You are on page 1of 4

September 6, 2021

SCOPE OF WORKS AND SPECIFICATION


Client: Maria Ramirez
Project Name: Two Storey Apartment Building
Location: Nueva Ecija
Project ID: 12345678
Building Footprint: 237.1 m2
Building Height: 8.3 m

DIV Description of Work Specification


I GENERAL REQUIREMENTS
The construction of the building must abide The construction shall abide with the
with the standard references used in the planning, requirements of the National Building Code of
must be executed with first class workmanship to the Philippines, National Structural Code of the
the fullest talent, and compliance with the plans Philippines, even the local rules and regulation
and specifications to finish the project satisfying implemented in the municipality of
both the owner and engineer. Bayombong.

II EXISTING CONDITIONS
A. Site Clearing
The construction site shall be cleared of  Rubbish removed shall be legally and
grasses, rubbish or any other perishable and properly disposed of.
objectionable materials that may affect the
construction.

B. Staking of Building Lines  All grades shall be indicated on the


Stakes shall be accurately placed in the batter board.
building line and batter boards shall be erected
afterwards in such point where they will not be
disturbed during the excavation of the
footings.

III EARTHWORKS
A. EXCAVATION
All excavations shall be made to grade  The excavation for footing shall be made
indicated in the drawings. deeper until the stratum for safe bearing
capacity of soil is reached.

B. BACKFILLING  Backfilling shall be placed not


After all concrete foundations undergone exceeding 200mm thickness and each
curing and hard enough to withstand pressure layer shall be thoroughly compacted by
resulting to fills, the materials excavated shall tamping.
be used for backfilling.

VI CONCRETE WORKS
The work in this division shall include the  Republic Portland Cement or any other
complete concrete works for the building in approved cement shall only be used.
accordance with the specification for concrete  Gravel and sand shall be taken from
materials adopted by the government. approved sources and shall be clean,
hard, and free from any rubbish
materials.
 Water to be used for mixing concrete
shall be clean and free from injurious
amount of oil, acids, alkaline, salts and
other organic materials.
 The following proportion of concrete
shall be used for the various parts of the
building unless otherwise indicated in
the drawing.
Columns and Footings Class A: 1:2:4
Reinforced Concrete Beams Class A: 1:2:4
Concrete Slab Ground Floor on Fill Class B:
1:2.5:5
Concrete Slab Ground Floor on Fill Class B:
1:2.5:5
CHB Footing Class A: 1:2:4
 Concrete slab on fill shall be poured on
a gravel bed of not more than 150mm
thick. Each concrete slab shall be
poured until the indicated floor finish.

V MASONRY WORKS
All concrete hollow blocks to be used shall be The mixture for cement plaster for CHB
100mm thick, unless otherwise indicated, with wall finishes indicated in the drawing shall be 1
concrete mix in the hollow core. part cement and 2 parts sands.

VI REINFORCING STEEL BARS


Reinforcing bars use in the foundation,
columns, beams, ground floor and upper floor
slab, exterior and interior wall shall follow the
indicated details in the structural plan.

VII INTERNAL FINISHES


A. Floor Finishing
 Bedrooms and Stock Room Vinyl Tiles Wood Design (Scarlet Oak): 12” x
12”
 Living Area and Hallway
White Polished Ceramic Floor Tiles: 600mm x
600mm)
 Kitchen
(Anti-slip home decorative rustic porcelain tile
matte color dark gray: 600mm x 600mm)
 Comfort Rooms
(Mariwasa Ceramic Tiles Pathway Grey:
B. Wall Finishing 600mm x 600mm)
 Exterior Walls
Plain Cement Plastered finish on both side
unless other specified and Finishing Painted
with Boysen Acytex Paint.
 Interior Walls
Plain Cement Plastered finish on both side
unless other specified and Finishing Painted
with Boysen Acytex Paint.
C. INTERIOR CEILING
4’ X 8’ X 9mm Gypsum Board (ceiling board,
moisture resistant
VIII ROOFING
A. The type of roof to be used shall be the
asphalt shingle roofing.
 Roof Framing Steel Trusses, Rafters, and Painted in Epoxy Paint Finish, Treated Wood
Purlins Battens

 Gutter 0.40mm Pre-painted Spanish Type Gutter

 Fascia 18mm thick Hardiflex Fiber-Cement Sheets in


Boysen Semi-gloss Latex Paint Finish on Wood
Nailers

 Eaves Ceiling Spandrel 6” effective width (beige)

IX WATERPROOFING
T & B Floors slabs shall be waterproofed. T & B shall be Torched-on Concealed Type
Waterproofing.
X DOORS
A. Entry Krosswood doors 36” x 80” in Rustic Knotty
Alder Left Hand Clear Low E Glass 9 lite
provincial stained wood single pre-hung swing
door
B. Bedroom and Stock Room 44mmm thk. Tanguile Plywood Panel on Solid
Wood Frame and Jamb, single leaf swing type
door
C. T & B Of Den 44mmm thk. Tanguile Plywood Panel
on Solid Wood Frame and Jamb w/ Louvers,
single leaf swing type door)

XI WINDOWS
A. BEDROOM ¼” thk. Tinted glass on anodized ‘analok’
aluminum frame, sliding type window

¼” thk. Tinted glass on anodized ‘analok’


B. LIVING AREA aluminum frame, sliding type window

XII FIRE SUPRESSION


The owner shall abide with the rules and The owner must provide the necessary number
regulation indicated in the Fire Code of the of fire extinguisher needed per building floor.
Philippines.
XIII PLUMBING SYSTEM
Plumbing works shall be executed in accordance a. Septic Tank
with the latest edition of the National Plumbing CHB walls and reinforced concrete cover,
Code of the Philippines as well as Local see details on plan.
Regulations and Ordinances. All plumbing works
shall follow the details indicated on plans for
proper placements of plumbing materials.
XIV ELECTRICAL
Electrical works shall be executed in accordance See details on plan.
with the latest edition of the Philippine Electrical
Code as well as Local Regulations and
Ordinances. All electrical works shall follow the
details indicated on plans for proper execution and
placing of electrical fixtures.