Navana Real Estate Ltd.
INTERNAT COMMUMCATION SHEET (ICS)
TO: All Team Leaderc / ST.AGM / Sr.PMs / PMs & FROM: BRIG GEN MD SYEED ANWARUL ISLAM (R[TD)
All Project-ln -Charge Chief Engineer (Engineering)
Navana Real Estate Ltd. Navana Real Estate Ltd.
Ref: Engr./lCS / 06/ 2022
SUBJECT: REVISED SCHEDUTE OF RATES OF flLES / MARBLE / GMNITE WORKS FOR ALL PROJECTS.
MESSAGE:
AllProject-i n-charges are hereby instructed to prepare bill of Tiles Marble / / Granite Works ut p", revised
Schedule of Rates (effective from I"t December' 2O22'l enclosed with this circular.
01. Approved Schedule of Rates will be applicable for all ongoing & upcoming projects with the condition
mentioned bellow.
02. If work order afueady issued for any project as per Schedule of Rates-2017 and work yet to be started, in this
regards contractor may be allowed to claim bill as per the new Schedule of Rates-}OZZ after receiving the new
Schedule of Rates-2022 from Engineering Coordination.
03. For work done upto 30. 1 1, .2022 old rate will be applicable mentioned in the Schedule of Rates-2077 .
04. For Tiles / Marble / Granite fitting-fixing work abeady done within 30JJ.2022,bat pointing works still
pending, in such cases the new Schedule of Rates-2022 will not be applicable.
05. Those are avarling Special Rate / Non-Schedule Rate other than the Schedule of Rates-2017 for selected works
are not eligible for the new Schedule of Rates (2022).
06. All bills need'to be submitted to Bill section within 05,12.2022 for calculating all work upto 30.1 1.2022 with
the basis of old rate as mentioned in Sl # 03 clause.
NQIE;
Photocopy of MB up to 30.1 LZO22 will be kept in Bill section under Accounts Department / Audit department and
one copy will be sent to P&C for necessary checking. No deviation or mismatch is expected.
All are requested to strictly follow this instruction and brief all concern accordingly.
KindapprovalPlz.
Thanking You,
*nnur .-
/ oo
ta,,Lo,
BRIG GEN MD SYEED ANWARUL ISLAM (REID)
Chief Engineer (Engineering)
Navana Reai Estate Ltd. , ..
F:\Engineering ICS\ICS file stal from 1008.17\ENG6 /CS stat hon 10.08J7.dw<>
page I of I
NAVANA Rf,At ESTATI LIMITED
H"""n# 9/CR""d#71, Gu1"L".-2, D1"1"6-1212
iii. Wall tiles havinq size: 12"x36'\or above (say 13"x36", etc.)
(a) I'rom Basement-7&2 to 6th floor sft 22.50
(b) i'rom 7th floor to 9th floor & Basement-3 sfr 23.06
sft 23.63
c) From 1 Oth floor to 1 2th floor & Basement -4
(d) From 1 3th floor to 1 Sth floor sfr 24.79
(e) From 1 6th floor to above floor sft 24:75
re of Contractor
ffi- HdM.frf;t
Plepared By Ckd & Reconr By ,AGM/Sr.
lZlrrtuz-
By
I
2of9
SL Rate
Description Unit
No Cft.)
6.0 v,Witttiteshavinqsize:above'12"x36"&13"x30"(a1s013"x39",12"x48",13"x48",12"x56",8"148",6"x48",etcsizestiles)
Cont. (a) From Basement-l&Z to 6th floor Sft 25.OO
(b) From 7th floor to 9th floor & Basement-3 sft 25.63
(c) From 10th floor to l?thfloor & Basement -4 sft 26.25
(d) from 1 Sth floor to 1 Sth floor sft 26.88
(e) From 16th floor to above floor sfr 27.50
7.0 Fiftinslixinq of qlazed / non-glazed tiles at floor
i. Floor tiles havino size: uDto 12"x12"
(a) From Basement-7&Z to 6th floor sft 17.OO
&) From 7th floor to 9th floor & Basement-3 sft 77.43
(c) From 10th floor to 1Zth floor & Basement -4 sfr 77.85
(d) From 1 Sth floor to 1 5th floor sft ta.2a
(e) From 1 6th floor to above floor sft 78.70
i, Floor tilis havinq size: above 12"x12" to '13"125" (say 16"x16", 6"x24",12"124",20"x20",24"x2!1, etc.)
(a) From Basement-l&Z to 6th floor sft 20.o0
lb) From 7th floor to 9th floor & Basement-3 sfr 20.50
(c) From 1Oth floor to 12th floor & Basement -4 sft 27.OO
At From l3ttr flooi to 15th floor sft 27-50
(e) From 16th floor to above floor sfr 22.OO
iii. Floortiles havinE size: above 24"x24" to 36"x36" (say 6"x32", 8"132", 6"x36",24"x36", 32"x32", etcJ
(a) From Basement-l&Z to 6th floor sft 24-OO
&) From 7th floor to 9th floor & Basement-3 sfr 24.60
(c) From 1 Oth floor to 1 2th floor & Basement -4 sfr 25.20
(d) From 1 3th floor to i 5th floor sfr 25-aO
(e) From 16th floor to above floor' Sfl 26.40
iv. Floor tiles havinq size: above 36"x36" (say 24"148", 10"x52", 24"x60", 12"x48", 18"x48", 42"x42" 48"x48", 6"x48", 8l4q r!!gJ
'
(a) from Basement-l&Z to 6th floor sfr 25.OO
&) From 7th floor to 9th floor & Basement-3 sft 25.63
(c) From 10th floor to 1Zth floor & Basement -4 sfr 26.25
(d) From 1 3th floor to 1 5th floor sft 26.88
(e) From 1 6th floor to above floor sft 27.30
8.0 cifting-fixing of any size of glazed / non-glazed / rustic files at stair tread, iser, mid-landing, in/c. groove cufting to inseft of vertical
&) From 7th floor to 9th floor & Basement-3 sft 21.53
(c) From 1Oth floor to l2thfloor &Basement -4 Sft 22.O5
(d) from 13th floor to 15th floor sft 22.58
(e) From 16th floor to above floor sft 23.70
9.0 G/ass lr,/es fixino etc, all complete work.
, Fittinq-firinq & pointins of qlass / mosaic tiles at swimming pool, water body or any other places
(a) From Basement-1&2 to 6th floor sfr 50.oo
(b) From 7th floor to 9th floor & Basement-3 sft 51.25
lc) from 10th floor to 12th floor & Basement -4 Sft 52.50
(d) From I 3th floor to 1 sth floor sft 53.75
(e) From 16th floor to above floor Sft 55.00
i. Fittinq-fixinq & pointinq of desiqn glass tiles at swimming pool, water body or any other places
(a) From Basemenl-l&Z to 6th floor sft 55.00
(b) From 7th floor to 9th floor & Basement-3 sft 56.38
(c) From l Oth flnor lo 1?,lh floo't'& Basement -4 sft 57.75
.l
t'rl) From l3th flnnr to Sth floor Sft 59.I3
(e) From 16th t'loor to above floor sfr 60.50
10.0 ci11;nq-fxing of Dolished marble / gran'tte stone on inside any wallincluding removing of net etc. allcomplete work.
(a) From Basement-l&2 to 6th-floor Sft 45.00
fu) From TmToor !o gih floor &-Basement-3 sft 46.73
(c) From 1 Oth floor to 1 2th floor & Basement -4 sft 47.25
,-l) Frnm l lfh floor tn 1Sfh floor sft 4a38
(e) From 16th floor to above floor sft 49.50
11.0 FlfthS-fi ted marbte I granlfe stone only tift tobby wallincase of any design, groove making, strip fifting, etc. complete
sft 46.O0
a) From Basement-1&2 to 6t1i floor
(b) From 7th floor to 9th floor & Basement-3 sfr 47.15
\ Irnm l Ofh flnor to I 2lh floor &Rasement -4 sfr 48.30
/\ Frnm 1 ?fh fl^^r tn 1 5fh flnnr sfr 49.45
(e) From 1 6th floor to above floor sfr 50.60
re of Contractor
k*&,"red By
.a.{,2.
By PA'l .AGM/Sr.
1-eawlaP-
By
ri
of
Rate
SL
Description Unit (I1r)
No
72.O Fifting-fixing of potished & unpolished marbte / granite stone in floor, cement slurry below the stone, in/c. net removing, etc. all
completework
(a) From Basement-l&Z to 6th floor sfr 40.00
(b) From 7th floor to 9th floor & Basement-3 sfr 41.00
(c) From 10th floor to lZth floor &Basement -4 sfr 42.OO
I3.0 @jGraniteonwattitt/c,chasingthebrickwatl/RCCwall(forskirtingtileswithplasterflush
and also for marble / granite if requied) etc. all complete wol
For skirtino tiles includino wall chasinq
(a) From Basement-l&2 to 6th floor Rfr 14.50
Rfr 74.86
ft) From 7th floor to 9th floor &Basement-3
n+L ff +^ 1 ?th f1^ r k Rnsement -4 Rft 75.23
^^r
Frnm 1 ?,h flnnr ln 1 Sfh flonr Rfr 15.59
ffi
F"r lrarble / Granite Works (cuttinq mav required by the contractor!)
Rfr 15.95
-^Llira rrrnrlre * clrir ithor nhces lhalf mouldino I anoular) with Double step
A+la fl^^fl Rft 35.00
Rfr 35.88
(b) From 7th floor to 9th floor & Basement-3
/^\ r-^* r n(L fl^^il +^ 1 ?+14 fl^^t' R, Ra<pfrcfr+ -4 Rfr 36.75
xN" \ JJ
Signature of Contractor Prepared By
ffi's,rr#W9.Wa*&*#* MW By AGM
Clrd Rv & By PM/S.PI?rsr.AGM/Sr
( caln 1fr2-
'1
By
& knob supplied bv NRED in/c. supplying of dill machine, dill bit, etc. allcomplete work.
(a) From Basement-l&Z to 6th floor Each 20.oo
(b) From 7th floor fio 9th floor & Basement-3 Each 20.50
(c) From 1 Oth floor to 72th floor & Basement -4 Each 21.OO
(d) From 13th floor to 1Sth floor tzch 21.50
(e) From 16th floor to above floor Each 22.OO
zt.o Sand slone fittinq-fixing work on wall for any size of sfone
i. Sand stone fittinq-fixinq on inside wall for any size of stone (with fitting-fixing of scaffolding)
(a) From Basement-7&Z to 6th floor sft 27.OO
(b) trom 7th floor to 9th floor & Basement-3 sft 27.68
(c) From 1 Oth flool to 72th floor & Basement -4 sft 2a35
(d) From 13th floor to 15th floor sft 29.O3
(e) From 1 6th floor to above floor sfr 29.70
ii. Sand stone fittinq-fixinq on outside wall for anv size of stone (without fittins-fixing of scaffolding)
(a) From Basement-7&Z to 6th floor Sft 45.00
(b) From 7th floor to gth floor & Basement-S sft 46_13
(c) From 1 Oth floor to 1 2th floor & Basement -4 Sft 47.25
(d) from 1 Sth floor to 1 5th floor sft 48.38
(e) From 1 6th floor to above floor sft 49.50
22.O Carruino / liftino / take down works of all tvles oF l/es
iJead iarrying from store to hoist point & lifting / take down of all types of Tiles (ceramic glazed / non-glazed tiles only for inside
workl bv hoist
(a) From Basement-l&2 to 6th floor sft 0.35
(b) from 7th floor to 9th floor & Basement-3 Sft 0.36
(c) From 1 Oth floor to 72th floor & Basement-4 sfr 0.37
(d) From i 3th floor to 1 Sth floor sft 0.38
(e) From 16th floor to above floor Sft 0.39
i. Garrying / lifting / take down of all types of Tiles (ceramic glazed / non-g[azed tiles only for inside work) by head carrying (when
roof hoist not availablel from store / stackino olace / anv other Dlaces (inside of proiect)
(a) From GF to 1st Floor & GF to Basement-2 (Among floor of GF toBasement-2,no charge will be applicable) sft o.35
(b) Add. Each addittonal floor from 1 st floor to above floor & from Basement-? to downward floor sft o.25
iii. Unload & carrying of all types o(Tiles (ceramic glazed / non-glazed tiles) from transport to GF store sft 0.35
( N.B: if suooliers wo*er not availaD/e & as per instruction of procurement department)
23.0 Carruino / lifttnq /take down works of all tvpes of Marble / Granite
i. Head carrying from store to hoist point & lifting / take down of all types of marble & granite (ottly foryllg rrIQ iy.loitt
(a) From Basement-7&Z to 6th floor sfr 2.O0
M
to downivard floor Sft o.25
111) .\dcl- Eactl additronal floor from 1st floor to above floor & from Basement-z
a
6rtfi1* rA4htlb22
Vo.tt-u
Signature of Contractor Prepared By Ckd By & Recom By PM 'ccl By
r\ Desktop
:sktoo\Tiles l3.I I.2022\Tiles Rate 11.202:
5of9
SL Aate
Description Unit (IL)
No
24.O Upto 2" size SS slnp / U-channel fitting-fixing in tiles / marble / granite groove with supply of equipments, etc. all complete work.
/N.8; SS sfnp, screw & adhesive supplied by NREL)
(a) From Basement-1.&2 to 6th floor Rfr I5.OO
fu) From 7th floor io 9th floor & Basement-3 Rft 15.38
(c) From 1Oth floor to 72th floot & Basement -4 Rft t5.75
(d) From I 3th floor to I 5th floor Rft I6.13
(e) From 16th floorto above floor Rft 16.50
25.o ?utting charge of random marble/granite as per required size & to avoid unnecessary wastage For any location,
sft 17.OO
'Measurement: Actual usuable quantity to be considered for contractor payment @rtra matum cufting charge not to be allowed). l
26.0
=iftinglixing of any size & any type of joint of rustic tiles / clading tiles at outer swface of building
il At outer surface of buildino without fittino.firino & removino of scaffoldino klze: 8"-12"x16"-24")
(a) From Basement-l&Z to 6th floor sft. 50.o0
(b) From 7th floor to 9th floor & Basement-3 sft 57.25
(c) From I Oth floor to I 2th floor & Basement -4 sft 52.50
(d) From 13th floorto 1Sth floor sfr 53.75
(e) From 16th floor to above floor sfr 55.OO
lii) At outer surface otbuildinq without fittinq-fixinq & removinq of scaffoldinq (size: Below 8"x16"-241
(a) From Basement-l&2 to 6th floor sft 55.00
(b) From 7th floor to 9th floor & Basement-3 sft 56.38
(c) From 1Oth floor to 72th floor &Basement -4 sft 5 t.tJ
(d) From 13th floor to I 5th floor sft 59.13
(e) From 16th floor.toabove floor sfr 60.50
27.O
Fiftinglixing of plaza tiles at floor / wall in/c. supply of ail consumables & equipments
i) 6"16" tiles at floor
(a) From Basement-7&2 to 6th floor sft 23.OO
(b) From 7th floor to 9th floor & Basement-3 sfr 23.58
(c) From 1 Olh floor to 1 2th floor & Basement -4 Sft 24.15
(d) From 1 Sth floor to 1 5th floor sfr 24.73
(e) From 16th floorto above floor sft 25.30
i) 6"x6" tiles at wall,
(a) From Basement-l&Z to 6th floor sft 25.OO
&) From 7th floor to 9th floor & Basement.3 sft 25.63
(c) From 1 Oth floor to 12th floor & Basement -4 sft 26.25
(d) From I 3th floor to 1 5th floor Sft 26.88
(e) From 1 6th floor to above floor sft 27.50
ii) 1"x4" tiles at floor
(a) From Basement-l&Z to 6th floor sft 26.OO
(b) From 7th floor to 9th floor & Basement-3 Sft 26.65
(c) From 1Oth floorto 12th floor & Basement -4 sft 27.30
(d) From 1 3th floor to 1 Sth floor sfr 27.95
(e) From 16th floor to above floor sft 28.60
v) 4"r4" tiles at wall
a) From Basement-l&Z to 6th floor sft 2a.oo
fu) From 7th floor to 9th floor & Basement-3 Sft 28.70
(c) From 1 Oth floor to 1 2th floor & Basement -4 sft 29.40
(d) From I 3th floot'to I Sth floor sft 30.10
(e) from 16th floor to above floor sft 30.80
2a.o .itting-fxing
of 6"x6' and 4"x4" plaza tiles at skiling in/c. wall chasing (if required)
) 6"x6" tiles at skirtino ftt. upto 6")
(a) From Basement-t&2 to 6th floor Rfr 12.50
fu) From 7th floor to 9th floor &.Basement-3 Rfr 12.81
(c) from t Oth floor to I zth floor & Basement -4 Rft 13.73
(d) From 1 3th floor to 1 Sth floor Rfr 1,3.44
(e) From 1 6th floor to above floor Rfr 13.75
i) 4"x4" tiles at skirtinq (ht. upto 4")
(a) From Basement-7&Z to 6th floor Rft 12.50
(b) From 7th floor to 9th floor & Basement-3 Rft 12.81
(c) From 10th floorto l?thfloor & Basement -4 Rft 13.13
(d) From 1 3th floor to 1 Sth floor Rft 13.44
(e) From 16th floorto above floor Rft 13.75
SignatLme Prepared By
W ,2t
ckd & By PM/S.PNflSr.AGM/Sr. DGM/GM
iitulatt
C:\Users\co-musabbir\Desktop\Tiles-13'11.2022\Tiles Rate Schedule-17.1 I 202?
6of9
SL Rate
Description Unit
No CTK.)
(b) From 7th floor to 9th floor & Basement-S Rft 73.33
(c) From 10th floor to 1 2th floor & Basement -4 Rfr 13.65
(d) From 1 3th floor to I Sth floor Rft 13.98
(e) From 1 6th floor to.above floor Rfr 14.30
30.0 '-ifting / Carrying of sand per floor) by head carrying as per direction of project Engineer-in-charge where electic hoist not
?vailable bxceot qround floor, semi-basement floor or Basement-l )
(i) from GF to lst Floor & GF to Basement-2 (Among floor of GF to Basement-2, no charge willbe applicable) cft 3.O0
(ii) Add. Each additional floor from lst floor to above floor & from Basement-2 to downward floors cft 3.OO
31.0 '-ifting / of cement bag per floor by head carrying as per dorection of project Engineer-in-charge where electric hoist not
Carrying
?vailable (except ground & semi-basement floor)
til from Cf to 1st Floor & GI to Basement-? (Among floor of GF to Basement-Z, no charge willbe applicable) Bac, 5.OO
(ii) Add. Each additional floor from Ist floor to above floor & from Basement-2 to downward floors Bag 5.00
32.O .iftinq-fixino of bamboo scaffoldinq at out side of buildinq where required N,B: all materials supplied by NREL) sft 4.00
sft 4.50
=iftino-fxino of MS oioe / steet scaffotdino at out side of buildinq where required
33,0 N.B: all materials supplied by NREL)
34.0 ?,emovinq of bamboo scaffolding and stackinq at safe places sfr 3.00
35.0 ?emovins of MS pipe / steelscaffolding and stacking at safe places Sfl 3.50
36.0 )ismantlinq of existino floor &walltiles / marble / qranite including removing & suface cleaning of cement moftar
) lnside of buildino. uoto GF at out side of buildinq and boundary wall fin/c, scaffoldins work) & stacking at same floor sft 15.00
\), Debris bag filling, carrying & take down from different floors to GF by roof hoist sft t.oo
N.B: This rate mav aoolv with dismantle quantitv, where roof hoist is available.l
l), OebriE bag filling, carrying & take down from different floors to Ground floor by Head load
(i) From GF to lst Floor & GF to Basement-z (Among floor of GF to Basement-2,no charge willbe applicable) sft 1.25
(ii) Add. Each additional floor from 1st floor to above floor & from Basement-Z to downward floor sfr o.75
i)Iutside of building: 1st floor to above (excluding scaffolding work) in/c. fitting .fixing hessian cloth / triple / polythene & debris
rlnnkinn rf rrrifrhlp nlecec af arottnd floor-
(a) lrom Basement-7&Z to 6th floor sfr 27.50
(b) From 7th floor to 9th floor & Basement-3 sft 28.19
(c) From 1 Oth floor to 12th floor & Basement -4 sfr 28.88
(d) from I 3th floor to 1 sth floor sft 29.56
(e) trom 16th floor to above flpor sft 30.25
37.0 )ismantling ofexrstrng floor and watt paster & suface cleaning and debris stacking in safe place af sarne floor as per direction of
the
Engr-in-Charge (any thick. both intemal oder suface} N.B: Rate allowed for all type ol
& gontra$lfs)_
(a) from Basement-l&2 to 6th floor sft 5.00
(b) trom 7th floor to gth floor & Basement-3 sft 5.00
(c) from 1 Oth floor to 72th fl6ot & Basement -4 sft 5.00
(d) From 1 3th floor to I Sth floor sft 5.00
(e) From 16th floorto above floor sft 5.00
Extra rate for providing male-female anchoring at back side of tiles / marbte / granite for working at verticial surtace (if required)
3E.0 t8r pcs
3.00
with using cut pieces of tiles / marble / granrle & necessary adhesive (adhesive supplied by NREL) of key
'l-
Signaturc of Contractor By AGM (C) DGM/CM Alqroved BY
(b) FIom 7th floor lo gth floor & Basement-3 sft 51.25
(c) From lOth floor to 12th floor & Basement -4 sfr 52.50
(b) From 7th floor to 9th floor & Basement-3 sft 59.45
(c) From 1Oth floor to 1.2th floor & Basement -4 sfr 60.90
(N.Br Ihis rate is applicable, when prior approval is given by the authorrty. This bill will be adjusted / submifted with running bill)
a. Mason for tiles / / marble / granite work (inlc. supply
mosaic of cutting machine & disc) per day 800,00
b. Helper for tiles / mosaic / marble / granite work per day 550.00
41.O Additional rate may approve if tiles / marble / granite (except pavement t/es & s/afe sfone,) rb laying considering brick ioint as per
sft 2.OO
direction of Engineer-in-charge (ElC).
42.0 Fiftinglixing of tiles upto 6' width at kitchen window & toilet window / HW seal, toilet door seal, shower barrier, etc. in/c. CC
casting (if required) as per direction of Engineerln-Charge.
i. For Toilet Door seal / Kitchen Door seal / Shower barrier or bit ,
fMeasurement: Centre line length along the top of door seal / shower barrier or bit to be considered the billing measurement. Vertical
sldes nol fo be considered for anv kind of bill.l
(a) From Basement-1&2 to 6th floor Rfr 40.00
(b) from 7th floor lo gth floor & Basement-3 Rft 41.O0
(c) From 10th floor to 72th floor & Basement -4 Rft 42.OO
(b) From 7th floor to 9th floor & Basement-3 Rfr 18.45
(c) From 1 Oth floor to 1 Zth floor & Basement -4 Rft 18.90
43.O
Labor charge for CEMENT CONIREIE (CC) works 1" to 3" fhlckness in floor in/c. chipping, cleaning, washing, mixing the
concrete, laying in position, compacting, necessary level / slope ma6ng, shuttering / stopper fitting materials lifting at different
floors / basement, etc. all complete as per direction'lf the Engineerin-Charge (Any floor).
rc of Contractor
,ffi"M Ckd By AGM (C)
Desktop\Tiles-1
A1't*o
By
rates allowed in the schedule are inclusive (where all materials from site store yard to working place
any height or distance within the projects perimeters.
)ntractor shall supply: a) All fype of slone (excepl yellow slone) b) All type of machinery with atl type of cutiing dlsc,driti bil,
I scraper, etc. c) Other hardware material like PVC separatorl spacer, Foam, Broom, nylon, sutli, etc. d) other necessary tools
i.e spade, belcha, tagar, sprit levei, ruler, leveling pipe etc
shall sup,plf a) Cement, Sand, Tiles, Marble, Granite, Slate stone, Brick & stone chips (if required) b) Color pigmeri /
Pointing materials c) Yellow Stone (one pcs for 200sft) d) Tiles cleanlngchemical (i.e. tixol/vixol, etc.) e) Adhesive (like Conmix,
tc) forgeneral rate schedule. f) Scaffolding/ staging materials.
Alt incidental accidental expenses are to be borne by contractor either in site or adjacent to site. Company will not pay any
/
compensation 1o the workers / anybody either injured or dead during work for negligence etc. The contractor will be fully
responsible for ensuring the safety and securify of the workers employed and will be liable for any compensation that may be
8
claimed.
9 Contractor musl ensure ihat he or his workers do not involved themselves in any kinds of antisocial activities.
Any faulty or defective work done by contractor shall be rectified by contractor at his own cost. Contractor should rectify his bad
10
qualities of work and after rectifying his work upto the work of qualities his Bill should be generated.
11 naii
Rate of aU
anv 191_tclffi1.
non-schedule ilgry!qyer\-(r&"rl!el1!_ql9q"4 both ihe parties as per mai[et iates.
items of work (if inv) shall be settled by !9:!l!qrglqq: 11!qtl4t1at.!.
nunning 6i11s *iiiG preparea Uy conEaitor ana Site ingineer jointLy after completion of a targeted stage durring the satisfactory
72
progress of works.
sx of eiCh iunning Uittea amount witt Ue ,itania as Security Deposit, which will be released after 03 (Three) months of his
r3 satts!{ro1!9m
pletion of the whole wgk, slbjg:l
lg:l?**q
? iyvt?t" ?t _t|1|ror1 {alasement,
14 finat triii witt Ue maae after satisfactory completion of work with followi-ng NREL conditions.
lf you (contractor) fail to achieve the work progress /
/ fail lo complele the works leave the project work (without sho*ing ,ny
15 proper reason) in your jurisdiction then the remaining work will be done by other agency & those exfra payment (if required) to
be adjusted from your NREL accounts / payablebills. Also, your payable amount may freeze up to the completion of the project.
16 Rate inlc. of chipping on R.C.C / Brick surfaces (if required) before filting fixing of tiles, marble or granile etc t;ik.
rfeaie tifie caie ana resporufuitiiies of t[e gooai ii*ea to you for fixintahild tvoi.d any acctdental / intentional damage of
1.7
NREL items. You will have to pay for such damage, if any as per the prevailing market rate.
youwill beresponsiblefordailycleaningof brokentiles/marble / grantle,otherdebris/wastaSe/ioauieabyliles / marble /
18 ite work according to your jurisdiction from working place to a surtable position as per mentioned by Engineet-rn-charge.
ise, perlalty will be imposed as per fiaragement deciston.
19 Workers must wear safefy belts and heimets during working periods.
20 NREL will supply Eleclricity, water & sewerage facilities at the lime of woili'
21 Burner (if required), cookeries & cooking person to be arranged,by vendor (Iire wood / fuel supplied Uy Nrut l
22 right to cancel any part of the scopi of work or full work order without showinS-ny reason.
23 is rate will be app\icable tb.a1l type of vendors, outside workers & Sorder
is schedule of rates also applicable for tile / marble / granitefixing work by usi:rg conmix materiali instead of cement sand
24
mortat-
25 A11 work wiii be done ai per laiesr5;;6,*:[ giiitattts procEure (soP) / As per schedule & as per direction of Project-in-charge.
The above mentioned wbrks shall be completed by lhe contractor accipting lhe work order as per Company approved Schedule
26 of Rates. If after starting of the work ur,y it.*
is not done by the contractor and the said items is to be completed by another
corltractor and it takes more than the fixed rate then the additional cost will have to be borne by the previous contractor(s).
Note Ihave read and understood att the terms and conditions of fhis work order and have personally / inspecfed this
proiect(s) of
NREL and lhaye srgned below knowing / understanding thd drawing and agreeing to do the work.
,/
h\UtqF
. c9
autatz
By PM/S. Ry
Ckd By AGM (C)
C;\Users\co-ntusabbir\ Desktop\Tiles- 2022\Tiles R^te Schedule t1.2022
si
Page 9 of 9
:) g?FrEFr "rRfq( {r{r crrsr{ Ew-or q 6rcg wEE cfr< cqr+ snsTr qrrrflr:r rtrs Ers-{T €{ g{rsr sT{l' frfuEm !n-${rfts
<mefr wo(e (({{rr{ arrrqD r
r) @ qTs {f,rcr( nIeK 6qq nrqK <ffia] ef ryys {<nffi ffis fu-s, tr4 ftB, ffi4 srr{ ffi qq w-s
<-<r"rrrg"rrBrfl q-sr+lqpgie$r<cruft cva-lfiGtsRsrsts, c-flqrc, c+rl, <rry, xttfi, XBtsWr
NREL FIt{t, <TF, Btflq, Tlrf,{, al-{.rlD, cXB "nsK, IE ,g<s ersrf,f,ir Gffi t{ft flcirsT;l ET) ?0 (lgr Tq<F /
r;FGIr-{ F{GI: s-)
q<r< <rqmR-o (cvrF[ rixor/Vixor, fuTlfr) e) qrh (mrr+
"ngffir Br+-Eq aqq "tlersr (loo <:furB< uIll ,c+ fam $ Dltdc "rFer<
rt)
co n m ix, ffi)cl{rdcr 6<t F fuErq-{ gT{r r O qrc+rfu r / I?BI}F[ Gfl?F-{.I I
e) qqs ffi:m wa.fi Eit6l rFpP'trt aq1 QfQfixm-tq-Elr6-d srrq onctrruflI E.[g. EGI I
8) R-alrr+< orrqx sdl ffi o-r{ [sTs lrr< qq-fl q-Z"fqqf gnn s-fl rlg cs6o rc{r
a) ff'omrdrc q-<TrI ffi-s I qfafu T-{r o.rqB flrffi-t{-Ensfu qR-sK fr_{-{fr .g{r ful-{r qTsl-fr R(,Ro"ryvcr< Tr$, rrerl
o{ro qf,{l cnnzB c{TsIr<-<F TdcI oaco <lqf qrq, ff-orqrdrc @ Bror )ooo.oo (.{o Erql{ frorf gE firfi R-qrT{ gT+t m.B"I{'r
frcis cr< gqq mt{rcct rorq c{rB"t qt-\r? e{r6 wGK [sr{rr"l) <rEa p-gr r{rs RrGr I curB mBol<q yrm !o% .fi c<fi qrcqr ffi
z a-+io orq v,5Fs s-fl ErT[q ur{ B"r< :oz, [s{r{ {I s[{rg[ r
\e) {ft ffi-slnr( Erf,f?rs.16 'Iwfi <rqls{ cvrl r'c=nlts q,nrrB q-strq qE<r srcsr{ qqflfuE fieq s-<rE qsRT grllgJfiT off
<rRfts -qsGo s-<ls oqf erq <T sfnq T 9< flEfrfq q6o gqg Fnfur q€fi s-{ro rn{r qlI sr{ NREL red"ir offirn"r <TEE
+-.om rT{v qfq.oK q({{Fct s?6R I
c) a$lSI sM crrfB Tr {sil'i{g comr r<r<6 r< <f+ o{r q(<r {Tr
u) ffi=ornmro cltm <r rTrttr{ "nr.I rI:l.s qr{{E-sffi {irD ({.[ s-{(g qr< r rnffi qq<rT qr'n<FFr gr{{ sr{<iflrr{ gr{r
n-f<ouFrozroBqrqs<r{-fl (tnq cor--"nft 6q6a1qfuo6q cnr<ltr 6-srhr(fiqs.Tfusrmfi-dr+{g[ s qrrr{rfir<r"rgrfiFto
o<r< sT{i x*I'fu rr{ qr-ft ?nsr{ g<r qiR -<
c{Ifl r g'q{ rorr* mBT<rfi gI{r frsrrTK qr-fr ?nsr{ r
))) snsT{ c!. Comr FfGU{ ffiq\5 Aft qmre1 qre1srn-{ q;{ Bw'nm-< q6r <rqn-q<,i-< qgr-ft ffi <.-s qc< t
5r) srrsT( )TCsrTW{o qaflE( qrT .qsB q$lnlE'r cq-{ Es{K "n-s ff-orqm sr<q {EE EfqfrTK dqrsrr{ ffir frq et€s q{r{{ r
:uy wffi uoxn R-rco tk$rr( cz frft'Bffi furrGE fR<rl-sr sInrlio) frcl'r{ fl?fl Er{, {T er.FEI <I{{rfl;[r .{{ $Tq 6q66 affi
"1r<r offi r1"f
goB ryqnetE grf-U< qrqm ?FKEJ oe &T lrq qm w<{g' s-f,r crcs RI-c{
.rffi g {l.rq SM {rgFrq.-{<F-\e r(-{ {-otTt s-{K'IGI E-grg fr
I
: 8 ) N REL
-f,
hR O-g qr< I
)a) sfr, qttfr rffi-+mrO orrsTl qqflB w6-q re-<rc <lqf qq / s'Mefr q-T"f o-sru <rf ql / qr"t;lm g?rB{rrd a-s.rf,R sM (csFre
€lgg omq qr ct1?r0 erv 6m vr< w<FrB Frs[ wlr c(qr qmr o{r Eri{ .q{r lTBfii-s'qqf anq ({fr arllq{ E-{) wR;[ritr NREL
erorB$ z qrnx fr-q Gro r:WT o{T qr< | -qqrs[e, qrn;[rGF grq{ Brfl gorf,< crrfB "rfs gT'{r (r?n cTru flGr r
:uy Bt+q, lirdq <r aT{rIE ffi fu.Eq offir qr'(fl R.c.c / lBefr( G"rR-wl Gftrqq tqfr gGrw{ sr)t .s riF-{ 6rFrE frBBs E{
srsrqr Er{ (c{?IIr{ eIErq-{) r g cs'G qrEIIqT q-{ st{T-qI sr{ {Il
5c) w"I;[ro rsrar{ re-<i "tqiefr< (a-or{ ftEr onsT{ 91.{t) {g.c{r qTfty frco Er< ws NREL qli(E{(3F-{ f,+T{s E6{MR$ /
Iwrco rB gsJC{ qm r sfr sG {T, snrar qr"rqnre .qI s-{rffi str< sr{r auFs srsTK r< w1vr-ft qqf aqn ofls Er< r
)u) vrqr Ertqc I rnf,q u flmIB, q{rFlr K(qFrc.trl u Brtcq / {rrf,d z .TrqrlB snsTir qrfl Gsnrfio <6v wmm snsTr .s?rBrl<
w{Tr-ft srrsr<r sTrrflr r?rcs qrffi t{-Ersl qv'-s frffis qtrl qF{rg( / erRsr-{ s-{Fr qar qrryR qr-AI Ei?Fr<;r wqlstw
w'T;[rro <I{{I"r-+ g< frqrg. q-s.r-ft srRnT{T qI((TR o{l Et< I
) b) srq-{ {:K uIt-orq< q-{qF R-sr"fsr ra$ ,c{r rrdnB o{Krs qf{ I
r:t <rd-<Ffrgrxrqlqv),TrsKGFqREisq.q<r+r<{rGrreffi-srhr{$Ss.<rr{s-d[u{[<Ffrflrtsrw{qNRELqTs(;kIsT{]F[5/
qffireerno{r$t \
*) ronffi(NREL)corousr?I6Iq-"frnTqrgrtotrw{{rqlrfl<rcqrsrrllqirf<rr-"I.(srw{qnq-r<iEEs-fl'(qkomxr<-t6lo-r<t
re) ,48 qK w s-{r{n ffi-srqr<, <rird-{ off .q{s {fu-T{ cstE arrrMl rr{ r
frsus qrfr gt alrgrfr qnrr"r* Ea. Ttrg frT{ e qffi efi-s. {r<r, (qr+ .{<r NREL .{T Etrf,Fls gsEB flftra
?6'GtT