C. PARKING SHED
DISCIPLINE
ENGINEER
ALL DISCIPLINE 1. CONTRACTOR shall excavate to required depth to construct
DATE:
05/03/18
foundations and shall compact the grade as shown on the
PROJECT
ENGINEER project drawings.
MOHAMED BEKHIET
DATE:
06/03/18 2. CONTRACTOR shall provide lean concrete under foundations.
CERTIFIED
Rabee E. Zakaria
06/03/18
3. CONTRACTOR shall construct foundations and pedestal as
DATE: shown on project drawing.
CONSTRUCTION
AGENCY
ABDULRAOUF
A.GHAZWI 4. CONTRACTOR shall provide protective coating APCS-10 on
DATE:
06/03/18
concrete surfaces below grade.
OPERATIONS
SULIMAN M.
KHAYYAT 5. CONTRACTOR shall supply and install parking shed through an
06/03/18
DATE: approved vendor and shall construct parking shed as per
detailed provided by vendor. CONTRACTOR to coordinate with
approved final parking shed vendor drawings for anchor bolt
locations and details and keep the embedded items in place
before casting of concrete.
CONSTRUCTION SCOPE OF WORK- PRIVATE SCHOOLS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
D. LIGHTING POLES
DISCIPLINE
ENGINEER
6. CONTRACTOR to prepare shop drawing showing anchor bolt
ALL DISCIPLINE locations & details based on vendor drawings and shall be
DATE:
05/03/18
approved by COMPANY prior to construction.
PROJECT
ENGINEER
MOHAMED BEKHIET 7. CONTRACTOR shall verify lighting pole foundation design as
DATE:
06/03/18 per support reaction furnished by vendor & shall be approved by
CERTIFIED COMPANY prior to construction.
Rabee E. Zakaria
06/03/18
DATE:
CONSTRUCTION
AGENCY E. FENCE FOR SOCCER FIELD
ABDULRAOUF
A.GHAZWI
06/03/18
DATE:
OPERATIONS
SULIMAN M.
1. CONTRACTOR shall excavate to required depth to construct
KHAYYAT foundations and shall compact the grade as shown on the
06/03/18
DATE: project drawings.
CONSTRUCTION SCOPE OF WORK- PRIVATE SCHOOLS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.