You are on page 1of 6

-CHEC CONSTRUCTION (PHILS.) CORP.

PROJECT NO: PHCVE-M&I-2018-037 Method


PROJECT NAME: Cavite Barge Terminal Project Statement
Cavite Barge Terminal Project
CBTP-CHEC-MS-040 Rev. A
20 Sep. 2021

Document Title
Method Statement of Duct Bank Repair in
Manhole

Document No.
CBTP-CHEC-MS-040 Rev. A

2
Cavite Barge Terminal Project
CBTP-CHEC-MS-040 Rev. A
20 Sep. 2021

Issue for Engineer’s


20 Sep.
A Review and A. Dela Rea Liu Gongxin Wu Kairui
2021
Comment
Prepared Approved
Rev Date Description Check by
by by
Revision History
Rev Date Change Description
A 20 Sep. 2021 Issue for Engineer’s Review and Comment

3
Cavite Barge Terminal Project
CBTP-CHEC-MS-040 Rev. A
20 Sep. 2021

Table of Contents

1. Purpose of Method Statement..............................................................4

2. Scope...................................................................................................4

3. Manpower.............................................................................................4

4. Equipment, Tools and Materials............................................................4

5. Detail Procedure................................................................................4-5

6. Attachment...........................................................................................5

4
Cavite Barge Terminal Project
CBTP-CHEC-MS-040 Rev. A
20 Sep. 2021

1. Purpose of Method Statement

Purpose of this statement is to describe the process of replacing the conduit pipe

of the duct bank in the manhole.

2. Scope

This method statement covers to change the arrangement of the pipe in the

duct bank and manhole.

3. Manpower

 Project Chief Engineer

 Electrical Engineer

 Electricians

 Helper

 QA/QC Inspector

 Safety Officer

4. Tools and Materials

CHEC shall provide the necessary tools and materials needed for this work.
- Tape measure
- Marker or pencil
- Chipping gun

5. Details Procedure

a. Ensure the right configuration of the pipe as recommended.


b. Remove the existing pipe that need to replace.

5
Cavite Barge Terminal Project
CBTP-CHEC-MS-040 Rev. A
20 Sep. 2021

c. Put a mark at each new location of the pipe in a manhole.


d. Chip the concrete manhole according to the new location of the pipe
until to reach the diameter that is needed for enter each of the pipes.

Figure 1 chipping works


e. Place the pipe in manhole to complete the new arrangement of the
duct bank before repairing the concrete.
f. Keep the pipe together with the manhole for preparation of concrete
repair.
g. For concrete repair refer to the Method Statement of Concrete
Repairs Revision A.

6. Attachment

 20S031-DD-EL-DRW-5006-C06 CABLE DRAWPIT DETAILS

 20S031-DD-EL-DRW-5003-C06 ELECTRICAL LAYOUT OF LAND AREA

 20S031-DD-EL-DRW-5004-C06 CABLE DUCT SECTIONS AND DETAILS

(SHEET 1 OF 2)

 20S031-DD-EL-DRW-5005-C06 CABLE DUCT SECTIONS AND DETAILS

(SHEET 2 OF 2)