You are on page 1of 9

To,

Agha construction Company


PROJECT: GREENLINE PROJECT (PACKAGE: GL-03)
SUBJECT: QUOTATION FOR CURBSTONE EXCEVATION LAYING & FIXING AT LABOUR RATE.
ATTN: MR.AFAQ SB

S.
DETAIL DISCRIPTION UNIT RATE AMOUNT TOTAL
no
Excevation for Curb Stone
Foundation area 1'-6'' With
1 Excevation R.F.T - -
Depth 6'' to 9'' Leveling
Completed.
Laying of Rought Bed for
Foundation 1:3:6 or 1:4:8
2 Rought Bed R.F.T - -
Mater 3'' to 4'' thicks (as per Per R.F.T
requied). 120/-
Laying & Fixing of Curb
Stone as per Leveling
3 Curb Stone R.F.T - -
Proper 1:6 Mater Joints
Completed.
Back Filling for back area
4 Back Fill R.F.T - -
curb stone Completed.
Total Labour Charges A ONE Finishing 120/=
PER R.F.T.
Please Note the Above Mentioned Scope of Work Shall be done by M/S JAMIL & SONS on
following Tern And Conditions.

TERM AND CONDITIONS.


Survaying work shall be in the scope of Client.
All Materials shall be supplied by client.
Electricity and manpower and Construction Yard Shall be provided by Client

Muhammad Jamil
CEO
JAMIL & SONS
NPI CONSTRUCTION AND ENGINEERING KARACHI KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
To,
Syed Qaiser Raza
PROJECT: Construction Of Building FB Area Karachi
SUBJECT: QUOTATION FOR CONSREUCTION OF BUILDING GREY STRUCTURE AT
LABOUR RATE AND WITH MATERIAL.
ATTN: MR. Qaiser Sahab

S.
DISCRIPTION UNIT RATE AMOUNT TOTAL
no

Construction of Grey
Structure with Block
1 SFT 500.00 - -
Massionary Walls Labour
Rate.

Total Labour Charges A ONE Structure Per SFT. 500.00

Construction of Grey
Structure with Block
2 SFT 1,200.00 - -
Massionary Walls With
Materials Steel 3/8 Guage

Total Labour Charges A ONE Structure Per SFT. 1,200.00

Please Note the Above Mentioned Scope of Work Shall be done by M/S Qureshi
Enterprises on
following Term And Conditions.

TERM AND CONDITIONS.


All Materials shall be supplied by client Contract Labour Rate.
Electricity, Water Shall be provided by Client.
Deparment Issue resolve by Client.

For & on Half


Qureshi Enterprises

Muhammad Jamil
Exicutive Director
NPI CONSTRUCTION AND ENGINEERING KARACHI KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)
To,
Syed Qaiser Raza
PROJECT: Construction Of Building FB Area Karachi
SUBJECT: QUOTATION FOR CONSREUCTION OF BUILDING GREY STRUCTURE AT
LABOUR RATE AND WITH MATERIAL.
ATTN: MR. Qaiser Sahab

S.
DISCRIPTION UNIT RATE AMOUNT TOTAL
no

Construction of Building with


all Finishig Labour Rate and
1 SFT 1,500.00 - -
without Elevation And
Kitchen Cabnet.

Total Labour Charges A ONE Structure Per SFT. 1,500.00

Construction of Building with


all Finishig with Materials
2 SFT 2,500.00 - -
Rate and without Elevation
And Kitchen Cabnet.

Total Labour Charges A ONE Structure Per SFT. 2,500.00

Please Note the Above Mentioned Scope of Work Shall be done by M/S Qureshi
Enterprises on
following Term And Conditions.

TERM AND CONDITIONS.


All Materials shall be supplied by client Contract Labour Rate.
Electricity, Water Shall be provided by Client.
Deparment Issue resolve by Client.

For & on Half


Qureshi Enterprises
Muhammad Jamil
Exicutive Director
NPI CONSTRUCTION AND ENGINEERING KARACHI KAR/BRTS/GL-05 (SURJANI TO 2 CHOWRANGI)