You are on page 1of 1

.

NAC Diesel Power Plant


Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Radiator Control Panel 1,2, 3 and Air Intake Control panel 1,2,3.

Date of PMS: ____________________ Date of Last PMS: _________________________

Check the following components, fixed any defect and replace if needed.

ITEM Machine/ Electrical Equipment’s/Components G D R REMARKS


1 Radiator Control Panel No. 1 and 6 unit Motor’s
2 Radiator Control panel No.2 and 6 unit Motor’s
3 Radiator Control Panel No. 3 and 6 unit Motor’s
4 Air Intake Control Panel No.1
5 Air Intake Control Panel No.2
6 Air Intake Control Panel No.3

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: ____________ Noted By: ________________ Check By: _________________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager