Professional Documents
Culture Documents
○ ing
● Inform
○ Instruction
Briefing Materials
• Safety Precaution
• Preventive Plumbing Monitoring
• Corrective Action
• Direct Request Handling
• Daily report & Updates
Participants
Supervisor : Uta Domas R.
Technician :
1. Abdul Wahab 3. Karnudin 5. Eben Ezer Hasibuan
2. Chaerul Anwar 4. Rinaldi Wiranata
Attendance :
Regular Hour Man Power
(08:00 ~ 17:00)
Position Total Present Permissi Sick Leave
on Leave Leave
Supervisor 1 1
Staff 5 5
Mech: 0 Civ: 0 - - -
TODAY ACTIVITY NEXT DAY PLAN
Assembly
1 Assembly Shop PL Plumbing Monitoring PL Plumbing Monitoring Routine
Shop
10
Building Maintenance
Routine Monitoring:
“Plumbing Monitoring”
1
Building Maintenance Preventive Activity
Plumbing Monitoring
Shop Area : Assembly Shop
Issue(s) Found : 24
1 BODY SHOP Lobby Entrance Repair loose ceiling in body shop RO-0231
N Area
Code Description Before After Remarks
o Detail Location
Utility Center
Repair cracked wall in
1 FN-1278
utility substation
On Progress
Substation
Main Gate
Repair moldy ceiling
2 RO-0232
in main gate
Closed
All Area
2 Utility Center ARC Repair cracked wall in utility substation On progress Repair
3 Main Gate ARC Repair moldy ceiling in main gate Done Repair
4 Gate 1 ROOF Repair leakage from roof in Gate 1 House guard Done Repair
10