You are on page 1of 1

NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.

Unit: Electric Motor’s Radiator Cooling Fan.

Date of PMS: ____________________ Date of Last PMS: _________________________

Check insulation resistance of the following electric motor’s.


ITEM Machine/ Electrical Equipment’s/Components G D R Insulation resistance
RADIATOR No. 1
1 Cooling Fan Motor No. 1
2 Cooling Fan Motor No. 2
3 Cooling Fan Motor No. 3
4 Cooling Fan Motor No. 4
5 Cooling Fan Motor No. 5
6 Cooling Fan Motor No. 6
RADIATOR No. 2
7 Cooling Fan Motor No. 1
8 Cooling Fan Motor No. 2
9 Cooling Fan Motor No. 3
10 Cooling Fan Motor No. 4
11 Cooling Fan Motor No. 5
12 Cooling Fan Motor No. 6
RADIATOR No. 2
13 Cooling Fan Motor No. 1
14 Cooling Fan Motor No. 2
15 Cooling Fan Motor No. 3
16 Cooling Fan Motor No. 4
17 Cooling Fan Motor No. 5
18 Cooling Fan Motor No. 6
Remarks:

Legend:

G – Good D – Defective R – Replace

Performed By: _____________ Noted By: ________________ Check By:_______________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager