Professional Documents
Culture Documents
Package BH-06
Construction:
Construction:
b. Shall install the earth mat
b. Shall associate during the according to approved design.
installation of earth mat.
Shall jointly check the
resistance of the earth
mat after installation.
10. SCADA System a. Shall coordinate for a. Shall provide space for
suitable space in SCADA server, SCADA
OCC/BCC. supervisor and maintenance
room.