EAST PANGI OIL TERMINAL

#PRIVATE&CONFIDENTIAL#
NAVOST – SUMMARY PROJECT /2/2022

SUMMARY PROJECT
1. INTRODUCTION
Pt. Navost Oil Tech is the private company was founded in the year 2010 February in Manado North Sulawesi province of Indonesia. The
company is the owner and founder of Mr. Voerman Po which have experience in petroleum in domestic and abroad and lives in Manado.
The proposal is to build a Total Liquid Terminal Seaport to store and dispense HSD to maritime and land based customers. Total capacity
is 100,000 Metric Ton. The works will include a marine jetty, HSD fixed tank capacity of 100,000 Mt, and with support structures and
equipment as required include all the full facilities of the tank farm. It is the intent of the project owner to enter into a contract for (DEPMC)
Design, Engineering & Project Management Consultant. Management for a state of the art facility. The total project cost budgeted is USD.
465.700.000.00 ( Four Hundred Sixty Five Million and Seven Hundred Thousand United State Dollars ) including site development, civil
and marine works, marine jetty, temporary floating dock, storage tanks, piping, marine and land delivery systems, maintenance and support
structures, all stand alone utilities, power plant, security and fire protection. The philosophy outlined in this is to help and ensure that the
Project will be successfully completed in a timely and efficient manner, and that the Project designed and project management will satisfy
the PT Navost Oil Tech in accordance with the project requirements.

2. PROJECT DESCRIPTION
The proposal is to build a Liquid Terminal Seaport to store and dispense HSD to maritime and land based customers. Phase One will
provide 100,000 Mt the works will include loading / unloading port, HSD fixed tank capacity of 100,000 Mt, with support structures and
equipment as required. It is the intent of the project owner to enter into a contract for turnkey Engineering, Procurement and Construction
Management (EPC) for a state of the art facility. The project are including supporting facility area , site development, road construction
works , Porta camp, warehouse, wooden housing, stockpile material, civil and marine works, batching plant, marine jetty / Loading-
unloading sea port, storage tanks, piping, marine and land delivery systems, maintenance and support structures, all stand alone utilities,
power plant, security and fire protection station. The whole It is planned to last about 36 months and 4 months of commissioning
engineering.

3. TARGET MARKET
With the construction of the oil terminal in this area it will be a lot of Industry will be growing in this area, especially the fisheries industry
and marine, Gold mining area , Nickel exploration and production area , the company will further optimize the target market as a priority
supply to the fisheries industry and marine in local of Indonesian waters
NAVOST – SUMMARY PROJECT /2/2022
EAST PANGI OIL TERMINAL

PRODUCT HSD (HIGH SPEED DIESEL)

STORAGE TANK CAP. 100.000 Mt

CUSTOMER FOREIGN & LOCAL BUYER


NAVOST – SUMMARY PROJECT /2/2022
NATIONAL SLEEPING ROOM EXPATRIAT SLEEPING ROOM
NAVOST – SUMMARY PROJECT /2/2022
TEAM OF PROJECT FINANCING ASSISTANCE AND ENGINEERING DESIGN PLAN
NAVOST – SUMMARY PROJECT /2/2022
PROJECT MANAGEMENT CONSULTANT CONSTRUCTION (PMCC)
NAVOST – SUMMARY PROJECT /2/2022
TEMPORARY FIELD SITE OFFICE OF JULY 2022 PART OF UTILITIES SUPPORTING FACILITY
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022

TEAM SURVEY ACCESS ROAD


NAVOST – SUMMARY PROJECT /2/2022

SOCIAL ASSISTANCE FOR THE COMMUNITY AROUND THE PROJECT SITE


NAVOST – SUMMARY PROJECT /2/2022
SOLAR CELL LIGHTING ASSISTANCE FOR THE COMMUNITY AROUND THE PROJECT LOCATION
NAVOST – SUMMARY PROJECT /2/2022
INSTALLATION OF ELECTRICAL SUBSTATIONS WITH A CAPICITY OF 41.5 K.va
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022
DEVELOPMENT ACCESS ROAD AND BASECAMP PARKING AREA
NAVOST – SUMMARY PROJECT /2/2022
NAVOST – SUMMARY PROJECT /2/2022

BASECAMP LOCATION THE FRONT OF SEA VIEW


NAVOST – SUMMARY PROJECT /2/2022

“EPC WORK FOR SUPPORTING FACILITY CONSTRUCTION”


SERVICE TYPE : ENGINEERING – PROCUREMENT CONSTRUCTION
PROJECT ITEM :
APPROVAL BUDGETING PREPARATION BY MANAGEMENT (5%) STEP USD. 23,285,000,00
1
PREPARING NEXT BUDGET OF USD. 465.700.000,00

(1). Concrete Batching Plant to serve Oil terminal


(2). Temporary Housing / Porta Camp
(3). Pembangunan Jalan Desa/ Village road development Works
(4). Pengadaan Kendaraan/Vehicle procurement
(5). Land Clearing preparation and for Oil Terminal Land clearing
(6). Marine Survey for loading/unloading seaport
(7). Solarcell PJD 1000 unit
(8). Solar home system 1 Mw

(9). Stockpile material


(10). Office 5 floor
(11). Warehouse

TOTAL USD
NAVOST – SUMMARY PROJECT /2/2022

OIL TERMINAL CONSTRUCTION WORKS (PROJECT LIST)


DESCRIPTION Qty (units) Job Title Remarks
Oil Storage tank 100,000 Mt accessories and other supporting facility 13 ea EPC Lump-sum turn-key Open Bid
Loading / unloading Port 218 Meter + 70 Meter + Marine Jetty 3 unit EPC Lump-sum turn-key Open Bid
Power Plant 5 Mw + Power house and Generation – Transmission - Distribution 5 unit EPC Lump-sum turn-key Open bid
Beach Reclamation 2500 meter more less & Break water 3 area Open Bid
Site office + Head Office 5 Floor 2 area Open Bid
Sport center 1 unit Direct order
Swimming pool 1 unit Open Bid
Clinic + Dental + ambulance 1 set Open Bid
Fire Station and it’s Accessories 1 set Open Bid
Mini Market 1 unit Direct order
Tower Control and Monitor room 1 unit Open Bid
Cold Storage for Mini market 1 unit Direct order
Fresh water tank 20,000 Kl 2 unit Open Bid
Laboratory and Equipment (Water & Fuel) 1 set Direct order
Warehouse and Maintenance shop 1 unit Direct order
Kitchen and Laundry area 2 unit Direct order
Restaurant and recreation area 1 unit Direct order
Mini Movie 1 unit Direct order
Security Post and Check point 3 unit Direct order
25 unit (To be
Permanent Expat and National Housing Open Bid
discuss)
Anchoring of side river 2000 meter and fencing 1 set Direct order
Bridge to protection sedimentation 100 meter 1 unit Open Bid
Daily fuel tank 500 Liter and accessories including M/E 2 unit Open Bid
NAVOST – SUMMARY PROJECT /2/2022
NOTE : Quality standard is requested by SNI

Checked By: Head Engineering/2020

DESCRIPTION Job Title Total unit Remarks


Land clearing , cut n fill and Batching plant works area of 4 hectare Civil works 1 set Direct order
Land clearing, cut n fill and Porta camp works area of 2 hectare Civil works 1 set Direct order
Porta Camp and it’s accessories Procurement 107 unit Direct order
Batching Plant and accessories Procurement 2 set / 90 cu / hour Direct order
Generator silent 500 Kva (Porta camp area) “CUMMINS “ / KRISBOW Procurement 1 unit Direct order
Generator 500 Kva (Batching plant area) “CUMMINS” / KRISBOW Procurement 2 unit Direct order
Radio SSB plus Tower and accessories Procurement 1 set Direct order
Cold storage 40’ Procurement 2 unit Direct order
Drill water supply to (Batching plant and Porta camp area) and accessories Civil works 2 unit Direct order
CCTV and it’s accessories (indoor and outdoor) Procurement 100 set Direct order
Paving block and others Procurement To be discuss Direct order
Access road to (Porta camp and Batching plant area) Civil works 2 Direct order
Power supply to Porta camp and Batching plant area (Installation) and Lighting Electrical works 2 set Direct order
Water tank @ 5000 – 10000 L Procurement 10 ea Direct order
Fire Trucks Procurement 2 unit
Ambulance Procurement 2 unit
Mobile operation Procurement 9 unit

NAVOST HEAD OFFICE 5 FL


NAVOST – SUMMARY PROJECT /2/2022
NOTE: WORK SCHEDULE ASAP

An important note for the reader Confidential information

This report has been prepared for the NAVOST OIL TECH
The views, opinions, findings, and conclusions or recommendations expressed in this report are strictly those of the author. The material included is the output of the author's research and should
not be considered in any way as policy adopted by the NAVOST OIL TECH, although it may be used in the formulation of future policy.
The NAVOST OIL TECH takes no responsibility for any errors or omissions in, or for the correctness of, the information contained in the report.
Confidential information
This report uses commercially sensitive information provided to the author in confidence. As a consequence Appendices C-F have been excluded from the report.

You might also like