Non Conformance Report

Product : Plot 19.1 - Kula Belgrade Date : 19-Aug-22


PMWeb # : 187 NCR# RS_BW_P19.1_S_024a_DNC_NCR_180
Subject : RS_BW_P19.1_S_024a_DNC_NCR_180_Podium gutter To : PIZZAROTTI MILLENNIUM DOO-
secondary steel members alterations Vladimira Popov
Status : Submitted NCR Related To: Workmanship
NCR Discpline: Architectural
NCR Description :
During the regular inspections of Podium roofing works, the Engineer observed unacceptable alterations on gutter
secondary steel members.
The following photos are clearly showing that there several kind of alterations and adjustments of secondary steel
members on Site, including Welding, unapproved connection details, etc have been applied.
Cutting and welding elements on Site is jeopardizing the strength and the quality of works (welding in this case).
Corrosion protection is also questionable.
Having in mind that such alterations are not acceptable, the Contractor is requested to replace all modified and
adjusted members on Site with new ones, in order to meet the approved structural calculations. Modified and
adjusted members are not acceptable for installation.
The Contractor and his Subcontractor are instructed to fully implement the Engineer’s requirements and meet all
necessary quality and structural standards on Site.

Contractor's Proposed Corrective Action :

Contractor's Proposed Preventive Action :

Approval to Proceed with the Proposed Corrective Action


¨ Approved to proceed ¨ Approved to proceed with comments as noted ¨ Not Approved
Requested Corrective Action Date
Comments :

Page 1of 2 PMWeb Generated Report


Non Conformance Report

NCR Closeout :
Corrective Action Implemented ¨ Yes ¨ No Action Completed Date
Comments :

Workflow Action Users


# All Must Approve Due Date Role User Instructions

0 Aug-24-2022 --Submitter-- Marija Binic-DNEC d.o.o

1 Aug-24-2022 PZM-CNT-PM (NCR) Iskra Djuric-Pizzarotti

Uros Markovic-DNEC
2 Aug-26-2022 DNEC-CSC-PM
d.o.o

3 Sep-23-2022 PZM-CNT-PM (NCR) Iskra Djuric-Pizzarotti

Uros Markovic-DNEC
4 Sep-26-2022 DNEC-CSC-PM
d.o.o

Workflow Log
Name Company Name Date Action Delegated To Comments
Marija Binic-DNEC DNEC DOO 19-Aug-22 Submit Dear Contractor,
d.o.o BEOGRAD-
Kajmakcalanska During the regular inspections of Podium
roofing works, the Engineer observed
unacceptable alterations on gutter
secondary steel members.

Please refer to pdf attached.

Regards,
DNEC Team