SI. DESCRIPITION/ACTIVITES TO BE SNAGS TO BE RECATIFED


NO COMPLITED/BENDING SNAGS
1. All Window wall Corner to be straight angle and
RMO Windows wall Corners undulations and damaged corners to be packed with POP, Excess
damages, excess white cement, POP pastes seen. cement paste to removed.
2. RMO Electrical switch box, led light box corner gaps All Electrical box Gaps fill with White cements
seen and neat finish before Final coat
3. All paint stains to be removed by tile stain
remover, next time before painting kindly ensure
RMO Floor, wall tiles paint stains, Excess white the plastic sheets to be covered the floor wall tiles
cement paste, cement slurry stains seen. for protect the tiles from tiles from stains
4. RMO core cutting drill holes (holes made for electrical Neaten finish at drill holes and ensure before final
pipelines) seen coat painting work
5. RMO skirting tile above, Tile hair cracks to be treated with White cement,
Hair crack observed at joints. Nito Bond SBR latex mix

6. Neaten grout finish at floor, wall tile with


LATAPOXY® SP-100 Stain free Epoxy Grout
RMO wall, floor tile joint gaps observed.
7. Remove paint and white cement stains from wall
cladding top (at ceiling junction), kindly ensure the
Excess paint, white cement from wall cladding top (at paint tape to be used for paint border line marking
ceiling junction) and control excess paint stains spreading on ceiling.

8. In RMOs till some of the electrical fixtures (Switch All electrical fixtures should be installed before
box, lights, electrical supply lines) not installed. final coat
9. RMO documentation room broken tiles seen (for Broken tiles to be replaced with new one
electrical lines)
10. After Ac Drainpipe hole to be packed with white
cement and smooth finished, uniform painting
AC Drainpipe hole still not closed but painting work is work to be done.
in progress
11. Hair cracks to be treated with cement, Nito Bond
RMO terrace coving cracks observed SBR latex mix and proper curing to be provide.
12. RMO UPVC windows free flow movement stuck due All windows stuck to be rectified and provide
to debris, dust and insufficient lubricant. sufficient lubricants.
13. All walls, ceiling should be looking straight angle
RMO wall, ceiling corner damages and undulations and, undulations to be treated with proper white
cracks seen cement packing before final coat painting work
14. Before false celling work kindly ensure all celling
RMO wall ceiling cement slurry, unpacked electrical putty touch of work and electrical pipeline core
pipeline core cutting holes seen cutting packing to be done.
15. RMO terrace parapet wall granite comer cracks parapet wall granite comer cracks undulations
undulations seen packed with proper granite fixing
16. RMO staircase SS handrail fixing end portion gaps and All ss handrail hollow space should be packed
hollow space seen with cement grout.it should be rigid in position
1
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

17. RMO terrace rainwater drainpipe core cutting hollow Rainwater drainpipe core cutting should pe packed
space seen with cement concrete Nito bond latex mix
18. All paint stains to be removed by tile stain
B block Ramp Floor tiles paint stains, Excess white remover, next time before painting kindly ensure
cement paste, cement slurry stains seen. the plastic sheets to be covered the floor wall tiles
for protect the tiles from tiles from stains.
19. B block Ramp aluminum glazing, gaps between Aluminum panels gaps filled with grout sealant.
aluminum panels and wall seen.
20. B block Ramp SS handrail fixing end portion gaps and SS handrail end portion hollow space should be
hollow space seen, on handrail excess white cement sealed with cement group, it must be rigid. Excess
paste seen paste on handrails should be removed
21. All wall corner damages and undulations should be
B block Ramp wall corner damages, painting wall packed with white cement paste, cement and other
putty work undulations, cement slurry stains seen stains should be removed before final coat painting
work
22. All broken POP boards should be replaced with
B block Ramp seen three broken POP boards. new one, kindly take of avoid further broken
23 B block Ramp connecting corridor brick work excess Kindly ensure the brick work mortar thickness
thickness of mortar provided. should not exceed with 10 mm.
24. Beam honeycombs treated with Nito Bond SBR
B block Ramp connecting corridor beam honeycombs
latex and, uneven surface finished with proper
and uneven surface finish seen
cement mortar
25 All cracks to be treated with cement, Nito Bond
SBR latex mix and proper curing to be provide.
B block Ramp entrance west side wall cracks observed
Kindly attend the crack work before final coat
painting work.
26. Kindly ensure the plastering mortar mixing ratio,
B Block 2nd floor wardroom toilet plastering surface
ensure the curing, observed cracks should be
cracks observed
repaired with Nito bond cement mortar mix.
27. Kindly ensure the apply a thin layer of mixed
B block RENACON (AAC Block work) done with adhesive on the AAC blocks in the thickness of 3
Excess mortar thickness to 5 mm by using proper trowel on which the block
work is to be carried out
28. All electrical core cutting to be packed with
B block 1st,2nd,3rd, floor electrical core cutting and still cement mortar with proper water cement ratio,
some electrical fixture bending work to be done electrical fixture to be installed before wall painting
work
29. All improper wall finish should be done with
B block ramp columns, wall improper wall putty finish
proper putty finish, corners should be right angle,
seen
before final coat kindly ensure wall putty work
30. Replace the cracked granite with new one, before
B block second floor staircase granite crack observed,
granite laying kindly ensure the thread rise
Rise thread variations observed kindly ensure the
variations correction to be required.
31. B block existing structure column, beam plastering Before plastering work kindly ensure the hacking
without chipping and hacking. and chipping work

2
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

32. B block 1st and second floor ward rooms existing wall Before wall and ceiling painting work all cracks to
cracks accrued be repaired.
33. B block toilet room after toilet water proofing still Kindly ensure the all the core cutting activities to
some electrical line core cutting, plumping line work be completed before water proofing work
in progress, it affects the water proofing membrane
water resisting capacity
34. B block terrace connecting corridor slab undulations All undulations to be chipped and honeycombs
minor honey comps seen packed with proper repair work methodology.
35. B block ramps area still some concrete debris, cement All cement mortar, concrete debris to be cleaned
mixing waste mortars seen, it created dust formation on be before final coat of paint.
putty finished wall surface.
36. B block fly ash brick work without chicken mesh Kindly ensure all brick work and concrete member
provision for brick work and concrete structural connecting points chicken mesh must be provided.
members (beam, column) observed.
37. B block ramp aluminum glazing work area windows Damaged windows corners to repaired with white
corner damaged. cement mix, all windows corners to be right angle.
38. B block 2nd floor proper toilet tile marking not Before completion of plumbing and electrical
provided. fixture line kindly ensure the toilet tile marking
39. B block plaster work m. Sand quality must be checked, Before plastering work kindly ensure the quality
fine grinned m. Sand used, it creates cracks sudden of m. Sand to be used, it should be coarse grinned
water evaporation during plastering work. free from debris and low silt content
40. B block RENACON (AAC Block work) brick work Ensure the AAC block work to done with level
offset, improper sill level finds marking and provide proper sill level.

RMO Windows wall Corners undulations and damages, excess white cement, POP pastes seen.

3
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

RMO Electrical switch box, led light box corner gaps seen.

RMO Floor, wall tiles paint stains, Excess white cement paste, cement slurry stains seen.
4
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

RMO core cutting drill holes (holes made for electrical pipelines) seen.

RMO skirting tile above, Hair crack observed at joints.

5
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

RMO wall, floor tile joint gaps observed.

Excess paint, white cement from wall cladding RMO ceiling unpacked electrical pipeline core cutting
holes seen.

RMO terrace parapet wall granite comer cracks undulations seen.

6
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

RMO staircase SS handrail fixing end portion gaps and hollow space seen.

RMO terrace rainwater drainpipe core cutting. B block Ramp Floor tiles paint stains, white cement paste
hollow space seen.

B block Ramp aluminum glazing, gaps between B block Ramp wall corner damages, painting wall putty
aluminum panels and wall seen. work undulations, cement slurry stains seen.
7
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

B block Ramp entrance west side wall cracks observed B block Ramp seen three broken POP boards.

B block Ramp connecting corridor brick work excess B block Ramp connecting corridor beam honeycombs
thickness of mortar provided.

B block Ramp connecting corridor uneven surface finish seen.

8
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

B Block 2nd floor wardroom toilet plastering surface cracks observed

B block RENACON (AAC Block work) done with B block RENACON (AAC Block work) brick work
Excess mortar thickness. offset.

B block RENACON (AAC Block work) improper B block 1st,2nd,3rd, floor electrical core cutting and still
block joint work with existing structure. some electrical fixture bending work to be done.

9
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

Due to electrical, plumbing work core cutting


affect the water proofing membrane.

B block ramps area still some cement slurry, B block toilet room after toilet water proofing still
concrete debris, cement mixing waste mortars seen some electrical line core cutting, plumping line work.
in progress it affects the water proofing membrane

B block terrace connecting corridor slab undulations B block granite laying incomplete wok, skirting tile
minor honeycombs seen. Skirting tile work bending.

B block existing structure column, beam plastering RMO before false ceiling complete the putty finish need
without chipping and hacking
10
REVANTHA SERVICES PRIVATE LTD

DEPARTMENT QUALITY MANUAL - CONSTRUCTION


MASONIC HOSPITAL BENDING CIVIL SNAGS WORKS
(CONSTRUCTION QUALITY OBSERVATIONS)

RMO terrace coving cracks undulations seen. B Block granite improper finishing

. B Block granite work improper finishing B block ramp putty work color different shades acquired.

B block ramp tile stains, excess white B block ramps area still some cement slurry seen after
cement paste seen putty work.