TRINIDAD AND TOBAGO ELECTRICITY COMMISSION

DISTRIBUTION NORTH UTILIZATION SECTION

LOAD DETAIL FORM PER METER


DATE: __________________ REQUEST ID/SURVEY#: ___________________

CUSTOMER OR COMPANY NAME:


___________________________________________________

SERVICE ADDRESS: __________________________________________________________________


NOTE: EACH FORM WILL REPRESENT ONE (1) METER. PREPARE SEPARATE FORMS FOR MULTIPLE
METERS
CHARACTERISTICS OF SUPPLY

Splitter Unit ☐Yes ☐No


Main Cable Size (mm2) _________________

Sub – Cable Size for this meter (mm2) _________________

Time Frame for Installation of Meter: __________________ Months


(See Item 1 in the Additional Guidelines on reverse side)

Voltage Supply Single Phase ☐ 115/230 V


Three Phase ☐ 115/230 V ☐ 230/400 V ☐ 12,000 V

ACCOUNT INFORMATION
☐ Existing ☐ New ☐ Future

If Existing, State Meter Number: ___________________________

FOR T&TEC USE ONLY:


Purpose of Meter: __________________________
___________________________________________ ☐ Residential ☐ Commercial ☐ Industrial

Electrician’s Name: _________________________ Electrician’s Signature: ______________________

Wireman’s Licence Number: _________________________

Customer’s Name: _________________________ Customer’s Signature: _______________________


Page 1 of 2 QF 7.3-1.7-h Rev. # 1
Rev. Date: Nov 2020
GUIDE TO COMPLETING THE FORM
All equipment to be used at the installation must be listed together with their characteristics of supply which includes
operating voltage; operating current; equipment rating; single/three phase.
Additional Guidelines: -

1. If the time frame for installation of a meter exceeds six (6) months, the job will require reevaluation before
proceeding.
2. If a power rating (kVA) is available, then this should also be stated.
3. For Air Conditioning equipment, the rating in Tons or Btu should be stated.
4. The number and type of lights must be stated (e.g. compact fluorescent; LED; bay lighting; perimeter lighting)
5. The number of outlets for general use must be stated. Note: Outlets utilized for equipment separately stated
should not be included here.
6. For multi-metered premises, the equipment contained in each installation must be separately listed. This should
be done for both existing and proposed meters.
N.B. – Actual equipment ratings and NOT circuit breaker sizes must be submitted in the load detail.
EXAMPLE: 1

EXAMPLE: 2

Page 2 of 2 QF 7.3-1.7-h Rev. # 1


Rev. Date: Nov 2020