Eng.

Adnan Salfrini PROPOSED LUXURY HOTEL (OASIS) - 3B+G+1+M+6+P

REQUEST FOR SNAGGING

Contract No. REF. No. CR18G-RFS -069


Date: Nov 2022
From China Railway 18th Bureau
To Engr. Adnan Saffarini -Consultant
Zone |Level Room No. Room Title Relevent:
Standard Room RFS No. CR18G-RFS-069 Rev.: 1
4 A02

Date of Inspection No. 2 Inspector Name Disciplinee Date ofRFS


2 Nov 2022 Engr. Saif Wasef Architectural

EAS Representative: CR18G QA/QC: Roald


Re-Inspection Record
Accepted ( ) Rejected (x)
Item Inspection Comments
2) (3) (4)

The rectification works are still not completed for the wall paint
2 Undulation issuesfor the gypsum ceiling
Theinstallation worksfor the sockets and switches are not completed
Loose bathroom accessories
Cleaning the floors and the walls
Silicon works for the sanitary wares are notcompleted
Poor installation and finishing for the wooden cornice
Poor installation and finishing for the wooden skirting
9 The grout works must be clean for the toilet marble
10 The grout works must be clean for the balcony skirting i l y
|Undulating and joint issues for the carpet
2 The joinery works are not installed

3 Mattress and divan are still not delivered


for the bathroom marble
14 Non-slip coating to be applied
|Minibars are still not delivered
15
16 TV still not delivered
17 GRMS glass panels still not installed

18 Thefinishing works for the doors are still not completed


19 The installation works for the ironmongery are still not completed

S Sec lah.d.d Cormenb

Inspection No.:

CR18G Construction Manager


EAS Rep
Roald
Contractor's QA/QC
ECEIVEN
21 OV 2
Eng Adnan Saffarini
Page 1 of 1