STANDARD DETAIL OF HANDRAIL - UTAPATE TERMINAL (MFS TANK FARM)

Document Number:
COMMENTS RESOLUTION SHEET (CRS) DISCIPLINE: CIVIL
SEPA15014-MFSTF-CV-00-SPC-002

Doc.
CRS for Document Number_SEPA15014-MFSTF-CV-00-SPC-002_Rev A Document Name: Specification For Concrete Works CRS RESOLUTION STATUS
No.

Clarification Satus
Point # Revision No. ALACRITY's Comments Comments Date PetroExcel response ALACRITY's Further Comments Close Date
Date Open/Cose

Grade of concrete mix design is M30 mentioned in this


1 A 25.10.2021 Incorporated 26.11.2021
document, whereas Alacrity using M20

Since water table is very near to FGL, water may


Bituminous coating for the foundation below ground & penetrate and corroDe the reinforcement. Hence all
2 A above ground showed here but Alacrity not provided so 25.10.2021 underground concrete structure is required to be 26.11.2021
far in our previous/other projects protected from ground water by using bituminous
coating.

Epoxy coated rebar is mentioned on this document but Epoxy Coated rebaris not used in this project,
3 A 25.10.2021 26.11.2021
Alacrity not provided this in previous projects document is revised accordingly.

4 A whether its applicable in Nigeria 25.10.2021 Deleted 26.11.2021

5 A with prior of company 25.10.2021 Noted & updated 26.11.2021

this is for beam and for slab already mentioned in


6 A confirm beam or slab 25.10.2021 26.11.2021
below table

7 A Epoxy coating bar required here 25.10.2021 Epoxy coating bar not required for this project 26.11.2021

8 A mentioned the min. & max. spacing requirment 25.10.2021 It will be as per deatil drawing. 26.11.2021

9 A mentioned the min. & max. spacing requirment 25.10.2021 It will be as per deatil drawing. 26.11.2021

Since water table is very near to FGL, water may


coating required for saline soil or soil type Kindly penetrate and corrode the reinforcement. Hence all
10 A 25.10.2021 26.11.2021
mentioned the basis. underground concrete structure is required to be
protected from ground water as well as sailine water.

NOTE:

Per deliverable one (1), single CRS sheet to be maintained, and same CRS sheet to be used till
A
Final/IFD/IFC stage of that document

B CRS sheet should have number associated with deiverable number

C Each time resubmission, CRS sheet to be attached along with document in MS Excel sheet