9 Check pressure switch of jockey pump.
10 Check pressure switch of diesel pump.
11 Check battery and v-belt tension of diesel pump.
12 Check raceway.
13 Check terminals block and retightened.
14 Check Sel. Switch.
15 Check motor insulation resistance of 37kw main drive
16 Check insulation resistance of of jockey pump.
17 Clean up control panel.
18 Check up all valve.

Other Activities:

Legend:
G – Good D – Defective R – Replace

Performed By: _____________ Noted By: ________________ Check By: _______________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager