Project Nasma Community Centre Inspection Date 22-Apr-21

SL No. Unit type Area Contractor Details Photo 1 Photo 2


COMMENT LIST 3- NASMA COMMUNITY CENTRE (NCC)- MALE & FEMALE SWIMMING POOL TOILETS

1 Major Male Pool Toilet Door Excess gap around steel door. Poor sealant application.

2 Major Male Pool Toilet Door Scraches on door shutter.

3 Major Male Pool Toilet Door Poor door paint touchup

4 Major Male Pool Toilet Door Gaps around hinges in slot. Need proper fixing

5 Major Male Pool Toilet Door Door not closing properly. Approved gasket to be used

Page 1 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

6 Male Pool Toilet Door Poor sealant application and excess gap around door

Male Pool Toilet-


7 Door Poor sealant application around door.
Janitor room

8 Male Pool Toilet Tiles Dents on floor manhole frame

9 Male Pool Toilet Tiles Grouting around manhole cover

10 Major Male Pool Toilet Vanity Corian top vanity- color variation

11 Male Pool Toilet Tiles Excess tile cutting and grouting around floor cleanout

Page 2 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

12 Major Male Pool Toilet Vanity Mark on vanity. To be rectified/cleaned

13 Major Male Pool Toilet Vanity Chipped edge of vanity.

14 Major Male Pool Toilet Vanity Exposed services under vanity. To be concealed

Finishing around ceiling fixtures and access panels.


15 Major Male Pool Toilet Ceiling
Ceiling paint

Finishing around ceiling fixtures and access panels.


16 Major Male Pool Toilet Ceiling
Ceiling paint

Loose sprinkler cover. Ceiling finishing and paint to


17 Major Male Pool Toilet Ceiling
improve . Sealant around to be removed

Page 3 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

Excess tile cutting around floor drain, Clean the gaps


18 Male Pool Toilet Tiles
around.

Missing toilet acccessories - Trash bin, Tissue roll


19 Major Male Pool Toilet Accessories
dispenser etc. 01 Soap dispenser not fixed

20 Major Male Pool Toilet Tiles Stain marks on floor tile. To be cleaned

Poor finishing around flush sensor button .Chipped tiles


21 Major Male Pool Toilet Wall
around

22 Male Pool Toilet Tiles Tile wall edges- Grouting and finishing to improve

Male Pool Toilet-


23 Major Wall Poor wall finish.Undulation on wall observed
Janitor room

Page 4 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

Male Pool Toilet-


24 Major Door Door paint scrateches
Janitor room

25 Major Male Pool Toilet Door Gap under door bottom seal

Dents on escutcheon plate. Use approved lock cylinder


26 Major Female Pool Toilet Door
material

Door silencer missing. Cleaning and proper finishing


27 Major Female Pool Toilet Door around striker plate. Door Improper installation. Non
uniform gap. Lock to adjust

Excess gap and poor sealant around door. Door frame


28 Female Pool Toilet Door
not levelled in plane with wall.

29 Major Female Pool Toilet Ceiling Cracks on ceiling edges and ceiling paint

Page 5 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

30 Female Pool Toilet Ceiling Finishing around ceiling fixtures and paint

31 Major Female Pool Toilet Tiles Manhole tiled cover not levelled

WC cover to be fixed. Missing Toilet accessories, trash


32 Major Female Pool Toilet Accessories bin and Tissue roll dispenser. Tissue dispenser in toilet
missing. Others to be fixed using screws

33 Female Pool Toilet Ceiling Gypsum to cubicle wall termination to improve

34 Female Pool Toilet Door Poor finishing around door. Poor sealant application.

35 Female Pool Toilet Door Scratches on door closers

Page 6 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

Female Pool Toilet-


36 Major MEP Incomplete works in janitor room
Janitor Room

Female Pool Toilet-


37 Wall Wall undulations and poor painting works
Janitor Room

Female Pool Toilet-


38 Ceiling Shadow gap joint and finishing to improve
Janitor Room

Female Pool Toilet-


39 Major Door concrete Filling in frame not completed
Janitor Room

Female Pool Toilet- Finishing around door lock plate.Striker plate screws.
40 Major Door
Janitor Room Hole cover on frame missing

41 Major Pool Male Washroom Door Pool male washroom door not close properly FM Comments

Page 7 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

42 Major Pool Male Washroom Cleaner room Pool male washroom cleaner room

43 Pool Male Washroom cubical Pool male washroom cubical one wall found scratches

pool male washroom man hole cover not proper fixed


44 Major Pool Male Washroom Washroom
hse concern

45 Major Pool Male Washroom Washroom Pool washroom hand washbasin sheet 2 different color

Pool male washroom near tissue dispenser floor tile


46 Pool Male Washroom Washroom
color faded

Page 8 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

47 Major Pool Male Washroom Washroom Pool male washroom celling access not proper closed

48 Major Pool Male Washroom Washroom Pool male washroom door found scratches

Pool male washroom thermostat loose condition and


49 Major Pool Male Washroom Washroom
cover not fixed

Pool Female
50 Major Washroom Pool female washroom wc cover not fixed proper
washroom

Pool Female
51 Major Cubical 1 Pool female washroom cubical 1 sensor not working
washroom

Page 9 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

Pool Female
52 Washroom Pool female washroom celling required to putty
washroom

Pool Female Pool female washroom cubical 2 entrance floor tile


53 Washroom
washroom found scratches

Pool Female
54 Major Washroom Pool female washroom door found scratches
washroom

Pool Female
55 Major Washroom Pool female washroom door not proper closed
washroom

Pool Female Pool male washroom washbasin sheet found black


56 Major Washroom
washroom scratches

Page 10 of 11 Nasma Community Centre- Comment list


SL No. Unit type Area Contractor Details Photo 1 Photo 2

Paint around ceiling fixtures, Toilet accessories missing,


Door touchup and poor sealant around.Door stoppers
57 Major General General for steel doors not fixed. Door dust proof floor socket
Approved door cylinder material to install. Floor tile
cleaning. Water leak marks on ceiling

Page 11 of 11 Nasma Community Centre- Comment list