NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Electric Motor’s Pump House.

Date of PMS: ____________________ Date of Last PMS: _________________________

Check insulation resistance of the following electric motor’s.


ITEM Machine/ Electrical Equipment’s/Components G D R Insulation resistance
1 Motor 7.5kw F.O Purifier No.1
2 Motor 7.5kw F.O Purifier No.2
3 Motor 1.1kw Sludge Pump
4 Motor 600W Water Pump
5 Motor 1.8kw Feed Pump No.1
6 Motor 1.8kw Feed Pump No.2
7 Motor 3.5kw Lube Oil Loading Pump.
8 Motor 3.5kw Lube Oil Unloading Pump
9 Motor 3.5kw Diesel Fuel Supply Pump A
10 Motor 3.5kw Diesel Fuel Supply Pump B
11 Motor 4.7kw Diesel Fuel Unloading Pump
12 Motor 3.7kw Heavy Supply Fuel Pump A
13 Motor 3.7kw Heavy Supply Fuel Pump B
14 Motor 3.5kw Heavy Fuel Transfer Pump A
15 Motor 3.5kw Heavy Fuel Transfer Pump B
16 Motor 8.7kw Heavy Fuel Unloading Pump A
17 Motor 3.5kw Heavy Fuel Transfer Pump B
18 Motor 0.64kw Diesel Portable Pump
Remarks:

Legend:

G – Good D – Defective R – Replace

Performed By: _____________ Noted By: ________________ Check By: _______________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager