NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Weekly Inspection Checklist

Unit: Foam Fire Suppression System

Date of Inspection: ____________________ Date of Last Inspection _________________________

Check the following and functional testing.


ITEM Foam G D R REMARKS
1 HFO Storage Tank Cooling
2 Settling Tank Cooling
3 HFO/LO/DO/Tank Cooling
4 Sludge Tank Cooling
5 HFO Storage Tank Foam
6 Settling Tank Foam
7 HFO Service Tank Foam
8 D.O. Service Tank Foam
9 Diesel Fire Pump Bunb Wall Foam

Other Activities:

Legend:

G – Good D – Defective R – Replace

Performed By: __________________ Noted By: _________________ Check By: ______________


Electrical Supervisor O & M Engineer Safety Engineer

Approved By: Matiniano M. Montemor


Resident Plant Manager