The rectification works are still not completed for the wall paint
Undulation issues for the gypsum celing
3 The installation works for the sockets and switches are not completed
4 Loose bathroom accessories
Cleaning the floors and the walls
SuJ d d Commn
|inspection No.:
EAS Rep
Contractor's QA/QC
Roald
po ECETVEN
21 N 2022
Eng Adnan Saffarini
20-11-22
Page 1 of 1