Today’s Observation (Joint Visit of IOCL and Hill Representative with SPCPL HSE Coordinators at Site) Date: 26.10 2022
Sr Expected Date of
No. Observations to SPCPL Completion

1 Block D : Lifeline is loose fitting, Lifeline is tightened 26.10 2022


2 Block B : Materials on edge corner SPCPL safety will take initiative 26.10 2022
3 Block C : Challis need to place in PT slab area, Lifeline must informed to site Charge 26.10 2022
be tightened and Signboard
4 Scaffolding Checklist fill-up by scaffolding inspector Info 26.10 2022
5 Housekeeping for Block B Informed SPCPL Safety to take initiative 26.10 2022
Previous Observation status

1 Block A2 : Housekeeping for scaffolding materials pending SPCPL has taken corrective action Closed
2 Block B : Outer edge challis arrangement to be rectified SPCPL has taken corrective action Closed
3 Block B : Staircase access shall be inspected, and tagged SPCPL has taken corrective action Closed
with proper arrangement of green mesh
4 Block A2 : Wet cable near the water tank SPCPL has taken corrective action Closed
5 Block B : Hard /soft barricade required Ist casting area to SPCPL has taken corrective action Closed