Professional Documents
Culture Documents
○ ing
● Inform
○ Instruction
Briefing Materials
• Safety Precaution
• Preventive Architecture Monitoring
• Corrective Action
• Direct Request Handling
• Daily report & Updates
Participants
Supervisor : Uta Domas R.
Technician :
1. Abdul Wahab 3. Karnudin 5. Eben Ezer Hasibuan
2. Chaerul Anwar 4. Rinaldi Wiranata
Attendance :
Regular Hour Man Power
(08:00 ~ 17:00)
Position Total Present Permissi Sick Leave
on Leave Leave
Supervisor 1 1
Staff 5 4 1
1 Utility Center ARC Repair cracked wall in utility Gate 2,3,4 ARC Architecture Monitoring
substation Routine
2 Gate 1 ROOF Repair leakage from roof in Truck Scale ARC Architecture Monitoring
Logistic Gate 1 Houseguard Routine
3 Main Gate ARC Repair loose skirting in CCTV TDO ARC Architecture Monitoring
Room Main Gate Routine
4 Employee Gate 1 ROOF Repair leakage from roof in Gate 2,3,4 PL Plumbing Monitoring
employee gate 1 (8 points) Routine
10
Building Maintenance
Routine Monitoring:
“Architecture Monitoring”
Building Maintenance Preventive Activity
Architecture Monitoring
Shop Area : Gate 2,3,4, TDO, Truck Scale
Issue(s) Found :-
N Area
Code Description Before After Remarks
o Detail Location
Utility Center
Repair cracked wall in
1 FN-1278
utility substation
On Progress
Substation
N Area
Code Description Before After Remarks
o Detail Location
Employee
Gate 1 Repair leakage from
4 RO-0226 roof in employee gate Closed
1 (8 points)
Rooftop
6
Executed
1 Utility Center ARC Repair cracked wall in utility substation Done Repair
2 Gate 1 ROOF Repair leakage from roof in Logistic Gate 1 Houseguard Done Repair
3 Main Gate ARC Repair loose skirting in CCTV Room Main Gate Done Repair
4 Employee Gate 1 ROOF Repair leakage from roof in employee gate 1 (8 points) Done Repair
10