You are on page 1of 7

DATE : November 5, 2022

ATTENTION : Engr. Eden Angelo


MDBI Façade Field Engr.

THRU : Ms. Roselee Payas


MDBI Façade QA/QC

SUBJECT : Observed Leakages due to Typhoon Paeng at BPO Tower 1

Good day Ma’am / Sir,


We would like to inform you regarding all the leakages observed at BPO Tower 1 Level 11, 18, 19, and
20 due to Typhoon Paeng details as follows:

1. AYALA (GL S/4-2), Leakage observed at Level 11 coming from an open window at Level 12
Panel 68 of BPO Tower 1 that passes through the groove of the sill cover.
2. EAST STREET (GL Q-O/2), Leakage observed coming from miter at Level 18 Panel 100, and
Level 19 Panel 93 and 100 of BPO Tower 1.
3. COURTYARD (GL N/3-2), Leakage observed coming from the bulb gasket between window
sash frame due to misalignment at Level 20 Panel 116 of BPO Tower 1.
4. COURTYARD (GL N/3-2), Leakage observed coming from the miter and gasket between
glass and aluminum at Level 20 Panel 118 of BPO Tower 1.

Based on the inspection conducted the source of leakages was due to poor workmanship. The leak’s
rectification was completed on November 4, 2022. Please see attached plans and photos for your
reference. Thank you.

Yours truly,
ALUACE CORPORATION

Mark Anthony Taton


QA/QC

Michelle Marcelo
Project-in-Charge

Danilo Barrera Jr.


Operation Manager

Cc:
Project File
Jenny Rubio
LEAK OBSERVED
LEAK OBSERVED

LEAK OBSERVED
LEAK OBSERVED

LEAK OBSERVED
ACTUAL PHOTOS

Figure 1. Level 12 Panel 68 source of leak at level 11 Figure 2. Level 12 Panel 68 leak entry point

Figure 3. Level 12 Panel 68 Rectification Figure 4. Level 12 Panel 68 Rectification

Figure 5. Level 12 Panel 68 Rectification Figure 6. Level 12 Panel 68 Done Rectification


ACTUAL PHOTOS

Figure 7. Level 18 Panel 100 Leak observed at miter Figure 8. Level 18 Panel 100 Leak observed at miter

Figure 9. Level 18 Panel 100 Done Rectification Figure 10. Level 18 Panel 100 Done Rectification

Figure 11. Level 19 Panel 93 Done Rectification Figure 12. Level 19 Panel 100 Done Rectification
ACTUAL PHOTOS

Figure 13. Level 20 Panel 116 Done Alignment Figure 14. Level 20 Panel 118 Leak observed at miter and
gasket between glass and aluminum

Figure 15. Level 20 Panel 118 Leak rectification Figure 16. Level 20 Panel 118 Leak rectification

Figure 17. Level 20 Panel 118 Leak rectification Figure 18. Level 20 Panel 118 done rectification