Daily HSE Observation Report

Today’s Observation (Joint Visit of IOCL and Hill Representative with SPCPL HSE Coordinators at Site) Date: 09.11 2022
Sr Expected Date of
No. Observations to SPCPL Completion

1 Block G : Poor housekeeping in a few places Informed to engineer to provide a lifeline. 09.11.2022
2 Block G : Working on Red Tag, workers are stopped and Instructed to Scaffolder to re-check and put a green 09.11.2022
informed to Scaffolder tag. Workers are also instructed about risk
3 Block B : Water stagnant near the drinking water station Inform them to Clear the water 09.11.2022
4 Block B : Bar bending area access is restricted for man Instructed to clear the access 09.11.2022
movement
5 Block G : Materials stacking is proper Info 09.11.2022
Previous Observation status

1 Block A: Lifeline is missing around cutouts. Instruct to Safety to rectify it. Closed
2 Block B: Poor housekeeping observed. Instruct to scaffolding inspector to rectify this. Closed
3 Block E: Lifeline is missing near the edge. Informed to Security Closed
4 Block C: Poor housekeeping at the slab. Work suspended and removed the worker till Closed
rectification
5 Block A: Builder hoist TPI has been done. Instruct to Safety to close the access till rectification Closed