OML-13 MAIN FLOW STATION - ADMINISTRATION BUILDING - ARCHITECTURAL LAYOUT

Document Number :
COMMENTS RESOLUTION SHEET (CRS) DISCIPLINE CIVIL
SEPA15015-MFSFF-CV-21-DWG-201

CRS for Document Number : Document Name :


Doc. No. CRS RESOLUTION STATUS
SEPA15015-MFSFF-CV-21-DWG-201 ADMINISTRATION BUILDING - ARCHITECTURAL LAYOUT

Sr. Rev. Comments Clarification Satus


ALACRITY's Comments PetroExcel response ALACRITY's Further Comments Close Date
No No. Date Date Open/Cose

1 A Provide the dimension marked 6/3/2022 Comments Incorporated 6/24/2022

2 A No Overhead water tank required 6/3/2022 Comments Incorporated 6/24/2022

Opening in First Floor at the


entrance has been provided
3 A No Void ( opening) 6/3/2022 6/24/2022
following comments received in
Management meeting.

Vastu Checklist was attached with


4 A Vastu shall be follow 6/3/2022 6/24/2022
Rev-A submmission.

The height of the building has


been optimized by removing the
space reserved for Air Condition
5 A Maximum height shall be 10m 6/3/2022 6/24/2022
duct.
The optimized achieved height is
10.65 M.

Page 1 of 2
Lift has been removed as per
6 A No Lift 6/3/2022 6/24/2022
comment.

Rooms name & location in


partitions may vary or
7 A 6/3/2022 Comments incorporated 6/24/2022
interchanged internally in
future....

NOTES:
A Per deliverable one (1), single CRS sheet to be maintained, and same CRS sheet to be used till Final/IFD/IFC stage of that document
B CRS sheet should have number associated with deiverable number
C Each time resubmission, CRS sheet to be attached along with document in MS Excel sheet