Daily HSE Observation Report

Today’s Observation (Joint Visit of IOCL and Hill Representative with SPCPL HSE Coordinators at Site) Date: 20.10 2022
Sr Expected Date of
No. Observations to SPCPL Completion

1 Block C retaining wall area Barricade missing, Scrape Block C Informed to SPCPL contactor to take initiative 20.10.2022
wood need to remove
2 Block C : Staircase access to be rectified Block C Informed to SPCPL contactor to take initiative 20.10.2022
3 Block C , Waterproofing work area, compressor without Block C Informed to SPCPL contactor to take initiative 20.10.2022
inspection, hose pipe damage, and cable poor condition
4 Block C : Hand teel without inspection Block C Informed to SPCPL contactor to take initiative 20.10.2022
5 Block D : stagnant water near the DB Block C Informed to SPCPL contactor to take initiative 20.10.2022
Previous Observation status

1 Block A : Access 2nd slab area obstructing with pipe and Block A : Informed to Site Charge to take corrective Closed
ladder action
2 Block A : Dismantling area: No sign board visible Informed to display DO NOT ENTER sign board Closed
3 Block A : Loose fitting of Net 2nd-floor area Informed to SPCPL safety to make proper Closed
4 Block A2 : saw cutting machine operating without eye The worker is inducted to wear safety goggles at the Closed
protection time of cutting
5 Block A Building front side edge corner without hard Informed Safety SPCPL to arrange a hard barricade
barricade