Professional Documents
Culture Documents
Package BH-06
Attachment – 8 to Corrigendum – 2
Volume III, 12.9.8, “Interface between Depot Civil Contractor and Power Supply
Contractor”
Interface between Depot Civil Contractor and Power Supply Contractor