Culture Documents
2 For better clarity it is better as given in the Not incorporated Not incorporated.
to add site plan in the DBR architectural
and mark all buildings in the drawings For better clarity it is
scope of work in the site plan better to add site plan
in the DBR and mark Not incorporated. Please add site
all buildings in the plan in DBR and mark all buildings
scope of work in the
site plan
4 Clause 4.3 - Since DBR is basis for Based on final Not incorporated Clause 8.1 Concrete:
Concrete design, BOQ and estimate, it design
grade is preferable to mention 1. Please include the
different grades of concrete grade of concrete for
considered for all buildings all other structures
including water retaining including water
structures in the DBR instead retaining structures
of mentionng appropriate other than dormitory.
grades.
3. Please clarify what
is 20 - OPC/OPC
mentioned in table
5 Please provide basis of Necessary cover Not clarified Not clarified Not clarified
considering mild exposure for concrete taken
condition for structural care for all
elements above ground level strcutures
6 Please mention the thickness Based on final Not incorporated Incorporated Closed
and grade of PCC below design
foundations
7 Clause 4.5- Please mention buildings All residential Not incorporated Incorporated Closed
Structural which are with precast buildings will be
system - concrete and buildings with done with precast.
Precast conventional concrete. Other commercial
elements buildings and
external strcuture
to be done with
conventional
technology
Clause 4.5- Mention design philosophy The scope of Not incorporated Not incorporated Not incorporated
Structural followed for precast buildings design, fabrication,
system - erection will be
Precast with the precast
elements vendor. The design
philosophy will
cover the relevant
codes for
earthquake, wind
loads and loading
of the buildings as
per usage
PROJECT RESIDENTIAL DEVELOPMENT AT HOSUR
CLIENT VIDIYAL RESIDENCY PRIVATE LIMTED
PMC TATA CONSULTING ENGINEERS LIMITED ARCHITECT BHASKAR ARCHITECTS
R0-Structure DBR (Submitted by BA on 18-11-2021),
Document Title R1-DBR submitted on 27-11-2021, Resubmitted R1 DBR submitted on 02-12-2021
R2-DBR submitted on 18-03-2022
8 Clause 4.6- Indicate the values of Based on final Not incorporated Incorporated Closed
Stiffness stiffness modifiers considered design and inputs
modifiers for beams, columns and RC from the precast
wall in the DBR vendor
9 Please correct the IS 1893 Not incorporated This clause is removed Closed
clause number as 6.4.3.1 from revised DBR.
instead of 6.3.4.1 Hence not applicable
10 Clause 4.7 - List down all the AS per IS and the Not incorporated 1. Combinations are
Load combinations considered for soil test report not updated as per IS
combinations following. recommendations 875 Part 5, Clause 8.1,
a) For foundation design and Note 3
deflection check (limit state
of serviceability 2. Please clarify the
b) For concrete design load combinations
c) For steel design from S. NO. 21 to 34
and 49 to 53
Load factors in the
combinations shall be 3. Please check and
mentioned clearly by clarify the following
considering IS 875 Part 5, sentence in clause 2.4
Clause 8.1, Note 3. As per Load combinations. Incorporated. Closed
clasue whenever imposed 'Building is situated in
load is combined with zone IV so earthquake
earthquake load, the in vertical direction
appropriate part of imposed shall be considered'.
load shall be considered for
the combined load effects in
combinations.
11 Clause 4.8 - It is mentioned in the DBR Precast structures Not incorporated This clause is removed
Loads - that choice of AAC block or may not need from revised DBR.
a) Dead load brick masonry to be finalised. internal walls, Hence not applicable
This needs to be concluded however,
and actual requirement to be conventioneal
mentioned in DBR. buildings will be
done with the need Closed
of the end user as
described in the
architectural DBR
17 Mention the capacity and As per Not incorporated Not incorporated Incorporated. Closed
load to be considered for archietctural
water tank in DBR detailed design
18 Clause 4.8 - As per IS: 875 (Part 2) – for residential Not incorporated Incorporated Closed
Loads - 1987, imposed load on purposes 3 KN/m2
b) Imposed balconies shall be 4 kN/m2 may be good
load instead of 3 kN/m2 . Please enough
update in DBR
PROJECT RESIDENTIAL DEVELOPMENT AT HOSUR
CLIENT VIDIYAL RESIDENCY PRIVATE LIMTED
PMC TATA CONSULTING ENGINEERS LIMITED ARCHITECT BHASKAR ARCHITECTS
R0-Structure DBR (Submitted by BA on 18-11-2021),
Document Title R1-DBR submitted on 27-11-2021, Resubmitted R1 DBR submitted on 02-12-2021
R2-DBR submitted on 18-03-2022
Clause 4.8 -
Loads -
b) Imposed BA Compliance / TCE Response/ BA Compliance /
TCE Response on BA Compliance / Clarification
Sl. load TCE observations Clarification Comments on R1 Clarification
Description R1 DBR submitted TCE Response/ Comments on dated
No. dated 19-11-2021 dated DBR submitted on dated
on 28-11-2021
27-11-2021 02-12-2021
19 Mention the imposed loads of as per IS Not incorporated 1. As per IS: 875 (Part 1. Incorporated. Closed
following rooms. 2) – 1987, imposed
a) Dining room load on dining room 2. Incorporated. Closed
b) Store room and cafeteria shall be 4
c) Electrical room, UPS kN/m2 instead of 3 Two different loads are mentioned
room, battery room, panel kN/m2.Please check for pharmacy. Please check and
room and revise correct.
d) Service room
e) Refuge area 2. Please include
f) Laundry imposed load for
g)Common room service room, refuge
h) Lift machine room area, common room,
lift machine room
20 Mention the imposed loads of as per IS Not incorporated Not incorporated. Incorporated. Closed
following buildings
a) Commercial Complex Please include
b) Maintenance Office imposed load for all
c) Recreation Complex other buildings other
d) Medical Centre dormitory in DBR
e) Pump Room
f) Fire station
24 Surcharge Mention about surcharge based on soil test Not incorporated Not incorporated. Incorporated. Closed
load, earth load, earth pressure, water recommendations Please mention about
pressure and pressure etc. to be considered surcharge load, earth
hydrostatic for design of underground pressure, water
pressure structures in DBR. pressure etc. to be
considered for design
of underground
structures in DBR.
25 Expansion Mention about provision of as required by the Not incorporated Clause 11:
joint expansion joint precast vendor Temperature and
shrinkage effect
27 Soil Indicate the soil condition, based on soil test Not incorporated Clause 7-Foundation Incorporated. Closed
condition, ground water table, bearing recommendations Indicate the soil
ground water capacity at various founding condition, ground
table and level etc. in DBR. water table, bearing
bearing If soil investigation report is capacity at various
capacity not available, mention the founding level etc. in
assumed values in DBR and DBR.
indicate that final values will If soil investigation
as per soil investigation report is not available,
report mention the assumed
values in DBR and
indicate that final
values will as per soil
investigation report
28 Clear cover Mention the clear cover of precast Not incorporated Incorporated Incorporated. Closed
structural elements such as
foundation, columns, walls,
beams, slabs et. in DBR
29 Structural Mention the properties of as per the design of Not incorporated Not incorporated
steel structural steel works such as the PEB vendor
properties grade of steel, grade of bolts, Please mention the 1. Wind speed is not matching with
connections, weld details, properties of structural clause 2.2. Please check.
painting, grout etc, in DBR steel in DBR Wind speed and other wind
conditions shall be as clause 2.2 in
DBR.
30 Content page Beam column junction is precast vednor Not incorporated Removed from
-Sl No 6 mentioned in content page, design revised. Hence not
Sl. No. 6. But this is not applicable
Closed
covered in the DBR. Please
check.