NEGATIVE LIST OF WORK
ITEM PEKERJAAN STATUS
Pek. electrical & LED lamp 2BR Lt 2 On progress
Pek. Repair Plumbing Blok A & C Lt 2 On Progress
Pek. Finishing Cat Plafon & Dinding
On Progress
Blok C sd E

Pek. FD 2BR area storage blok A s.d E On Progress

Pek. Perakitan Tempat Tidur 2BR Blok


On Progress
C s.d E Lt 2
Pek. Pemasangan Wastafel kmr 2BR Lt
-
2 Blok A s.d E
Pek. Pembuatan saluran buang air area
On Progress
toilet & storage Blok C s.d E Lt 2
Pek. Pemasangan wall lamp led 24 volt
On Progress
blok A s.d E
Pek. Pemasangan sanitasi &
On progress
kelengkapan toilet
Pek. Pemasangan AC indoor & outdoor
On Progress
2BR Lt 2 blok B s.d E