1. AYALA (GL S/4-2), Leakage observed at Level 11 coming from an open window at Level 12
Panel 68 of BPO Tower 1 that passes through the groove of the sill cover.
2. EAST STREET (GL Q-O/2), Leakage observed coming from miter at Level 18 Panel 100, and
Level 19 Panel 93 and 100 of BPO Tower 1.
3. COURTYARD (GL N/3-2), Leakage observed coming from the bulb gasket between window
sash frame due to misalignment at Level 20 Panel 116 of BPO Tower 1.
4. COURTYARD (GL N/3-2), Leakage observed coming from the miter and gasket between
glass and aluminum at Level 20 Panel 118 of BPO Tower 1.
Based on the inspection conducted the source of leakages was due to poor workmanship. The leak’s
rectification was completed on November 4, 2022. Please see attached plans and photos for your
reference. Thank you.
Yours truly,
ALUACE CORPORATION
Michelle Marcelo
Project-in-Charge
Cc:
Project File
Jenny Rubio
LEAK OBSERVED
LEAK OBSERVED
LEAK OBSERVED
LEAK OBSERVED
LEAK OBSERVED
ACTUAL PHOTOS
Figure 1. Level 12 Panel 68 source of leak at level 11 Figure 2. Level 12 Panel 68 leak entry point
Figure 7. Level 18 Panel 100 Leak observed at miter Figure 8. Level 18 Panel 100 Leak observed at miter
Figure 9. Level 18 Panel 100 Done Rectification Figure 10. Level 18 Panel 100 Done Rectification
Figure 11. Level 19 Panel 93 Done Rectification Figure 12. Level 19 Panel 100 Done Rectification
ACTUAL PHOTOS
Figure 13. Level 20 Panel 116 Done Alignment Figure 14. Level 20 Panel 118 Leak observed at miter and
gasket between glass and aluminum
Figure 15. Level 20 Panel 118 Leak rectification Figure 16. Level 20 Panel 118 Leak rectification
Figure 17. Level 20 Panel 118 Leak rectification Figure 18. Level 20 Panel 118 done rectification