PRE- INSTALLATION SERVICE REPORT Page No.

1 of 3

LAKSHMI WINDER LW72 Date:

Name of the Customer: _____________________________________________ Place: ________________________

Name of the Inspector: _____________________________________________ Branch: _______________________

Name of the Mill’s Incharge: _________________________________________ No. of M/cs:____________________


Please specify
the relevant No. If no/partial,
1 = Yes/Ready please specify
CHECKPOINTS DETAILS/REFERENCE 2 = Partial target date:
3 = No/Not dd/mm/yy
Ready

1. Readiness of floor Floor variation - up to 5mm/ m to 20mm/ _____ ___/___/20___


M/c length

2. Downward suction air discharge 5 Feet x 5 Feet _____ ___/___/20___


trench size

3. Electrical cable hole opening is as Refer Machine layout No(LH-60 W 001, _____ ___/___/20___
per layout RH -60 W 002 )

4. Compressor air hole opening is as Refer Lakshmi Winder LW72 Instruction _____ ___/___/20___
per layout with 1” GI pipe Manual page no: 19

5. Machine width 2200 mm (including OHTC suction & _____ ___/___/20___


blowing tubes )

6. Machine center to center distance Minimum 2600 mm: _____ ___/___/20___


*Actual Distance at site is _________

7. Space required from wall to Minimum 1100 mm


machine back side *Actual Distance at site is _________ _____ ___/___/20___

8. Space required from wall to Minimum 1500 mm


machine Head stock included *Actual Distance at site is _________ _____ ___/___/20___
empties collection box

9. Space required from Tail end Minimum 1000 mm


(including OHTC support ) to wall *Actual Distance at site is _________ _____ ___/___/20___

10. Gap required above the top of Minimum 500mm


OHTC *Actual Distance at site is _________ _____ ___/___/20___

11. Downward suction air Discharge 400mm x 700mm _____ ___/___/20___


duct opening Refer machine layout 60W001 & 60W002

12. Downward air discharge Should not be connected with common _____ ___/___/20___
connection trench with Ring frame to avoid back
pressure.

13. Minimum vaccum level at 15 mmwc _____ ___/___/20___


machine
Connection point

* Please attach machinery layout at customer end for group of machines / individual machines
LMW / GS/ PRE / 6000 A 07 / 2017
PRE- INSTALLATION SERVICE REPORT Page No. 2 of 3

LAKSHMI WINDER LW72 Date:

Please specify
the relevant No. If no/partial,
1 = Yes/Ready please specify
CHECKPOINTS DETAILS/REFERENCE 2 = Partial target date:
3 = No/Not dd/mm/yy
Ready

ELECTRICAL POWER

1) Installed power and voltage 33 KW , 3 Phase 415V/50Hz _____ ___/___/20___

2) Cable Requirement - From panel to 25 sq.mm , 4 core copper flexible _____ ___/___/20___
each machine Cable. Actual cable size is _________

3) Voltage stabilizer requirement

A. Rating of stabilizer 50 Kva per ACP( 60,64 sples) _____ ___/___/20___


55Kva for 72 sples
Rating of stabilizer is ___________
_____ ___/___/20___

B. Peak current capacity 80A for 5sec


_____ ___/___/20___
C. Output voltage setting 414 V + 2 V

D. Higher capacity stabilizer for a Individual stabilizer to be provided for _____ ___/___/20___
group of machines every machine. Installation of higher
capacity stabiliser for a group of
machines is not accepted

COMPRESSED AIR

A. Quantity & Input Pressure

I) For 60 spindles 13 - 15 CFM per machine, 7 to 8 bar _____ ___/___/20___

ii) For 64 spindles 14 - 16 CFM per machine, 7 to 8 bar _____ ___/___/20___

iii) For 72 spindles 16 - 18 CFM per machine, 7 to 8 bar _____ ___/___/20___

B. The quality of compressed air Free from oil, moisture and dirt free
,the drier and filter are important _____ ___/___/20___
at machine input side

C. Pneumatic pipe line Minimum 1 inch pipeline required at _____ ___/___/20___


machine input from main line
2 inch (or) 3 inch pipeline (minimum)
required from reservoir tank

E. Machine cleaning point A separate air outlet from main line for _____ ___/___/20___
mc cleaning purpose for every 3 mcs.
Cleaning air should not be taken from
mcs

LMW / GS/ PRE / 6000 A 07 / 2017


PRE- INSTALLATION SERVICE REPORT Page No. 3 of 3

LAKSHMI WINDER LW72 Date:

Please specify
the relevant No. If no/partial,
1 = Yes/Ready please specify
CHECKPOINTS DETAILS/REFERENCE 2 = Partial target date:
3 = No/Not dd/mm/yy
Ready
ROOM TEMPERATURE

A. Winding dept. Room temperature 22 - 27* C _____ ___/___/20___

B. RH % Level 55 - 65 _____ ___/___/20___

Remarks:
_____________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

Note: If the above points are partial / not ready, target date / minutes of meeting to be enclosed

Kindly enclose the TDS of the respective machine along with the Pre Installation Service Report.

MACHINERY LAYOUT - Shows the layout of entire range of machines in the mill.

FOUNDATION DRAWING - Shows the pneumafil exhaust trench opening, compressed air hole opening of all the machines. These
layouts are supplied by LMW/VOLTAS/SSIL

Signature of the Engineer Signature of the customer with seal