You are on page 1of 26

Calculation Sheet for

Strengthening Concrete Slab


with Steel Beam
1- steel properties and loads:
Steel used : st 37 with fy=2.4 t/cm 2
E =2100 t/cm2

layout as shown:

A B C D E F G H

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A B C D E F G H
➢ For operating:
Total load = Dead Load+ Live Load+ Covering + Wall ➢
➢ Statical System
B1 B1 B1 B1

S-B10
S-B7 S-B11
HEB 220 HEB 220
B2

B2
S-B9
HEB 220

S-B8
HEB 240

HEB 240
S-B6 S-B12
HEB 220 HEB 220

B1
S-B5 S-B13

B3
HEB 240 B3 HEB 220
B2

B2
B3

B3
B3

B1
S-B4 B1 B1
HEB 240
S-B14
HEB 220

B3 B1

S-B3
B3

HEB 240
B2

B2
HEB 240
S-B15

S-B2
HEB 240
B2

B2
S-B1
HEB 240

➢ For straining action:


modeling on SAP 2000 and SAFE 2016
as shown:
Bending Moment Due to Operating Load

Major Shear Due to Operating Load


DESIGN OF STEEL
BEAM
SEC. BEAM ID :- ( SB-1 )
Steel grade St.37
Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
1)- APPLIED FORCES :- Case Combination
M = 10.27 mt a
Q = 13.00 t

2)- CHOISE OF SECTION :-

The section is Rolled section HEB 240


bFL = 240.0 mm
tFL = 17.0 mm
h = 240.0 mm
tWEB = 10.0 mm

3)- BEAM DATA :-


Total length of Beam (L) = 9.16 m
Lu of compressin flange = 0.00 m

4)- CHECK SECTION :-


PROPERTIES OF SECTION :-

Y = 12.00 cm
A = 106.00 cm2
Ix = 11260.00 cm4
Sx = 938.00 cm3
rx = 10.30 cm
ry = 6.08 cm

CHECK COMPACTNESS :-
dw/tw = 16.400 Web is Compact
C/tf = 5.529 Flange is Compact
The sec is Compact

CHECK NORMAL STRESSES :-


Cb = 1.13
( 20.bf ) / (√ fy ) = 3.098 m
Lumax = 3.098 m
( 1380.Af ) / ( fy.d ) x Cb = 11.05 m
Lateral torsional buckling of comp.flange There is no LTB
Fltb = 1.536 t/cm2
Fbcx = 1.536 t/cm2
fbcx = 1.095 t/cm2 < 1.536 SAFE

CHECK SHEAR STRESSES :-


qw = 0.79 t/cm2 < 0.840 SAFE

CHECK DEFLICTION DUO TO LIVE LOAD :-


WL.L = 0.30 t/m
Beam type = simple
δL.L = 1.163 cm < 3.05 SAFE
.
DESIGN OF STEEL
CONNECTION
CONNECTION ID :- ( C-1 ) B2 : B14
HEB 240 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 1.00 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 10.00 mm
hw.sec = 240.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 240


Rb = 4.61 t
Rd.s = 5.02 t
Rmin = 4.61 t
N1 = 3
N2 = 6
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 9 M16 GRADE 5.6

CONNECTION ID :- ( C-2 ) B6 B8
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 4.00 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6


CONNECTION ID :- ( C-3 ) B7 B8
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 2.00 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6

CONNECTION ID :- ( C-4 ) B9 B8
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 2.00 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6


CONNECTION ID :- ( C-5 ) B9 B 10
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 2.00 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6

CONNECTION ID :- ( C-6 ) B 11 B 10
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 4.50 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6


CONNECTION ID :- ( C-7 ) B 12 B 10
HEB 220 HEB 240
1)- APPLIED FORCES : Steel grade St.37
Q = 4.50 t Fy = 2.40 t/cm2
Fu = 3.60 t/cm2
2)- O.B. USED ARE :
M 16 GRADE 5.6
Fyb = 3.00 t/cm2
Fub = 5.00 t/cm2
tw.sec = 9.50 mm
hw.sec = 220.00 mm HEB 240

3)- NO. OF BOLTS REQUIRED : HEB 220


Rb = 4.38 t
Rd.s = 5.02 t
Rmin = 4.38 t
N1 = 2
N2 = 4
emin = 30.00 mm
pmin = 60.00 mm
Min Angle = 60X6 mm
Lmin = 180.00 mm OK.
Take L = 180 mm

Use 6 M16 GRADE 5.6

THE END