Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

SYNCHRONIZATION PROCEDURE WITH NGCP

PROCESS – SYNC-IN TO GRID RESPONSIBLE


Inform NGCP BuACC,MRCC
- Switch Board Control Operator
& PLACER prior schedule of
the SYNC-IN time through
SMS/MMS.

Inform NGCP BuACC &


MRCC 10 minutes before - Switch Board Control Operator
the time schedule of
synchronization through
phone call.

Inform NGCP MRCC for the - Switch Board Control Operator


time of synchronization to
grid through phone call.

PROCESS – SYNC-OUT TO GRID RESPONSIBLE

Inform NGCP BuACC,MRCC


& PLACER prior schedule of - Switch Board Control Operator
the SYNC-OUT time through
SMS/MMS.

Inform NGCP BuACC &


MRCC 10 minutes before - Switch Board Control Operator
the time schedule of SYNC-
OUT through phone call.

Inform NGCP MRCC for the


time of SYNC-OUT to grid
- Switch Board Control Operator
through phone call.