DETAIL DISCRIPTION UNIT RATE AMOUNT TOTAL
no
Excevation for Curb Stone
Foundation area 1'-6'' With
1 Excevation R.F.T - -
Depth 6'' to 9'' Leveling
Completed.
Laying of Rought Bed for
Foundation 1:3:6 or 1:4:8
2 Rought Bed R.F.T - -
Mater 3'' to 4'' thicks (as per Per R.F.T
requied). 120/-
Laying & Fixing of Curb
Stone as per Leveling
3 Curb Stone R.F.T - -
Proper 1:6 Mater Joints
Completed.
Back Filling for back area
4 Back Fill R.F.T - -
curb stone Completed.
Total Labour Charges A ONE Finishing 120/=
PER R.F.T.
Please Note the Above Mentioned Scope of Work Shall be done by M/S JAMIL & SONS on
following Tern And Conditions.
Muhammad Jamil
CEO
JAMIL & SONS
NPI CONSTRUCTION AND ENGINEERING KARACHI KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
To,
Syed Qaiser Raza
PROJECT: Construction Of Building FB Area Karachi
SUBJECT: QUOTATION FOR CONSREUCTION OF BUILDING GREY STRUCTURE AT
LABOUR RATE AND WITH MATERIAL.
ATTN: MR. Qaiser Sahab
S.
DISCRIPTION UNIT RATE AMOUNT TOTAL
no
Construction of Grey
Structure with Block
1 SFT 500.00 - -
Massionary Walls Labour
Rate.
Construction of Grey
Structure with Block
2 SFT 1,200.00 - -
Massionary Walls With
Materials Steel 3/8 Guage
Please Note the Above Mentioned Scope of Work Shall be done by M/S Qureshi
Enterprises on
following Term And Conditions.
Muhammad Jamil
Exicutive Director
NPI CONSTRUCTION AND ENGINEERING KARACHI KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
To,
Syed Qaiser Raza
PROJECT: Construction Of Building FB Area Karachi
SUBJECT: QUOTATION FOR CONSREUCTION OF BUILDING GREY STRUCTURE AT
LABOUR RATE AND WITH MATERIAL.
ATTN: MR. Qaiser Sahab
S.
DISCRIPTION UNIT RATE AMOUNT TOTAL
no
Please Note the Above Mentioned Scope of Work Shall be done by M/S Qureshi
Enterprises on
following Term And Conditions.