PPAP Document Submission Checklist
PPAP Document Submission Checklist
Agreement of Inspection S
List of approved TIER 2 suppliers S
Photographs of the Tools,
Fixtures, Guages & S
Equipments
List of external laboratories (if NA
the services are used)
Process Qualification Records NA / R
Packaging Standard S
Prepared By: Approved By:
Remarks
Approved By:
SUPPLIER NAME
Bill Of Material
SL.NO PART NO DESCRIPTION QTY MATERIALS REMARKS
Note - Deviations for characteristics with severity 4 and above are not permissible
Prepared by : xxxxx
Temporary
Nature or
Deviation countermeasu Corrective Target Date
deviation and Effect Severity
from mean re Action for CA
root cause
(Disposition)
o/s 0.26 NA
o/s 0.13
u/s 0.71
o/s 0.03
o/s 1.94
u/s 5.10
From the No effect on Request for Sustain the
o/s 0.14 initial mould function and 1 permanent approval
approval itself assembly deviation dimension
o/s 3.3
o/s 1.39
u/s 1.81
o/s 0.66
o/s 4.71
Date xxxx
Date xxxx
Date xxxx
Max permissible
Remarks
Qty for CA
NA
Supplier Name & Address : SUPPLIER NAME Page 01 of 01
Part Name: SWINGARM SUB Drawing No. N9092230 PFD Initial Date : PFD Rev.no. "00
Part No. XXXXX Issue / Rev.# 27.09.2013 13.09.2016 PFD Rev.Date : 13.09.2017
2.Dimension variation 2.Dimension As Per Drawing 1.a) Operator Skill Matrix Min.- (L-3) Complete
7.Environment :
7.a) Iuminous level (800-1000) lux.
4.Method :
Raw material and child parts
20 Manual 4.a) Verification for Min. and Max Stock Qty. Report
Storage
4.a) Visual tactile
5.Measurement : Nill
6.Material Handling :
7.Environment :
7.a)Iuminous level (400-600) lux.
Characteristic
Class (Special
Detection (D)
Occurrence
(SxOxD)
Severity
Process No. and Current Process controls - Prevention of
R.P.N.
Process Deliverables / Potential cause(s) / Current Process controls - Detection of Cause and / or
(O)
S.No Description of Potential Failure Mode Potential Effect(s) of Failure Cause and / or Prevention of Failure
)
Requirements Mechanism(s) of Failure Detection of Failure Mode
Operation Mode
Next.Process : Can not be Used for Next Process (S=8) Cause : Verification of Supplier Material
Cause : Verification for Supplier Material Test Certificate (D=8)
Vehicle Mfr. : loss of Test Certificate and 3rd-Party Test Report
1.Material Grade : IS 513 Material Grade Variation 8 1.Supplier Process Failure 2 FM : Receiving 8 128
Secondary function (S=6) End User : FM :
Inspection Report (D=5)
Audible noise vehicle operable (s=4) Nill
Next.Process : Can not be Used for Next Process (S=8) Cause : Incomimg Inspection reportst (D=5)
Vehicle Mfr. : loss of Cause : Incoming inspection Standards Gauge Inspection (D=7)
2.Dimension Dimension Variation 8 1.Poor Supplier end Control 2 5 80
Secondary function (S=6) End User FM : Nill FM :Supplier Inspection Report
: Audible noise vehicle operable (s=4) Visual (D=8)
Next.Process : Time Delay Cause :Verification for .Gate entry /Material Receipt Register
1.Qty Variation Cause : Supplier Inspection Report
MRR Register Entry Vehicle Mfr. : N.A 4 1.Supplier Process Failure 2 (D=8) FM : 5 40
2.Weight Variation FM : Nill
End User : N.A ERP Report (D=5)
1.Digital Vernier Caliper, Next.Process : Can not be Used for Next Process (S=8)
Range 0-300 mm . Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report Cause :Verification for calibration report (D=5)
Dimension Variation 8 2 5 80
2.Measurement Tap, Range: of not-good Part to Customer End User Equipment Used FM : Nill FM : calibration report (D=8)
0~5 meter . : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable trolley Design during Cause :.Verification for Maintenance Report (D=5)
Hand Trolley Condition. 1.Material Damage Vehicle Mfr. : N.A 8 1.Wrong Trolley Condition. NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Hand Trolley Condition. 1.Material Damage Vehicle Mfr. : N.A 8 1.Wrong Trolley Condition. NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audit
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Raw Material
20
Storage
Next.Process :Can not be Used for Next Process (S=8) Cause : Verification of Supplier Material
Cause : Verification for Supplier Material Test Certificate (D=8)
Vehicle Mfr. : loss of Test Certificate and 3rd-Party Test Report
Material Grade : IS 513 Material Grade Variation 8 1.Supplier Process Failure 2 FM : Receiving 5 80
Secondary function (S=6) FM :
Inspection Report . (D=5)
End User : Audible noise vehicle operable (s=4) Nill
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at
Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce work are
Inadequate operator Skill Matrix Visual Display (D=8) FM : In-process
No Excess Welding Excess Welding weld strength & Aesthetic Not Good (S=5) 5 2.Daily Fixture monitoring check sheet 2 5 50
Process parameter variation Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle 3.Operator skill matrix
final visual inspection stage (D=8)
operable (S=4) FM : Nill
Next.Process : Rework in Station before Process (S=5)
Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce
Inadequate welder Skill work are Matrix Visual Display (D=8) FM : In-process
No In completed Welding In completed Welding weld strength & Aesthetic Not Good (S=5) 5 2 5 50
3.Operator skill matrix Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle
FM : Nill final visual inspection stage (D=8)
operable (S=4)
Tack welding of
Brkt, RR Shock Next.Process :Rework in Station before Process (S=5)
30
absorber L + Hex Vehicle Mfr. : vechicle 1.Power sorce Problem Cause : Preventive maint, Process Cause : Set-up Verification Report (D=5) Preventive
Nut M10 Voltage = 20-25V Voltage variation operable but comfort but reduced level (S=5) 5 2. parameter not setted parameter display. 2 Maint.Check sheet (D=5) 5 50
End User : Audible noise vehicle correctly FM : Nill FM : In-process Inspection Report.(D=7)
operable (S=4)
Next.Process :Rework in Station before Process (S=5)
Vehicle Mfr. : vechicle 1.Power sorce Problem Cause : Preventive maint, Process Cause : Set-up Verification Report (D=5) Preventive
Current = 130-180A Current variation operable but comfort but reduced level (S=5) 5 3. parameter not setted parameter display. 2 Maint.Check sheet (D=5) 5 50
End User : Audible noise vehicle correctly FM : Nill FM : In-process Inspection Report.(D=7)
operable (S=4)
Next.Process :Rework in Station before Process (S=5)
Vehicle Mfr. : vechicle 1.Power sorce Problem Cause : Preventive maint, Process Cause : Set-up Verification Report (D=5) Preventive
Wire feed = 7-12 MPM Wire feed variation operable but comfort but reduced level (S=5) 5 4. parameter not setted parameter display. 2 Maint.Check sheet (D=5) 5 50
End User : Audible noise vehicle correctly FM : Nill FM : In-process Inspection Report.(D=7)
operable (S=4)
Next.Process :Rework in Station before Process (S=5)
Vehicle Mfr. : vechicle 1.Power sorce Problem Cause : Preventive maint, Process Cause : Set-up Verification Report (D=5) Preventive
Gas flow = 15-25 LPM Gas flow variation operable but comfort but reduced level (S=5) 5 5. parameter not setted parameter display. 2 Maint.Check sheet (D=5) 5 50
End User : Audible noise vehicle correctly FM : Nill FM : In-process Inspection Report.(D=7)
operable (S=4)
Digital Height Gauge, Next.Process : Can not be Used for Next Process (S=8)
Cause :Verification for calipration report (D=5)
Range (0~600 mm) , Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report
1.Dimention Variation 8 2 FM : calipration report Visual 5 80
No : of not-good Part to Customer End User Equipment Used FM : Nill
Inspection (D=8)
HIV/DVC/006 : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable plastic Bins Design Cause :.Verification for Maintenance Report (D=5)
1.Wrong Parts storage in
Parts storage in plastic Bins 1.Material Damage Vehicle Mfr. : N.A 8 during NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
STAGE 1 -Robot
Vehicle Mfr. : Reduce Nozzle not cleaned properly work are Matrix Visual Display (D=8) Maintanence Check sheet ( D=
Welding Of Boss
6.No Blow Holes Blow Holes weld strength & Aesthetic Not Good (S=5) 5 Inadequate welder Skill 2.Manitanence checksheet 2 5) FM : In-process Inspection Report.(D=7) 5 50
+Swing arm LH &
End User : Audible noise vehicle 3.Operator skill matrix 100 % Visual Inspection at final visual inspection stage
RH + Brkt RR
operable (S=4) FM : Nill (D=8)
shock absorber
40
assembly LH&RH+
Brkt chain case
mtg front assembly
+ Reinforcement Next.Process : Rework in Station before Process (S=5)
Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
swing arm R & L Vehicle Mfr. : Reduce weld
Inadequate operator Skill work are Matrix Visual Display (D=8) FM : In-process
7..No Burn Through Burn Through strength & Aesthetic Not Good (S=5) 5 2 5 50
Process parameter variation 3.Operator skill matrix Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle operable
FM : Nill final visual inspection stage (D=8)
(S=4)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at
Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce work are
Inadequate operator Skill Matrix Visual Display (D=8) FM : In-process
8.No Excess Welding Excess Welding weld strength & Aesthetic Not Good (S=5) 5 2.Daily Fixture monitoring check sheet 2 5 50
Process parameter variation Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle 3.Operator skill matrix
final visual inspection stage (D=8)
operable (S=4) FM : Nill
Digital Height Gauge, Next.Process : Can not be Used for Next Process (S=8)
Cause :Verification for calipration report (D=5)
Range (0~600 mm) , Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report
1.Dimention Variation 8 2 FM : calipration report Visual 5 80
No : of not-good Part to Customer End User Equipment Used FM : Nill
Inspection (D=8)
HIV/DVC/006 : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
2.Front width =
127 + 0.70 + 0.30
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce Nozzle not cleaned properly work are Matrix Visual Display (D=8) Maintanence Check sheet ( D=
4.No Blow Holes Blow Holes weld strength & Aesthetic Not Good (S=5) 5 Inadequate welder Skill 2.Manitanence checksheet 2 5) FM : In-process Inspection Report.(D=7) 5 50
End User : Audible noise vehicle 3.Operator skill matrix 100 % Visual Inspection at final visual inspection stage
operable (S=4) FM : Nill (D=8)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at
Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce work are
Inadequate operator Skill Matrix Visual Display (D=8) FM : In-process
6.No Excess Welding Excess Welding weld strength & Aesthetic Not Good (S=5) 5 2.Daily Fixture monitoring check sheet 2 5 50
Process parameter variation Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle 3.Operator skill matrix
final visual inspection stage (D=8)
operable (S=4) FM : Nill
STAGE 2 - Robo
Welding of Stage
1-Stage 2+ Bridge Next.Process : Rework in Station before Process (S=5)
50 Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
swingarm + Gusset Vehicle Mfr. : Reduce weld
work are Matrix Visual Display (D=8) FM : In-process
bridge L + Bridge 7.No In completed Welding In completed Welding strength & Aesthetic Not Good (S=5) 5 Inadequate welder Skill
3.Operator skill matrix
2
Inspection Report.(D=7) 100 % Visual Inspection at
5 50
gusset End User : Audible noise vehicle operable
FM : Nill final visual inspection stage (D=8)
(S=4)
Digital Height Gauge, Next.Process : Can not be Used for Next Process (S=8)
Cause :Verification for calipration report (D=5)
Range (0~600 mm) , Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report
1.Dimention Variation 8 2 FM : calipration report Visual 5 80
No : of not-good Part to Customer End User Equipment Used FM : Nill
Inspection (D=8)
HIV/DVC/006 : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of work area Daily Audit Check Sheet (D=5)
Dia Over size 8 Improper setting 2 5 80
Secondary function (S=6) End User : Audible 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
1.Bore ID =
Ф24.00 + 0.02 -0.10
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of work area Daily Audit Check Sheet (D=5)
Dia Under Size 8 Improper setting 2 5 80
Secondary function (S=6) End User : Audible 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at
Vehicle Mfr. : Reduce work are Cause : Set-up Verification Report (D=5) Tool History
2.No Bore line mark Bore line mark weld strength & Aesthetic Not Good (S=5) 5 Bore insert worn out 2.Tool history card 2 card verified ( D= 5 ) FM : In-process 5 50
End User : Audible noise vehicle Inspection Report.(D=7)
operable (S=4) FM : Nill
Digital Height Gauge, Next.Process : Can not be Used for Next Process (S=8)
Cause :Verification for calipration report (D=5)
Range (0~600 mm) , Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report
1.Dimention Variation 8 2 FM : calipration report Visual 5 80
No : of not-good Part to Customer End User Equipment Used FM : Nill
Inspection (D=8)
HIV/DVC/006 : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
2.Front width =127 + 0.70 +
0.30
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
3.LH Tube C.off =103 +
0.50
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
5.LH S/Abs Brkt C.Off
=114.30 ± 1.20
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
6.RH S/Abs Brkt C.Off
=109.30 ± 1.20
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
7.Symmetry =÷ 0.80
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
8.Front CC Brkt C.Off =100
± 1.00
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
9.Front-Rear CC Brkt C.Off
=10.30 ± 0.50
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
10.Bridge Tube C.D =125 ±
2.0
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
11.Front CC Brkt C.D =
34.20 ± 0.50
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
12.Rear CC Brkt C.D
=40.20 ± 0.50
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
70 Revising
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
13.LH & RH S/Abs Brkt
C.D 47.50 ± 1.20
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
14.S.Abs Brkt
Perpendicularity ┴ 1.00 mm
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
15.S.Abs Brkt Parelism =
Ф 0.5
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
16.Rear CC Brkt
Perpendicularity =
┴ 1.00 mm
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
13.LH & RH S/Abs Brkt
C.D 47.50 ± 1.20
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
17.Front CC Brkt
Perpendicularity ┴ 1.00 mm
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
18.Front CC Brkt C.D 168
± 0.80
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
19.Front-Rear CC Brkt C.D
= 350 ± 0.80
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
20.LH/RH Slot C.D =
488 ± 0.80
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Over Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
21.LH & RH S/Abs Brkt
C.D 458.30 ± 1.00
Next.Process :Can not be Used for Next Process (S=8) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Verified gauge
Vehicle Mfr. : loss of Improper Revising work area calibration Report (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Inadequate operator Skill 2.Gauge Calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
STAGE 5 - Manual
Welding of Stage 3
+ Clamp Disc brake
80
hose(2 no's) +Guide
chain mtg + Brake Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Anchor Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
8.Brake Anchor CD =
436 ± 0.5
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at
Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce work are
Inadequate operator Skill Matrix Visual Display (D=8) FM : In-process
No Excess Welding Excess Welding weld strength & Aesthetic Not Good (S=5) 5 2.Daily Fixture monitoring check sheet 2 5 50
Process parameter variation Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle 3.Operator skill matrix
final visual inspection stage (D=8)
operable (S=4) FM : Nill
Digital Height Gauge, Next.Process : Can not be Used for Next Process (S=8)
Cause :Verification for calipration report (D=5)
Range (0~600 mm) , Vehicle Mfr. : Out flow 1.Out of Calibration Cause : M.S.A report
1.Dimention Variation 8 2 FM : calipration report Visual 5 80
No : of not-good Part to Customer End User Equipment Used FM : Nill
Inspection (D=8)
HIV/DVC/006 : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
STAGE 6 -
90
Chipping
Next.Process : Time Delay and out Flow Rej
Operator Skill Matrix Min.- 1.Not Done Training Cause : Training Attendance Register Cause : Skill Matrix Report (D=5)
Operator Skill Matrix Low Level Completed Vehicle Mfr. : Out Flow rejection 4 2 5 40
(L-3) Complete 2.operator Absent FM : Nill FM : Skill Matrix Visual Display (D=8)
End User : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Rework in Station before Process (S=5) Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
Vehicle Mfr. : Reduce Nozzle not cleaned properly work are Matrix Visual Display (D=8) Maintanence Check sheet ( D=
No Blow Holes Blow Holes weld strength & Aesthetic Not Good (S=5) 5 Inadequate welder Skill 2.Manitanence checksheet 2 5) FM : In-process Inspection Report.(D=7) 5 50
End User : Audible noise vehicle 3.Operator skill matrix 100 % Visual Inspection at final visual inspection stage
operable (S=4) FM : Nill (D=8)
STAGE 7 -Visual Next.Process : Rework in Station before Process (S=5)
100 Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Operater Skill
Inspection Vehicle Mfr. : Reduce weld
work are Matrix Visual Display (D=8) FM : In-process
No In completed Welding In completed Welding strength & Aesthetic Not Good (S=5) 5 Inadequate welder Skill 2 5 50
3.Operator skill matrix Inspection Report.(D=7) 100 % Visual Inspection at
End User : Audible noise vehicle operable
FM : Nill final visual inspection stage (D=8)
(S=4)
Next.Process : Time Delay and out Flow Rej
Operator Skill Matrix Min.- 1.Not Done Training Cause : Training Attendance Register Cause : Skill Matrix Report (D=5)
Operator Skill Matrix Low Level Completed Vehicle Mfr. : Out Flow rejection 4 2 5 40
(L-3) Complete 2.operator Absent FM : Nill FM : Skill Matrix Visual Display (D=8)
End User : N.A
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
STAGE 8 -
110 Next.Process :Rework in Station before Process (S=5)
Retapping
Vehicle Mfr. : vechicle 1.Power sorce Problem Cause : Preventive maint, Process Cause : Set-up Verification Report (D=5) Preventive
Tapping Gun RPM = 200 Speed variation operable but comfort but reduced level (S=5) 5 3. parameter not setted parameter display. 2 Maint.Check sheet (D=5) 5 50
End User : Audible noise vehicle correctly FM : Nill FM : In-process Inspection Report.(D=7)
operable (S=4)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
1.Dimension 124+0.7+0.3
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
1.Dimension 124+0.7+0.3
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
1.Dimension 200+2.0
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Over size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
1.Dimension 103+0.5
STAGE 10-
130
Revising Next.Process :Can not be Used for Next Process (S=8) Improper clamping Cause :1. Operation Standard displyed at Cause : Set-up Verification Report (D=5) Welding Fixture
Vehicle Mfr. : loss of Locating pin Worn out work area Daily Audit Check Sheet (D=5)
Dimension Under Size 8 2 5 80
Secondary function (S=6) End User : Audible Locating stopper worn out 2.Fixture calibration report Operater Skill Matrix Visual Display (D=8)
noise vehicle operable (s=4) Inadequate operator Skill FM : Nill FM : In-process Inspection Report.(D=7)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Final Acceptance
140
Gauge Inspection
Next.Process : 1.Problem in Next Process,Part have to be Rework Cause:Verification for Internal Auditee Report (D=5)
Gauge calibration Cause : Internal Audit
Wrong Dimension Vehicle Mfr. : N.A 5 1.Wrong Ispection report 2 FM : PDI Inspection 5 50
frequence/Gauge Check list FM : Nill
End User : N.A Visual tactile(D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Final Visual
150 Next.Process : Rework in Station before Process (S=5)
Inspection Cause :1. Operation Standard displyed at
Vehicle Mfr. : Reduce Cause : Set-up Verification Report (D=5) Operater Skill
Inadequate Operator Skill work are
No Powder coating peel off Powder coating peel off weld strength & Aesthetic Not Good (S=5) 5 2 Matrix Visual Display (D=8) FM : 100 % Visual 5 50
3.Operator skill matrix
End User : Audible noise vehicle Inspection at final visual inspection stage (D=8)
FM : Nill
operable (S=4)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (800-1000) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Cause :1. Operation Standard displyed at
Next.Process : Time Delay and out Flow Rej Cause : Set-up Verification Report (D=5) Operater Skill
Inadequate Operator Skill work are
Standard trolley Trolley changed Vehicle Mfr. : Out Flow rejection 4 2 Matrix Visual Display (D=8) FM : 100 % Visual 5 40
3.Operator skill matrix
End User : N.A Inspection at PDI stage (D=8)
FM : Nill
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Parts storage in Trolley 1.Wrong Parts storage in
1.Material Damage Vehicle Mfr. : N.A 8 NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition plastic Bins
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process : Nill
Cause : Will Provided Operator Training
Vehicle Mfr. :Vehicle operable but reduced level of Cause : Operator Self Inspection (D=7)
Specified Dimension Dimension Variation 7 1.Inadequate inspection skill FM 2 7 98
performance (S=7) FM :PDI Inspection Report (D=7)
: Nill
End User : Audible noise vehicle operable (S=4)
Next.Process : Nill
Cause : Will Provided Operator Training
Vehicle Mfr. :Vehicle operable but reduced level of Cause : Operator Self Inspection (D=7)
No Damage Damage 7 1.Inadequate inspection skill FM 2 7 98
performance (S=7) FM :PDI Visual Inspection Report (D=8)
: Nill
End User : Audible noise vehicle operable (S=4)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (800-1000) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause : Suitable Trolley Design during Cause :.Verification for Maintenance Report (D=5)
Trolley Condition./ Vehicle
1.Material Damage Vehicle Mfr. : N.A 8 1.Wrong Trolley Condition. NPD (Drawing) 2 FM : Internal 5S'Audite 5 80
Condition
End User : N.A FM : Nill (D=8)
Next.Process : Can not be Used for Next Process (S=8) Cause :Verification for Check sheet (D=5)
Iuminous level (400-600) Cause : Internal Audite
Inspection no done properly Vehicle Mfr. : N.A 8 1.Wrong Iuminous level 2 FM : Iuminous level Visual 5 80
lux. FM : Nill
End User : N.A Inspection (D=8)
NAME
and Effects Analysis
MEA)
HEIL / FMEA / TVS - N9092230
1 OF 18
V.Sivakarthikeyan
OCC
DET
Action(s) Completion Date Description of
SEV
actual taken
P
(specific date, N
not week)
Rm To Verified by
Bop 8 2 5 80
Third party Inspection
Certified Inspector /
Supplier end audit as BOP 6 2 3 36
per schedule
1.Reset the parameter
2.Monitoring of
Inprocess inspection
report
1.Reset the parameter
2.Monitoring of
Inprocess inspection
report
Supplier Plant: HEMA ENGG INDUSTRIES LTD-IV Supplier Code Other Approval / Date(if Reqd.) Other Approval / Date(if Reqd.) Customer information
N= 1
4 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill Every Month 2.Skill Matrix V.C.S Display Verified. Press Shop In charge Skill Matrix Evaluation _
C= 0
N= 1
Every Month 3. Training Attendance Register Available Check H.R Skill Matrix Evaluation _
C= 0
Raw material and child
N= 1 1.Gate entry /Material Receipt Register If any material discrepancy return back to
10 parts Receipt / Manual Every Batch Store Executive _
C= 0 ( MRR ) supplier
Inspection
MRR Register Entry. As per supplier Digital Weighing N= 1 If any material discrepancy return back to
5 _ Nill Nill Nill Every Batch 2. ERP Report Store Executive _
(Qty , Weight ) invoice Machine C= 0 supplier
N= 1
6 _ Receiving inspection Report Nill Nill As Per Drawing D.V.C /D.H.G Nill Every Lot 1.Verification for Internal Auditee Report M.R If Any Failure Internal Non Conformation _
C= 0
N= 1
Every Year 1. calibration report Lab In charge If Any Failure Re tun Back Laboratory _
Ball Micro Meter C= 0
7 _ Ball Micro Meter, Range: 0~25 mm , Nill Nill As Per Drawing Range 0-25 mm Nill
LC-0.01 mm N= 1
Every 6-Month 2.Verification for M.S.A Report Lab In charge If Any Failure Re tun Back Laboratory _
C= 0
N= 1
Calibration Plan 1. calibration report Lab In charge If Any Failure Re tun Back Laboratory _
Ball Micro Meter C= 0
8.00 _ Measurement Tap, Range: 0~5 meter, Nill Nill As Per Drawing Range 0-25 mm Nill
LC-0.01 mm N= 1
MSA-Contact 2.Verification for M.S.A Report Lab In charge If Any Failure Re tun Back Laboratory _
C= 0
As Per Customer N= 1
9 _ Hand Trolley Condition. Nill Nill Visual Nill Every Day 2.Trolley Visual Inspection Maintenance In charge If any Problem Re Auditee _
Requirement C= 0
N= 1
Every Month 3.Trolley Auditee 5s" Report Maintenance In charge If any Problem Re Auditee _
C= 0
N= 1
10 _ Iuminous level Nill Nill (800-1000) lux. Lux Metter Nill Every Day 2. Iuminous level Visual Inspection Maintenance In charge If Any Failure Replaced Light _
C= 0
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=1 1. Will Provided 3 C" and 5 S " Training Report
Every Month Store Executive Follow Min.& Max Qty for storage _
Storage as per C=0
20.01 Storing in specified Area _ Nill Nill inventory ,through Visual Nill
ERP N=1
Every Day 2. Verification for Check Sheet Store Executive Follow Min.& Max Qty for storage _
C=0
N=1
Every Day 1. Daily Monitoring Inventory Control Store Executive Follow Min.& Max Qty for storage _
C=0
N=1
Every Batch 3. Visual tactile Store Executive Follow Min.& Max Qty for storage _
C=0
N=1
Every Day 1. Daily Monitoring Inventory Control Store Executive Follow Min.& Max Qty for storage _
C=0
N=1
Every Batch 3. Visual tactile Store Executive Follow Min.& Max Qty for storage _
C=0
N= 1
20.04 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill Every Month 2.Skill Matrix V.C.S Display Verified. Press Shop In charge Skill Matrix Evaluation _
C= 0
N= 1
Every Month 3. Training Attendance Register Available H.R Skill Matrix Evaluation _
C= 0
As Per Customer N= 1
20.07 _ Hand Trolley Condition. Nill Nill Visual Nill Every Day 2.Trolley Visual Inspection Maintenance In charge If any Problem Re Auditee _
Requirement C= 0
N= 1
Every Month 3.Internal Auditee 5s" Report Maintenance In charge If any Problem Re Auditee _
C= 0
N= 1
20.08 _ Iuminous level Nill Nill ( 400-600 ) lux. Lux Metter Nill Every Day 2. Iuminous level Visual Inspection Maintenance In charge If Any Failure Replaced Light _
C= 0
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
Start of Each
As Per Customer N= 1
11 _ Parts storage in plastic Bins Nill Nill Visual Nill Shift Start of 1. Pallet Visual Inspection Shop In charge Operator Replaced Pallet _
Req C= 0
work after break
7 Burn Through _ Nill Nill Not Allowed Visual Nill N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
STAGE 1 -Robot N=3 Every Shift Start Inform to Supervisor Stop & Correct the
Welding Of Boss 1. Set-up Verification Quality In charge _
C=0 Process
+Swing arm LH &
RH + Brkt RR shock N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
absorber assembly C=0 Hours Process
40 8 Excess Welding - Nill Nill Not Allowed Visual Nill
LH&RH+ Brkt chain N=1 Start of Each Inform to Supervisor Stop & Correct the
case mtg front 3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
assembly +
Reinforcement swing N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
arm R & L C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
9 Incopleted Welding - Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N= 1
Every Month 3.SOP Display in Machine Area Available Check H.R Skill Matrix Evaluation _
C= 0
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
14 _ Gas Flow Nill Nill 20-25 LPM Gas Flow meter Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
1 Rear Width _ Nill Nill 200 + 2.0 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
2 Front width Nill Nill 127 + 0.70 + 0.30 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Weld Shop In charge _
Machine No : C=0 Shift Process
RWMC-01 N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
3 Weld Under cut _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
4 Blow Holes _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
5 Burn Through _ Nill Nill Not Allowed Visual Nill N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
6 Excess Welding - Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
STAGE 2 - Robot
Welding Of LH & RH N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
Tube assembly + C=0 Process
50
Gusset bridge L + N=5 Every One Inform to Supervisor Stop & Correct the
brige gusset +Bridge 2. In-process Inspection Quality In charge _
C=0 Hours Process
swing arm 7 In completed Welding - Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
Machine capacity: : 4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
SR(100-350)
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
13 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Month 3.SOP Display in Machine Area Available Check H.R Skill Matrix Evaluation _
C= 0
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
12 _ Gas Flow Nill Nill 20-25 LPM Gas Flow meter Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Ф24.00 + 0.02 - C=0 Hours Process
1 Bore ID _ Nill Nill DVC Nill
0.10 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Machine No : C=0 Hours Process
2 Boring line mark _ Nill Nill Not Allowed Visual Nill
BOMC-01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
4 Offset _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
5 Damage _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
STAGE 3 - Boss N=5 Every One Inform to Supervisor Stop & Correct the
60 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill 2. In-process Inspection Quality In charge _
Boring C=0 Hours Process
N=1 Start of Each 3.Operator Training Report Available Check
Shop In charge Recheck the Stroke . Readjust if required _
C=0 Shift
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
5 Boring tip chage frequency Nill Nill 1000 nos once Tool history card Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
1 Rear Width _ Nill Nill 200 + 2.0 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
Fixture No : 2. In-process Inspection Quality In charge _
C=0 Hours Process
SA/U180/A- 2 Front width _ Nill Nill 127 + 0.70 + 0.30 Range 0-600 mm Nill
FIX/R-04 LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
3 LH Tube C.off _ Nill Nill 103 + 0.50 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
4 RH Tube C.off _ Nill Nill 97 + 2.0 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
5 LH S/Abs Brkt C.Off _ Nill Nill 114.30 ± 1.20 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
6 RH S/Abs Brkt C.Off _ Nill Nill 109.30 ± 1.20 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
7 Symmetry _ Nill Nill ÷ 0.80 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
Fixture Name: 4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
Revising
Fixture N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
8 Front CC Brkt C.Off _ Nill Nill 100 ± 1.00 Range 0-600 mm Nill
LC-0.01
Fixture Name:
Revising
Fixture
Digital Height
Gauge
8 Front CC Brkt C.Off _ Nill Nill 100 ± 1.00 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
Front-Rear CC Brkt C=0 Hours Process
9 _ Nill Nill 10.30 ± 0.50 Range 0-600 mm Nill
C.Off N=1 Start of Each Inform to Supervisor Stop & Correct the
LC-0.01 3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
10 Bridge Tube C.D _ Nill Nill 125 ± 2.0 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
11 Front CC Brkt C.D _ Nill Nill 34.20 ± 0.50 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
12 Rear CC Brkt C.D _ Nill Nill 40.20 ± 0.50 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
LH & RH S/Abs Brkt C=0 Hours Process
13 _ Nill Nill 47.50 ± 1.20 Range 0-600 mm Nill
C.D N=1 Start of Each Inform to Supervisor Stop & Correct the
LC-0.01 3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
70 STAGE 4- Revising N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
S.Abs Brkt C=0 Hours Process
14 _ Nill Nill ┴ 1.00 mm Fero Nill
Perpendicularity N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
15 S.Abs Brkt Parelism _ Nill Nill Ф 0.5 Fero Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Rear CC Brkt C=0 Hours Process
16 _ Nill Nill ┴ 1.00 mm Fero Nill
Perpendicularity N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Front CC Brkt C=0 Hours Process
17 _ Nill Nill ┴ 1.00 mm Fero Nill
Perpendicularity N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
18 Front CC Brkt C.D _ Nill Nill 168 ± 0.80 Range 0-600 mm Nill
LC-0.01
mm
Digital Height
Gauge
18 Front CC Brkt C.D _ Nill Nill 168 ± 0.80 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
Front-Rear CC Brkt C=0 Hours Process
19 _ Nill Nill 350 ± 0.80 Range 0-600 mm Nill
C.D N=1 Start of Each Inform to Supervisor Stop & Correct the
LC-0.01 3.Preventive maintanence Shop In charge _
Manufacturing mm C=0 Shift Process
Location : TVS N=1 Start of Each Inform to Supervisor Stop & Correct the
Line - Welding 4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
Shop
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
C=0 Hours Process
20 LH/RH Slot C.D _ Nill Nill 488 ± 0.80 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height N=5 Every One Inform to Supervisor Stop & Correct the
Gauge 2. In-process Inspection Quality In charge _
LH & RH S/Abs Brkt C=0 Hours Process
21 _ Nill Nill 458.30 ± 1.00 Range 0-600 mm Nill
C.D N=1 Start of Each Inform to Supervisor Stop & Correct the
LC-0.01 3.Preventive maintanence Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
22 Dent mark _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Preventive maintanence Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
_ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
1 Fitting Inner Brkt C.Off _ Nill Nill 46.50 ± 1.20 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Digital Height Gauge N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
2 Fitting Inner Brkt C.D Nill Nill 103 ± 2.0 Range 0-600 mm Nill
LC-0.01 N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge
mm C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.Fixture Calibration Report Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
3 Front Clamp disc brake _ Nill Nill 166 ± 1.0 Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
4 Rear Clamp disc brake h _ Nill Nill 375 ± 1.0 Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
Fixture No : N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Front Clamp disc brake C=0 Hours Process
5 _ Nill Nill 84 ± 1.0 Visual Nill
SA/U180/FIX/WS/0 hose C.Off N=1 Start of Each Inform to Supervisor Stop & Correct the
5 3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Front Clamp disc brake C=0 Hours Process
6 _ Nill Nill 118 ± 1.0 Visual Nill
hose C.Off N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
7 Brake Anchor Height _ Nill Nill 9.3 ± 0.50 Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
8 Brake Anchor CD _ Nill Nill 436 ± 0.5 Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
9 Blow Holes _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
STAGE 5 - Manual C=0 Shift Process
Welding of Stage 3 + N=3 Every Shift Start Inform to Supervisor Stop & Correct the
Clamp Disc brake 1. Set-up Verification Quality In charge _
80 C=0 Process
hose(2 no's) +Guide
chain mtg + Brake N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
Anchor C=0 Hours Process
10 Excess Welding - Nill Nill Not Allowed Visual Nill N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
6 In completed Welding - Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
7 burn through - Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
Machine Name :
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
Manual mig C=0 Process
welding N=5 Every One Inform to Supervisor Stop & Correct the
13 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Month 3.SOP Display in Machine Area Available Check H.R Skill Matrix Evaluation _
C= 0
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
12 _ Gas Flow Nill Nill 12-25 LPM Gas Flow meter Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
1 Spatter _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
2 Chisel Mark _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
90 STAGE 6 -Chipping MANUAL
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
3 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
1 Spatter _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
2 weld under cut _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
3 Blow hole _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
STAGE 7 -Visual C=0 Shift Process
100 MANUAL
Inspection
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2. In-process Inspection Quality In charge _
C=0 Hours Process
4 Incomplete welding _ Nill Nill Not Allowed Visual Nill
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Shift Start 1.Set-up Verification Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
5 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill C=0 Hours
2. In-process Inspection Quality In charge
Process
_
Start of Each
As Per Customer N= 1
6 _ Parts storage in Trolley Condition Nill Nill Visual Nill C= 0
Shift Start of 1. Pallet Visual Inspection Weld Shop In charge Replaced Pallet _
Req work after break
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3
Every Shift Start 1.Set-up Verification Quality In charge
C=0
N=1
Every Weeks 3.Operator Training Report Available Check H.R Replaced Pallet _
C=0
N= 1
Every Year 1. calibration report Lab In charge If Any Failure Re tun Back Laboratory
C= 0
_ Thread Plug gauge Nill Nill As Per Drawing Thread Plug gauge Nill
N= 1
Every 6-Month 2.Verification for M.S.A Report Lab In charge If Any Failure Re tun Back Laboratory
C= 0
Start of Each
As Per Customer N= 1 Press Shop In charge
_ Parts storage in Trolley Condition Nill Nill Visual Nill
C= 0
Shift Start of 1. plastic Bins Visual Inspection
Operator
Replaced plastic Bins
Req work after break
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
10 Damage - Nill Nill Not Allowed Visual Nill N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Operator Training Report Available Check Weld Shop In charge _
C=0 Shift Process
Manual N=1 Start of Each Inform to Supervisor Stop & Correct the
4.SOP Display in machine Area Available Check Weld Shop In charge _
C=0 Shift Process
Start of Each
As Per Customer N= 1
_ Parts storage in Trolley Condition Nill Nill Visual Nill C= 0
Shift Start of 1. Pallet Visual Inspection Weld Shop In charge Replaced Pallet _
Req work after break
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
90.14 Dent _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
90.15 Damage _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
90.15 Part Missing _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
90.15 Powder coating uncoverage _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
150 Final Visual inspection Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
90.15 Powder coating peel off _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N= 1
Every Month 1.Skill Matrix Report Available H.R Skill Matrix Evaluation _
C= 0
N= 1
90.16 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill Every Month 2.Skill Matrix V.C.S Display Verified. Press Shop In charge Skill Matrix Evaluation _
C= 0
N= 1
Every Month 3. Training Attendance Register Available Check H.R Skill Matrix Evaluation _
C= 0
Start of Each
As Per Customer N= 1 Press Shop In charge
90.19 _ Parts storage in trolley condition Nill Nill Visual Nill Shift Start of 1. plastic Bins Visual Inspection Replaced plastic Bins _
Req C= 0 Operator
work after break
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Every Shift Start Inform to Supervisor Stop & Correct the
1. Set-up Verification Quality In charge _
C=0 Process
N=1 Start of Each 3.Operator Training Report Available Check
1 Standard Trolley - Nill Nill std Visual Nill C=0 Shift
Weld Shop In charge Recheck the Stroke . Readjust if required _
N= 1
Every Month 3. Training Attendance Register Available Check H.R Skill Matrix Evaluation _
C= 0
N=1
4 _ Operator Self Inspection , 100% of Visual Inspection Nill Nill As Per Drawing D.V.C /D.H.G Nill
C=0
Every Lot 1.Verification for Internal Auditee Report M.R If Any Failure Internal Non Conformation
Start of Each
As Per Customer N= 1 Press Shop In charge
5 _ Parts storage in trolley condition Nill Nill
Req
Visual Nill
C= 0
Shift Start of 1. plastic Bins Visual Inspection
Operator
Replaced plastic Bins _
work after break
N= 1 1.Verification for Check sheet
Every Day Maintenance In charge If Any Failure Replaced Light _
C= 0
6 _ Iuminous level (800-1000) lux. Nill Nill (800-1000) lux. Lux Metter Nill N= 1
Every Day 2. Iuminous level Visual Inspection Maintenance In charge If Any Failure Replaced Light _
C= 0
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
1.00 Specified Dimension _ Nill Nill As per Drawing DHG Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
2.00 Dent _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
3.00 Damage _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N=3 Inform to Supervisor Stop & Correct the
Every Setting 1.Operator Self Inspection Quality In charge _
C=0 Process
N=5 Every One Inform to Supervisor Stop & Correct the
4.00 OperationMissing _ Nill Nill Not Allowed Visual Nill 2.100% Visual Inspection Report Quality In charge _
C=0 Hours Process
170 Dock audit
N=1 Start of Each Inform to Supervisor Stop & Correct the
3.Inspector Training Report Available Check Press Shop In charge _
C=0 Shift Process
N= 1
Every Month 1.Skill Matrix Report Available H.R Skill Matrix Evaluation _
C= 0
N= 1
5 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill Every Month 2.Skill Matrix V.C.S Display Verified. Press Shop In charge Skill Matrix Evaluation _
C= 0
N= 1
Every Month 3. Training Attendance Register Available Check H.R Skill Matrix Evaluation _
C= 0
N= 1
3 _ Operator Skill Matrix Min.- (L-3) Complete Nill Nill Min L-3 Complete Visual Nill
C= 0
Every Month 2.Skill Matrix V.C.S Display Verified. Press Shop In charge Skill Matrix Evaluation _
N= 1
Every Month 3. Training Attendance Register Available Check H.R Skill Matrix Evaluation _
C= 0
180 Move to Dispatch Area Manual
As Per Customer N= 1
4 _ Trolley Condition / Vehicle Condition Nill Nill Visual Nill Every lot As Per hema Invoice Qty Dispatch - In charge _ _
Schedule C= 0
N= 1
6 _ Iuminous level (800-1000) lux. Nill Nill (800-1000) lux. Lux Metter Nill
C= 0
Every Day 2. Iuminous level Visual Inspection Maintenance In charge If Any Failure Replaced Light _
N= 1
Every Weeks 3.Internal Auditee Report Maintenance In charge If Any Failure Replaced Light _
C= 0
6
N = No. of samples to be checked,
C = No. of defectives permitted in the samples checked.
5 1.Set up Approval - * Start of shift,
2.Set up Approval - # Start up After Lunch Break )
4
3
Note: Reaction Plan: Whenever the Process Parameters or Product Characteristics are found non-conforming, quarantine the pieces produced after,the last product characteristic check, identify with Yellow Co lour label and re-inspect 100%.
Remove Non-conforming products and identify with Red,Color Tag. Make entry in Production Log Book and inform Chargehand and Supervisor.
2
1
PREPARED BY : V.SIVAKARTHIKEYAN APPROVED BY : MR.Velayutham DATE:04.08.2016
S.No. DESCRIPTION OF REVISION CARRIED OUT DATE Prepared Approved
LAYOUT INSPECTION REPORT
DATE:
PART NO: DESCRIPTION: Latest issue 25.07.2016
CENTER DISTANCE LH 488 ± 0.8 487.2 488.8 FARO 487.87 487.92 488.01 487.54 48 439.2 0 Not OK
1
CENTER DISTANCE RH 488 ± 0.8 487.2 488.8 FARO 487.84 487.81 487.23 488.14 487.43 0 0 OK
2 PARALLALISM //│ 0.8│A-B 0.8 0.8 0 0.8 FARO 0.53 0.68 0.75 0.79 0.44 0 0 OK
3 DIMENSION 103 ±2 101 105 FARO 102.94 102.71 102.67 102.71 102.84 0 0 OK
4 CENTER DISTANCE 168 ± 0.8 167.2 168.8 FARO 167.9 167.89 168.65 168.19 167.67 0 0 OK
CENTER DISTANCE LH 458.3 ±1 457.3 459.3 FARO 457.1 456.96 457.27 457.57 456.94 0.36 0 Not OK
5
CENTER DISTANCE RH 458.3 ±1 457.3 459.3 FARO 457.55 458.07 457.01 458.84 457.33 0.29 0 Not OK
6 CENTER DISTANCE 350 ± 0.8 349.2 350.8 FARO 350.03 350.16 349.78 349.34 350.32 0 0 OK
7 CENTER DISTANCE 34.2 ± 0.5 33.7 34.7 FARO 34.12 34.44 34.25 33.83 33.99 0 0 OK
CENTER DISTANCE LH 47.5 ± 1.2 46.3 48.7 FARO 47.06 47.59 47.64 47.76 47.02 0 0 OK
8
CENTER DISTANCE RH 47.5 ± 1.2 46.3 48.7 FARO 46.6 46.98 47.27 46.91 46.31 0 0 OK
9 SLOT WIDTH 15.5 ± 0.5 15 16 DVC 15.63 15.62 15.69 15.64 15.67 0 0 OK
10 SYMMETRY 0.8 C 0.8 0.8 0 0.8 FARO 0.99 1.01 0.12 0.98 0.12 0 0.21 Not OK
11 CENTER DISTANCE 40.2 ± 0.5 39.7 40.7 FARO 40.02 40.16 40.05 39.84 40.03 0 0 OK
12 SLOT WIDTH 19.3 ± 0.5 18.8 19.8 DVC 19.59 19.56 19.54 19.58 19.53 0 0 OK
13 SLOT RADIUS 10.55 +0.8 10.55 11.35 FARO 10.64 10.69 10.57 10.68 10.61 0 0 OK
14 SLOT RADIUS 7.75 +0.8 7.75 8.55 FARO 7.81 7.79 7.84 7.79 7.82 0 0 OK
15 DIMENSION 100 ±1 99 101 FARO 101.23 100.79 100.19 101.43 101.22 0 0.43 Not OK
16a DIMENSION 46.5 ± 1.2 45.3 47.7 FARO 48.39 46.42 47.72 47.4 48.03 0 0.69 Not OK
17 DIMENSION 125 ±2 123 127 FARO 124.71 124.77 124.67 124.64 124.35 0 0 OK
20 DIMENSION 41 ± 0.2 40.8 41.2 DVC 41.04 41.03 41.08 41.05 41.03 0 0 OK
21 CONCENTRICITY 0.1 0.1 0 0.1 FARO 0.13 0.31 0.25 0.32 0.28 0 0.22 Not OK
22 FRONT BUSH WIDTH 127 +0.7/+0.3 127.3 127.7 FARO 126.61 126.83 126.65 126.93 127.11 0.69 0 Not OK
23 CYLINDERCITY 0.1 0.1 0 0.1 FARO 0.09 0.13 0.11 0.08 0.12 0 0.03 Not OK
Page 68 of 132
INSPECTIO
SL. N METHOD ACTUAL OBSERVED
SPECIFICA TOLERAN Deviation Deviation
PARAMETER LSL USL REMARKS
NO. TION CE / TOOL / (-) (+)
1 2 3 4 5
INSTRU
+0.02 /
24 BORE DIA 24 23.9 24.02 FARO 23.98 24.01 23.99 23.98 23.98 0 0 OK
-0.1
26 DIMENSION 166 ±1 165 167 FARO 165.38 165.42 164.93 165.58 165.26 0.07 0 Not OK
27 DIMENSION 290 ± 3.2 286.8 293.2 FARO 291.06 290.89 291.23 291.46 291.12 0 0 OK
28 DIMENSION 375 ±1 374 376 FARO 373.82 374.58 373.26 374.82 374.49 0.74 0 Not OK
29 DIMENSION 436 ± 0.5 435.5 436.5 FARO 436.06 436.03 434.97 434.71 435.25 0.79 0 Not OK
30 DIMENSION 76.3 +1.2 75.1 77.5 FARO 78.47 78.12 78.32 77.89 78.42 0 0.97 Not OK
31 BKT SHCK ABS PERPENDICULARITY RH 1/A 1 1 0 1 FARO 0.98 0.4 0.79 0.98 0.96 0 0 OK
32 DIMENSION 9.3 ± 0.5 8.8 9.8 FARO 9.94 9.82 10.17 9.99 9.93 0 0.37 Not OK
33 SWING ARM PERPENDICULARITY RH 1/A 1 1 0 1 FARO 1.67 0.49 1.33 1.23 1.38 0 0.67 Not OK
34 REAR WIDTH 200 +2 200 202 FARO 201.66 201.39 200.75 202.38 201.58 0 0.38 Not OK
35 REAR WIDTH CENTER OFFSET 103 +0.5 103 103.5 FARO 103.81 104.85 102.65 104.28 104.18 0.35 1.35 Not OK
36 DIMENSION 10.3 ± 0.5 9.8 10.8 FARO 10.73 10.79 9.96 10.8 9.86 0 0 OK
37 SWING ARM PERPENDICULARITY LH 1/A 1 1 0 1 FARO 0.27 0.44 0.74 0.54 0.26 0 0 OK
38 BKT SHCK ABS PERPENDICULARITY LH 1/A 1 1 0 1 FARO 0.98 0.41 0.76 0.25 0.71 0 0 OK
40 DIMENSION LH 114.3 ± 1.20 113.1 115.5 FARO 116.88 116.22 114.21 115.1 116.98 0 1.48 Not OK
41 DIMENSION RH 109.3 ± 1.20 108.1 110.5 FARO 110.3 109.52 112.37 110.73 110.15 0 1.87 Not OK
42 SHOCK ABS BKT PARALLALISM //│ 0.5│A-B 0.5 0.5 0 0.5 FARO 0.71 0.25 0.49 0.35 0.68 0 0.21 Not OK
43 DIMENSION 84 ±1 83 85 FARO 82.71 82.57 83.78 85.46 83.72 0.43 0.46 Not OK
44 DIMENSION 118 ±1 117 119 FARO 117.19 116.13 117.62 119.35 117.64 0.87 0.35 Not OK
45 DIMENSION 8 ± 0.5 7.5 8.5 FARO 8.13 8.21 8.29 8.22 8.31 0 0 OK
46 PARALLALISM //│ 0.3│E 0.3 0.3 0 0.3 FARO 0.45 0.51 0.38 0.42 0.36 0 0.21 Not OK
47 DIMENSION 1.5 ± 0.4 1.1 1.9 FARO 1.15 1.23 1.12 1.17 1.13 0 0 OK
+0.7/
48 FRONT BUSH WIDTH 124 124.3 124.7 FARO 124.65 124.56 124.67 124.61 124.58 0 0 OK
+0.3
Page 69 of 132
Summary of Initial Process Studies
Part Name: Part No. & Rev:
3 Detection pokayoke in the subsequent station/s Fit / Finish - Critical (Severity - 7 & 8)
5 100% inspection
* Target Actual
Remarks
Ppk / Cpk Ppk / Cpk
1.33 1.83/1.65
Non Geometrical
Geometrical Dimensions
Dimensions
1.67 1.33
1.67 1.33
1.33 1.00
Supplier Name & Address: VARIABLE GAUGE REPEATABILITY & REPRODUCIBILITY REPORT
M/S TVS MOTOR COMPANY LTD
Make entries only in green colour boxes. Other boxes protected.
Department : WELD SHOP
Location Code : DATE: 10.03.2016
Part No. : XXXXXXX Requirements:
Part Name, Dimension : SWING ARM No. of Samples = 10
Specification & Tolerance : 40.2±0.5 No. of Appraisers = 3
Gauge No. : No. of Trials = 3
Gauge Description : DIGITAL HEIGHT GAUGE
1 40.34 40.15 40.24 40.35 40.18 40.11 40.26 40.20 40.42 40.46 402.71 40.27
Mr. Venkatesh 2 40.32 40.16 40.23 40.36 40.17 40.11 40.25 40.21 40.41 40.45 402.67 40.27
3 40.32 40.17 40.23 40.35 40.19 40.12 40.24 40.21 40.41 40.45 402.69 40.27
Avg X1 40.33 40.16 40.23 40.35 40.18 40.11 40.25 40.21 40.41 40.45 402.69 40.27
Range R1 0.02 0.02 0.01 0.01 0.02 0.01 0.02 0.01 0.01 0.01 0.14 0.01
1 40.35 40.16 40.22 40.36 40.17 40.10 40.24 40.19 40.41 40.45 402.65 40.27
Mr. Basha 2 40.34 40.16 40.24 40.36 40.18 40.11 40.25 40.19 40.41 40.45 402.69 40.27
3 40.34 40.15 40.23 40.35 40.18 40.12 40.25 40.20 40.42 40.47 402.71 40.27
Avg X2 40.34 40.16 40.23 40.36 40.18 40.11 40.25 40.19 40.41 40.46 402.68 40.27
Range R2 0.01 0.01 0.02 0.01 0.01 0.02 0.01 0.01 0.01 0.02 0.13 0.01
1 40.32 40.15 40.23 40.36 40.16 40.09 40.25 40.20 40.40 40.28 402.44 40.24
Mr.Thyagaraja 2 40.33 40.16 40.24 40.35 40.17 40.11 40.25 40.21 40.42 40.25 402.49 40.25
3 40.34 40.17 40.22 40.37 40.15 40.12 40.26 40.21 40.41 40.21 402.46 40.25
Avg X3 40.33 40.16 40.23 40.36 40.16 40.11 40.25 40.21 40.41 40.25 402.46 40.25
Range R3 0.02 0.02 0.02 0.02 0.02 0.03 0.01 0.01 0.02 0.07 0.24 0.02
Part Average Xp 40.33 40.16 40.21 40.36 40.17 40.11 40.25 40.20 40.41 40.39 402.61 40.26
Range of Part Avg. 0.30
MEASUREMENT UNIT ANALYSIS % OF TOTAL VARIATION
Part Variation (PV) (Rp x K3) : 0.4896 K3 (for 10 parts) : 1.62 % PV = 98.70 %
Acceptance Criteria - Type 1 Error (Rejecting a good part) - not more than 3% for each appraiser
Type 2 Error (Accepting a bad part) - Zero for each appraiser
For results not meeting the acceptance criteria - Retrain the assessors and re-do the R&R study
Before measurement ensure the following conditions :
I 1. Select the components from different batch / Lot / Shift
2. Ensure the following mix of good & bad parts -
Good parts - 35 nos (including 8 marginally good parts - close to USL / LSL)
Bad parts - 15 nos (Including 8 marginally bad parts - close to USL / LSL)
II 1.Don't change the place of the component.
2.Don't change the method
3.Don't change the gauge.
Name of Assessor - A Name of Assessor - B Name of Assessor - C
Suganth Manickam Abhilash
AME
bute type) Study
14.04.2016
SWING ARM
Hosur
Assessor C : Original Part
TRIAL 2 Dimension Remarks
G / NG and Status
G G
G G
G G
G G
G G
NG NG
G G
G G
G G
NG NG
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
NG NG
G G
G G
G G
NG NG
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
NG NG
G G
G G
G G
G G
G G
G G
G G
G - GOOD
4 4
_ _ NG - NOT GOOD
to USL / LSL)
USL / LSL)
Checked by : Approved by :
Venkatesan.R Venkatesan.R
Product Weight Details
Weight in Grams
Part Sr No.
(upto 4 decimels)
10
Total
Prepared by
Checked by
Approved by
ht Details
Remarks
Date : xxxx
Date : xxxxx
Date : xxxxx
SUPPLIER NAME
PART NAME : Swing Arm Sub Assy
PART NO : XXXXX
Equipment
S. NO DESCRIPTION CALIBRATION FREQ.
capacity
1 DHG 0~600 mm 12.11.2015 ~ 11.11.2016
DIGITAL VERNIER
2 0~300 mm 12.11.2015 ~ 11.11.2016
CALIPER
3 BEVEL 0~360° 12.11.2015 ~ 11.11.2016
EXTERNAL
4 0~25 mm 12.11.2015 ~ 11.11.2016
MICROMETER
FINAL ACCEPTANCE
5 STD Once per year
GAUGE
Part Name: SWING ARM U180 Drawing No. N9092230 PFD Initial Date: PFD Rev. No. 1
Process Process Description Symbol Equipment No., Incoming Product Process Characteristics
Step / Fixture No., Tool No., Sources of Characteristics to be to be controlled to
Operation and Manufacturing Variation achieved in each achieve the complete set
No. Location process/operation step of product
characteristics
Dimension
RECEIVING
variation, bend, Free from Rust, excess 1)Recieving inspection as
10 MATERIAL Manual
twist, rust, dent, oil, dent, weld defects per RIP -
INSPECTION
crack, da,mage
20
Excess oil, dust, Improper loading not
20 LOADING MANUAL 1)Use of Dedicated jigs
grease allowed
1) No contamination (1.5-2
60 ML Max/Liter)
Alkaline solution Cleaning of alkaline 2) Pressure (0.8 -1.2KG/
SPRAY,RISER &
60 WATER RINSE-1
NOZZLE
on the part to be Solution on CM2)
cleaning component 3) process time 60 Sec
4) frequency of cleaning
Bath (Once in a week)
1) No contamination (1.5-2
ML Max/Liter)
70 Alkaline solution Cleaning of alkaline 2) Pressure (0.8 -1.2KG/
SPRAY,RISER &
70 WATER RINSE-2
NOZZLE
on the part to be Solution on CM2)
3) process time 60 Sec
NOZZLE
cleaning component 3) process time 60 Sec
4) frequency of cleaning
Bath (Once in a week)
1) CHEMICAL
CONCENTRATION (6-
80 No Water 9ML/Liter)
SURFACE SPRAY,RISER & Proper activation of the 2) PH LEVEL (8.0-9.5)
80
ACTIVATION NOZZLE
brakeup on the surface. 3) SPRY PRESSURE
Parts to be found (0.8-1.2 KG/
CM2),4)PROCESS TIME
60 Sec
90 1) CONCENTRATION (18-22ML/
Liter) GRANODINE 952 A/E
2) FREE ACID
CONCENTRATION (0.8-1.2ML)
Parts Should be Complete phosphating 3) TONER VALUE GRANO
SPRAY,RISER &
90 PHOSPHATING
NOZZLE
Completly of the parts, no TONER 130 (2-4ML)
operation skip 4) TEMPERATURE (48-52 Dec)
surface active 5) PRESSURE (0.8-1.2 KG/CM2)
6) TIME (180 Sec)
7) FREQUENCY OF CLEANING
(Once in a week)
1) PH LEVEL in DM Water
100 Complete rinsing of the (6.5-7.2)
Proper and 2) ACIDITY LEVEL (1.5-
SPRAY,RISER & components, no
100 DM RINSE I Uniform 2.0ML Max/ Liter)
NOZZLE checmical sludge on the 3) PROCESS TIME (60 sec)
Phospating coating
Part 4) FREQUENCY OF
CLEANING (once in a week)
1) PH LEVEL in DM Water
110 Complete rinsing of the (6.5-7.2)
Proper and 2) ACIDITY LEVEL (1.5-
SPRAY,RISER & components, no
110 DM RINSE II Uniform 2.0ML Max/ Liter)
NOZZLE checmical sludge on the 3) PROCESS TIME (60 sec)
Phospating coating
Part 4) FREQUENCY OF
CLEANING (once in a week)
1) PH LEVEL in DM Water
120 (6.5-7.2)
Proper and Complete rinsing of the 2) ACIDITY LEVEL (1.5-
SPRAY,RISER &
120 DM RINSE III Uniform components, No Yellow 2.0ML Max/ Liter)
NOZZLE 3) PROCESS TIME (60 sec)
Phospating coating stains on the Part
4) FREQUENCY OF
CLEANING (once in a week)
Parts to be
Uniform 1)Oven Temperature 150
140 Parts to be Dry from
140 DRY OFF OVEN OVEN phospating Rinse water
+ 10 deg 2) Process
coating to be Time 15 Min
done.
Components to be
1) Skilled Operator
After curing the unloaded in dedicated
2) Use of Dedicated
UNLOADING & ` trolleys and free from
190
FINAL INSPECTION 190
Manual Components to Uncover, Dust, Over
Trollys
be cooled naturlly 3) DFT (dry film thick) Min
flow, pin hole, oozeout
45 Microns
etc.,
Revision History
Rev. No. Date: Details of Revision
Transportation
Symbols: Operation :- 10 Operation + Inspection :- 10 Storage Inspection :-
Potential Failure mode and effects Analysis
(Process FMEA)
Item / Process Potential Failure Mode Potential Effect(s) of Failure Potential cause(s) / Current Design Controls / Current Process Current Design Controls / Current Process Recommended Action(s) Responsibility Action Results
Occurrence
Process Function Requirement / Deliverable Mechanism(s) of Failure controls - Prevention for Causes and / or for controls - Detection for Causes and / or for & Target Actions Taken
Detection
Occurrence
Detection
Severity
Failure Modes Failure Modes / Effects Completion
Class
Severity
RPN
Date
RPN
Operation no. 10 Cause: Inspection Report
Cause: Proper Training to operator SUPPLIER AUDIT DONE AND AWARENESS
1.RUST Free 1.RUST PROBLEM IN SUBSEQUENT IF THE PROBLEM CONTINUES DO
1. IMPROPER INSPECTION BOP QUALITY GIVEN TO THE SUPPLIER ABOUT THE
60
48
6
4
RECEIVING MATERIAL 2.No EXCESS OIL, DIRT 2.EXCESS OIL, DIRT OPERATIONS AUDIT AT SUPPLIER END
INSPECTION FM :Nil ISSUES
FM/EFCT:
Cause: SKILL MATRIX IMPLIMENT EMPLOYEE TRIANING
1. LOADING OF RUSTY OR Cause: OPERATOR TO BE EDUCATED
1. NO PEEL OFF AFTER POWDER 1. PEEL OFF AFTER POWDER CUSTOMER DISSATISFACTION / PROPER TRAINING GIVEN TO THE
EXCESS OILY SURFACED SUPERVISOR
64
40
4
5
COATING COATING AESTHETIC ISSUES OPERATOR REGARDING THE PROCESS
COMPONENTS FM :Nil
FM/EFCT: VISUAL
80
50
5
5
ALLOWED USING JIGS OF OTHER PARTS OPERATOR REGARDING THE PROCESS
FM :Nil
LOADING FM/EFCT:
Cause: VISUAL
Cause: OPERATOR TO BE EDUCATED &
1.IMPLIMENT EMPLOYEE TRAINING
3.NO UNCOVERAGE AFTER 3. UNCOVERAGE AFTER POOR CORROSION RESISTANCE LEADS 1. LOADING OF COMPONENTS DECOATING OF JIGS TO BE DONE 1.EMPLOYEE TRAINING IMPLEMENTED
2. JIG BURNING SCHEDULE TO BE SUPERVISOR
96
48
6
4
POWDER COATING POWDER COATING TO RUST FORMATION IN FIELD IN DAMAGED JIGS 2. JIG BURNING DONE AS PER SCHEDULE
ADHERED
FM :Nil
FM/EFCT:
Cause: VISUAL
Cause: PROPER SPRAY PRESSURE [0.8 - 1.2
Kg/Cm2] PRESSURE GAUGE CALIBRATION TO
1. IMPROPER CLEANING OPERATOR
96
30
8
5
BE DONE & ADHERE CHECK LIST PRESSURE GAUGE CALLIBRATION DONE
FM :Nil AS PER SCHEDULE AND REPORT
FM/EFCT: MAINTAINED
Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
2. LOW CHEMICAL ANALYSING AT LAB LAB IN
CHECK ONCE IN SHIFT & RECORD
60
48
5
4
CONCENTRATION CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: VISUAL
Cause: HEAT EXCHANGERS CLEANING TO
3. VARIATION IN TEMPERATURE
1.COMPLETE CLEANING BE DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
Operation no. 30 1. COATING PEEL OFF LEADS TO RUST FORMATION DUE TO HEAT EXCHANGERS OPERATOR
96
30
6
5
2.NO EXCESS OIL SCHEDULE TO BE ADHERE SCHEDULE
PROBLEMS
FM :Nil
FM/EFCT:
60
30
5
5
DEGREASING [KOD] CONTAMINATION USING PURE CHEMICALS CHARGE PERFORMING THE REQUIRED TEST AND
FM :Nil FM/EFCT: MAINTAINING THE REPORT
Cause: VISUAL
Cause: PREVENTIVE MAINTAINENCE TO BE
DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
5. EQUIPMENT BREAK DOWN OPERATOR
96
30
8
5
SCHEDULE TO BE ADHERE SCHEDULE
FM :Nil
FM/EFCT:
80
40
5
4
SOLUTION SCHEDULE TO BE ADHERE SCHEDULE
COATING SPOT PEEL OFF LEADS TO
FM :Nil
SPOT RUST FM/EFCT:
Cause: VISUAL
Cause: PROPER SPRAY PRESSURE [0.8 - 1.2
Kg/Cm2] PRESSURE GAUGE CALIBRATION TO
1. IMPROPER CLEANING OPERATOR
48
24
8
4
BE DONE & ADHERE CHECK LIST
FM :Nil GAUGE CALIBRATED AND REPORTS
FM/EFCT: MAINTAINED
Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
2. LOW CHEMICAL ANALYSING AT LAB LAB IN
CHECK ONCE IN SHIFT & RECORD
60
30
5
5
CONCENTRATION CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: VISUAL
Cause: HEAT EXCHANGERS CLEANING TO
3. VARIATION IN TEMPERATURE
BE DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION DUE TO HEAT EXCHANGERS OPERATOR
96
60
6
5
Operation no. 40 SCHEDULE TO BE ADHERE SCHEDULE
PROBLEMS
FM :Nil
FM/EFCT:
60
30
DEGREASING STAGE-1 (ADA)
5
CONTAMINATION USING PURE CHEMICALS CHARGE PERFORMING THE REQUIRED TEST AND
FM :Nil FM/EFCT: MAINTAINING THE REPORT
Cause: VISUAL
Cause: PREVENTIVE MAINTAINENCE TO BE
DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
5. EQUIPMENT BREAK DOWN OPERATOR
96
30
8
5
SCHEDULE TO BE ADHERE SCHEDULE
FM :Nil
FM/EFCT:
Cause: VISUAL
Cause: PREVENTINE MAINTAINENCE TO BE
ROUGH SURFACE AESTHETIC
1. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
2. NO DUST DUST PROBLEM & COATING SPOT PEEL OFF OPERATOR
80
40
5
4
SOLUTION SCHEDULE TO BE ADHERE SCHEDULE
LEADS TO SPOT RUST
FM :Nil
FM/EFCT:
Cause: VISUAL
Cause: PROPER SPRAY PRESSURE [0.8 - 1.2
Kg/Cm2] PRESSURE GAUGE CALIBRATION TO
1. IMPROPER CLEANING OPERATOR
48
24
8
4
BE DONE & ADHERE CHECK LIST
FM :Nil GAUGE CALIBRATED AND REPORTS
FM/EFCT: MAINTAINED
Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
2. LOW CHEMICAL ANALYSING AT LAB LAB IN
CHECK ONCE IN SHIFT & RECORD
60
30
5
5
CONCENTRATION CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: VISUAL
Cause: HEAT EXCHANGERS CLEANING TO
3. VARIATION IN TEMPERATURE
BE DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION DUE TO HEAT EXCHANGERS OPERATOR
96
30
6
5
Operation no.50 SCHEDULE TO BE ADHERE SCHEDULE
PROBLEMS
FM :Nil
FM/EFCT:
30
DEGREASING STAGE-2
5
5
CONTAMINATION USING PURE CHEMICALS CHARGE PERFORMING THE REQUIRED TEST AND
FM :Nil FM/EFCT: MAINTAINING THE REPORT
DEGREASING STAGE-2
Cause: VISUAL
Cause: PREVENTIVE MAINTAINENCE TO BE
DONE PREVENTIVE MAINTENANCE PREVENTIVE MAINTAINANCE DONE AS PER
5. EQUIPMENT BREAK DOWN OPERATOR
96
30
8
5
SCHEDULE TO BE ADHERE SCHEDULE
FM :Nil
FM/EFCT:
Cause: VISUAL
Cause: PREVENTINE MAINTAINENCE TO BE
ROUGH SURFACE AESTHETIC
1. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
120
2. NO DUST DUST PROBLEM & COATING SPOT PEEL OFF OPERATOR
40
5
4
SOLUTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
LEADS TO SPOT RUST
FM :Nil
FM/EFCT:
48
24
8
4
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
FM :Nil FM/EFCT: MAINTAINED
Cause: MAINTAIN THE CONCENTRATION BY
Cause: ANALYSIS REPORT
ANALYSING AT LAB & OVER FLOW OF
2. HIGH CONCENTRATION LAB IN
SOLUTION CONTINOUSLY CHECK ONCE IN SHIFT & RECORD
60
30
5
5
LEVEL CHARGE
Operation no.60 FM/EFCT: INSPECTION DONE AND RECORD
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION FM :Nil MAINTAINED AS SCHEDULED
2
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
3. POOR BATH MAINTANENCE OPERATOR
96
60
8
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
WATER RINSE I Cause: MONITORING THE PH FOR EVERY Cause: ANALYSIS REPORT
SERVICING OF WATER PLANT FOR
SHIFT LAB IN
4. PH ABOVE THE NORMS EVERY 1 YEAR & CHECK THE PH OF SERVICING MADE AS SCHEDULED
60
30
5
5
CHARGE
SOLUTION EVERY SHIFT & RECORD
FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
ROUGH SURFACE AESTHETIC
1. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. NO DUST DUST PROBLEM & COATING SPOT PEEL OFF OPERATOR
96
32
4
4
SOLUTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
LEADS TO SPOT RUST
FM :Nil FM/EFCT:
Cause: PROPER SPRAY PRESSURE AS PER Cause: VISUAL
NORMS PRESSURE GAUGE CALIBRATION
1. IMPROPER CLEANING OPERATOR
48
24
8
4
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
FM :Nil FM/EFCT: MAINTAINED
Cause: MAINTAIN THE CONCENTRATION BY
Cause: ANALYSIS REPORT
ANALYSING AT LAB & OVER FLOW OF
2. HIGH CONCENTRATION LAB IN
SOLUTION CONTINOUSLY CHECK ONCE IN SHIFT & RECORD
30
Operation no.70
5
LEVEL CHARGE
FM/EFCT: INSPECTION DONE AND RECORD
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION FM :Nil MAINTAINED AS SCHEDULED
2
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
3. POOR BATH MAINTANENCE OPERATOR
60
8
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
Cause: MONITORING THE PH FOR EVERY Cause: ANALYSIS REPORT
WATER RINSE II SERVICING OF WATER PLANT FOR
SHIFT LAB IN
4. PH ABOVE THE NORMS EVERY 1 YEAR & CHECK THE PH OF SERVICING MADE AS SCHEDULED
30
5
5
CHARGE
SOLUTION EVERY SHIFT & RECORD
FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
ROUGH SURFACE AESTHETIC
1. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. NO DUST DUST PROBLEM & COATING SPOT PEEL OFF OPERATOR
96
32
4
4
SOLUTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
LEADS TO SPOT RUST
FM :Nil FM/EFCT:
Operation no.80 Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1. POOR BATH MAINTANENCE OPERATOR
96
24
8
4
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
ACTIVATION 2. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
OPERATOR
96
60
8
5
SOLUTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
1. NO COATING PEEL OFF COATING PEEL OFF 1. LEADS TO RUST FORMATION
6
2
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
3. EQUIPMENT BREAK DOWN OPERATOR
96
60
8
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
4. LOW CHEMICAL ANALYSING AT LAB
CHECK ONCE IN SHIFT & RECORD LAB
60
30
5
5
CONCENTRATION INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Operation no.90 Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
1. LOW CHEMICAL ANALYSING AT LAB
CHECK ONCE IN SHIFT & RECORD LAB
60
24
5
4
CONCENTRATION INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: HEAT EXCHANGERS CLEANING TO Cause: VISUAL
2. VRIATION IN TEMPERATURE
BE DONE PREVENTIVE MAINTENANCE PREVENTIVE
DUE TO HEAT EXCHANGERS OPERATOR
96
60
8
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
PROBLEMS
FM :Nil FM/EFCT:
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION
6
2
Cause: ANALYSING AT SUPPLIER END & Cause: ANALYSIS REPORT
PHOSPHATING 3. BATH SOLUTION FRESH PREPERATION CONFIRM WITH TEST REPORT &
LAB
60
30
5
5
CONTAMINATION USING PURE CHEMICALS PERFORMING THE REQUIRED TEST AND
FM :Nil FM/EFCT: MAINTAINING THE REPORT
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
4. EQUIPMENT BREAK DOWN OPERATOR
60
30
5
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause:
DONE PREVENTIVE MAINTENANCE PREVENTIVE
2. NO YELLOW RUST YELLOW RUST LEADS TO RUST FORMATION 1. CONVEYOR BREAK DOWN OPERATOR
64
40
4
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
42
28
7
4
THICKNESS TO RUST FORMATION IN FIELD
SPRAY PRESSURE INSPECTION DONE AND RECORD
FM/EFCT:
FM :Nil MAINTAINED AS SCHEDULED
Cause: PRENENTINE MAINTAINENCE TO BE Cause: VISUAL
ROUGH SURFACE AESTHETIC
1. IMPURITIES IN BATH DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
120
4. NO DUST DUST PROBLEM & COATING SPOT PEEL OFF OPERATOR
50
5
5
SOLUTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
LEADS TO SPOT RUST
FM :Nil FM/EFCT:
Cause: PROPER SPRAY PRESSURE AS PER Cause: VISUAL
1. IMPROPER SURFECE
NORMS PRESSURE GAUGE CALIBRATION
CLEANING AFTER OPERATOR
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
ROUGH SURFACE AESTHETIC PHOSPHATING
FM :Nil FM/EFCT: MAINTAINED
1. NO BLISTERS BLISTERS PROBLEM & COATING SPOT PEEL OFF
80
25
5
5
LEADS TO SPOT RUST Cause: PRENENTINE MAINTAINENCE TO BE Cause: VISUAL
DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. POOR BATH MAINTANENCE OPERATOR
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
Operation no.100 FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1. CONVEYOR BREAK DOWN OPERATOR
96
48
8
4
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
DM RINSE I
DM RINSE I Cause: MAINTAIN THE CONCENTRATION BY Cause: ANALYSIS REPORT
ANALYSING AT LAB
2. NO YELLOW RUST YELLOW RUST LEADS TO RUST FORMATION 2. CONCENTRATION HIGH CHECK ONCE IN SHIFT & RECORD LAB
60
30
6
5
INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: CHECK THE CONDUCTIVITY ONCE IN Cause: CONDUCTIVITY METER SERVICING OF WATER PLANT FOR
3. CONDUCTIVITY OF DM A SHIFT EVERY 1 YEAR & CHECK THE
LAB SERVICING MADE AS SCHEDULED
48
24
4
4
WATER ABOVE THE NORMS CONDUCTIVITY OF SOLUTION EVERY
FM :Nil FM/EFCT: SHIFT & RECORD
Cause: PROPER SPRAY PRESSURE AS PER Cause: VISUAL
1. IMPROPER SURFECE
NORMS PRESSURE GAUGE CALIBRATION
CLEANING AFTER OPERATOR
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
ROUGH SURFACE AESTHETIC PHOSPHATING
FM :Nil FM/EFCT: MAINTAINED
1. NO BLISTERS BLISTERS PROBLEM & COATING SPOT PEEL OFF
80
30
5
6
LEADS TO SPOT RUST Cause: PRENENTINE MAINTAINENCE TO BE Cause: VISUAL
DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. POOR BATH MAINTANENCE OPERATOR
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
Operation no.110 FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1. CONVEYOR BREAK DOWN OPERATOR
96
60
8
5
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
60
30
6
5
CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: CHECK THE CONDUCTIVITY ONCE IN Cause: CONDUCTIVITY METER SERVICING OF WATER PLANT FOR
3. CONDUCTIVITY OF DM A SHIFT EVERY 1 YEAR & CHECK THE LAB IN
SERVICING MADE AS SCHEDULED
48
24
4
4
WATER ABOVE THE NORMS CONDUCTIVITY OF SOLUTION EVERY CHARGE
FM :Nil FM/EFCT: SHIFT & RECORD
Cause: PROPER SPRAY PRESSURE AS PER Cause: VISUAL
1. IMPROPER SURFECE
NORMS PRESSURE GAUGE CALIBRATION
CLEANING AFTER OPERATOR
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
ROUGH SURFACE AESTHETIC PHOSPHATING
FM :Nil FM/EFCT: MAINTAINED
1. NO BLISTERS BLISTERS PROBLEM & COATING SPOT PEEL OFF
80
30
5
6
LEADS TO SPOT RUST Cause: PRENENTINE MAINTAINENCE TO BE Cause: VISUAL
DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. POOR BATH MAINTANENCE OPERATOR
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
Operation no.120 FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1. CONVEYOR BREAK DOWN OPERATOR
96
8
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
60
60
6
5
CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: CHECK THE CONDUCTIVITY ONCE IN Cause: CONDUCTIVITY METER SERVICING OF WATER PLANT FOR
3. CONDUCTIVITY OF DM A SHIFT EVERY 1 YEAR & CHECK THE LAB IN
SERVICING MADE AS SCHEDULED
48
4
WATER ABOVE THE NORMS CONDUCTIVITY OF SOLUTION EVERY CHARGE
FM :Nil FM/EFCT: SHIFT & RECORD
Cause: PROPER SPRAY PRESSURE AS PER Cause: VISUAL
1. IMPROPER SURFECE
NORMS PRESSURE GAUGE CALIBRATION
CLEANING AFTER OPERATOR
DONE & CHECK LIST ADHERED GAUGE CALIBRATED AND REPORTS
ROUGH SURFACE AESTHETIC PHOSPHATING
FM :Nil FM/EFCT: MAINTAINED
1. NO BLISTERS BLISTERS PROBLEM & COATING SPOT PEEL OFF
80
30
5
6
LEADS TO SPOT RUST Cause: PRENENTINE MAINTAINENCE TO BE Cause: VISUAL
DONE TO REMOVE DUST PARTICALS PREVENTIVE MAINTENANCE PREVENTIVE
2. POOR BATH MAINTANENCE OPERATOR
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
Operation no.130 FM :Nil FM/EFCT:
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1. CONVEYOR BREAK DOWN OPERATOR
96
8
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
60
60
6
5
CHARGE INSPECTION DONE AND RECORD
FM :Nil FM/EFCT: MAINTAINED AS SCHEDULED
Cause: CHECK THE CONDUCTIVITY ONCE IN Cause: CONDUCTIVITY METER SERVICING OF WATER PLANT FOR
3. CONDUCTIVITY OF DM A SHIFT EVERY 1 YEAR & CHECK THE LAB IN
SERVICING MADE AS SCHEDULED
48
4
WATER ABOVE THE NORMS CONDUCTIVITY OF SOLUTION EVERY CHARGE
FM :Nil FM/EFCT: SHIFT & RECORD
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: DIGITAL THERMO METER DISPLAY
1. LOW AIR TEMPERATURE
DONE PREVENTIVE MAINTENANCE PREVENTIVE
1.NO OOZE OUT, BLISTERS OOZE OUT, BLISTERS IMPROPER DRYING OF COMPONENT (BLOWERS & EXHUAST OPERATOR
96
48
6
8
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
Operation no.140 PROBLEMS)
FM :Nil FM/EFCT:
WATER DRY OFF OVEN Cause: OVEN CLEANING TO BE DONE Cause: VISUAL
ROUGH SURFACE AESTHETIC
1. IMPROPER CLEANING OF EVERY WEEK
2. NO DUST / ROUGHNESS DUST / ROUGHNESS PROBLEM & COATING SPOT PEEL OFF SCHEDULE TO BE ADHERED OPERATOR CLEANING DONE AS SCHEDULED
80
40
5
8
OVEN
LEADS TO SPOT RUST
FM :Nil FM/EFCT:
Cause: SKILL MATRIX
Cause: OPERATOR TO BE EDUCATED
1. OPERATION SKIPPED BY
1. NO OPERATION SKIP OPERATION SKIP OOZE OUT IMPLIMENT EMPLOYEE TRIANING SUPERVISOR SUITABLE TRAINING GIVEN TO OPERATOR
64
40
4
5
OPERATOR
Operation no.150 FM :Nil
FM/EFCT:
AIR BLOW & MASKING Cause: OPERATOR TO BE EDUCATED Cause: VISUAL CHECKING
1. PROBLEM AT CUSTOMER
2. NO OPERATION SKIP OPERATION SKIP PAINT DEPOSITION ON FITMENT AREAS IMPLIMENT EMPLOYEE TRIANING SUPERVISOR SUITABLE TRAINING GIVEN TO OPERATOR
45
15
5
3
END
FM :Nil FM/EFCT:
Cause: CONFIRM WITH SUPPLIER TEST Cause: SUPPLIER TEST REPORT
1. NO PEEL OFF AFTER POWDER 1. USING OF DFECTIVE REPORTS FOR EVERY LOT TC IS MUST, AWARENESS GIVEN TO SUPPLIER AND TC
PEEL OFF LEADS TO RUST FORMATION LAB
36
24
6
4
COATING POWDERS WHICH ARE EXPIRY SUPPLIER HAS INFORME MAINTAINED BATCHWISE
FM :Nil FM/EFCT:
Cause: SET UP THE PRESSURE & FLOW Cause: VISUAL BEFORE STARTING THE PROCESS
1. EXCESS PRESSURE / FLOW RATE IN CIRCUTE AS PER SPECIFICATION PRESURE FLOW RATE HAVE TO BE
2. NO WAVINESS WAVINESS AESTHETIC PROBLEM LIMITATIONS MARKED IN THE CIRCUIT SUPERVISOR
96
32
4
8
RATE ENSURED 100% BY OPERATOR/
FM :Nil FM/EFCT: SUPERVISOR
Operation no.160
96
48
6
8
POWDER COATING TO RUST FORMATION IN FIELD TO BE ADHERED
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: VISUAL
1. LOW FLOW RATE & DONE
SCHEDULE TO BE ADHERE OPERATOR
PRESSURE
FM :Nil FM/EFCT:
48
6
8
DUSTY OPERATION ZONE MAINTAIN PROPER 5S PROPERLY AND HAVE TO BE ENSURED
LEADS TO SPOT RUST
FM/EFCT:
FM :Nil
Cause: SKILL MATRIX
Cause: OPERATOR TO BE EDUCATED
1. OPERATION SKIPPED BY MONITORING THE TRAINED EMPLOYEE
1. NO WAVINESS WAVINESS AESTHETIC PROBLEM EMPLOYEE TRIANING IMPLIMENTED SUPERVISOR
64
32
4
8
OPERATOR FREQUENTLY
FM :Nil
FM/EFCT: VISUAL
Operation no.170 Cause: SKILL MATRIX
Cause: OPERATOR TO BE EDUCATED
POOR CORROSION RESISTANCE LEADS 1. OPERATION SKIPPED BY MONITORING THE TRAINED EMPLOYEE
2. NO UNCOVERAGE UNCOVERAGE EMPLOYEE TRIANING IMPLIMENTED SUPERVISOR
96
48
6
8
TO RUST FORMATION IN FIELD OPERATOR FREQUENTLY
FM :Nil
DEMASKING & INSPECTION FM/EFCT: VISUAL
Cause: SKILL MATRIX
ROUGH SURFACE AESTHETIC Cause: OPERATOR TO BE EDUCATED
1. OPERATION SKIPPED BY MONITORING THE TRAINED EMPLOYEE
3. NO DUST / ROUGHNESS DUST / RUOGHNESS PROBLEM & COATING SPOT PEEL OFF EMPLOYEE TRIANING IMPLIMENTED SUPERVISOR
96
48
6
8
OPERATOR FREQUENTLY
LEADS TO SPOT RUST FM :Nil
FM/EFCT: VISUAL
Cause: PREVENTIVE MAINTAINENCE TO BE Cause: DIGITAL THERMO METER
1. LOW AIR TEMPERATURE
DONE PREVENTIVE MAINTENANCE PREVENTIVE
(BLOWERS & EXHUAST OPERATOR
SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
PROPLEMS)
FM :Nil FM/EFCT:
1. NO COATING PEEL OFF COATING PEEL OFF LEADS TO RUST FORMATION
96
48
6
8
Operation no.180 Cause: SET UP THE SPEED AS PER Cause: VISUAL
CONVEYOR SPEED FINALISED AND
2. DEVIATION IN CONVEYOR SPECIFICATION FIX THE CONVEYOR SPEED IN
SUPERVISOR INCLUDED IN THE CONTROL PANNEL,THE
SPEED CONTROL PANNEL
SAME HAVE TO BE MONITORED
OVEN CURING FM :Nil FM/EFCT:
Cause: OVEN CLEANING TO BE DONE Cause: VISUAL
ROUGH SURFACE AESTHETIC
1. IMPROPER CLEANING OF EVERY WEEK SCHEDULE ADHERENCE TO BE ACHIEVED
2. NO DUST / ROUGHNESS DUST / RUOGHNESS PROBLEM & COATING SPOT PEEL OFF SCHEDULE TO BE ADHERE OPERATOR
96
48
6
8
OVEN AND MONITORED
LEADS TO SPOT RUST
FM :Nil FM/EFCT:
48
6
8
OPERATOR AND MONITORED REGULARLY
POOR CORROSION RESISTANCE LEADS FM :Nil
FM/EFCT:
1. NO UNCOVERAGE UNCOVERAGE TO RUST FORMATION IN FIELD /
96
6
8
AESTHETIC PROBLEM
Cause: SKILL MATRIX
Cause: ON JOB TRAINING TO OPERATOR
2. IMPROPER FLOW RATE AND SUITABLE TRAINING GIVEN TO OPERATOR
TRAINING TO BE GIVEN SUPERVISOR
48
6
8
VOLTAGE AND MONITORED
FM :Nil
FM/EFCT:
Cause: SKILL MATRIX
Cause: ON JOB TRAINING TO OPERATOR
SUITABLE TRAINING GIVEN TO OPERATOR
1. UNSKILLED OPERATOR TRAINING TO BE GIVEN SUPERVISOR
48
6
8
AND MONITORED
FM :Nil
AESTHETIC PROBLEM / CUSTOMER FM/EFCT:
2. OVER FLOW NOT ALLOWED OVER FLOW
96
6
8
DISSATISFACTION Cause: SKILL MATRIX
Cause: ON JOB TRAINING TO OPERATOR
2. IMPROPER FLOW RATE AND SUITABLE TRAINING GIVEN TO OPERATOR
TRAINING TO BE GIVEN SUPERVISOR
48
6
8
VOLTAGE AND MONITORED
FM :Nil
FM/EFCT:
Cause: SPRAY AND OVEN TO BE CLOSED Cause: VISUAL
1. ATMOSPHERIC DUST / OVEN PROPERLY TO PREVENT DUST ENTRY SUITABLE TRAINING GIVEN TO OPERATOR
TRAINING TO BE GIVEN SUPERVISOR
40
8
5
DUST AND MONITORED
AESTHETIC PROBLEM / CUSTOMER FM :Nil FM/EFCT:
3. NO DUST / ROUGHNESS DUST
80
8
5
DISSATISFACTION Cause: INCOMIN INSPECTION OF POWDER Cause: LAB REPORTS
Operation no.190 PROPER COMMUNICATION TO THE
1. INCOMING POWDER AT LAB LAB IN FREQUENT MONITORING OF THE
SUPPLIER REGARDING THE POWDER
40
8
5
PROBLEM CHARGE SUPPLIER AS WELL AS LAB REPORTS
STANDARD AND REQUIREMENT
FM :Nil FM/EFCT:
Cause: DRY OFF OVEN- POKA YOKE FOR Cause: AUTOMATIC LINE STOPPAGE IF
TEMPERATURE CONTROL ENSURING TEMPERATURE DECREASES
AESTHETIC PROBLEM / CUSTOMER 1. IMPROPER DRYING OF PREVENTIVE MAINTENANCE PREVENTIVE
4. NO OOSEOUT OOSEOUT PROPER DRYING OPERATOR
54
6
0
DISSATISFACTION COMPONENTS SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
FM :Nil FM/EFCT:
Cause: DRY OFF OVEN- POKA YOKE FOR Cause: AUTOMATIC LINE STOPPAGE IF
UNLOADING & FINAL 1. IMPROPER PRE TREATMENT TEMPERATURE CONTROL ENSURING TEMPERATURE DECREASES
INSPECTION AESTHETIC PROBLEM / CUSTOMER PREVENTIVE MAINTENANCE PREVENTIVE
5. NO BLISTERS BLISTERS AND IMPROPER DRYING OF PROPER DRYING OPERATOR
16
4
0
DISSATISFACTION SCHEDULE TO BE ADHERE MAINTENANCE SCHEDULE IMPLEMENTED
COMPONENTS
FM :Nil FM/EFCT:
80
5
0
DISSATISFACTION AND MONITORED
MORE DFT
FM :Nil FM/EFCT:
Cause: DEGREASING OF THE COMPONENTS Cause: PROPER DEGREASING
AESTHETIC PROBLEM / CUSTOMER TO BE ENSURED SUITABLE TRAINING GIVEN TO OPERATOR
7. NO OIL PATCH OIL PATCH 1. IMPROPER CLEANING TRAINING TO BE GIVEN SUPERVISOR
36
6
0
DISSATISFACTION AND MONITORED
FM :Nil FM/EFCT:
Cause: POKA YOKE PROVIDED IN CURING Cause: VISUAL
AESTHETIC PROBLEM / CUSTOMER 1. LOW BAKING AND POWDER OVEN SUITABLE TRAINING GIVEN TO OPERATOR
8. NO DULL FINISH DULL FINISH TRAINING TO BE GIVEN SUPERVISOR
96
6
0
DISSATISFACTION QUALITY AND MONITORED
FM :Nil FM/EFCT:
Cause: OPERATOR TRAINING, INCOMING Cause: VISUAL
9. ORANGE PEEL OFF NOT AESTHETIC PROBLEM / CUSTOMER 1. UNSKILLED OPERATOR, LOW CHECKING OF POWDER SUITABLE TRAINING GIVEN TO OPERATOR
ORANGE PEEL TRAINING TO BE GIVEN SUPERVISOR
96
6
0
ALLOWED DISSATISFACTION POWDER QUALITY AND MONITORED
FM :Nil FM/EFCT:
Cause: VISUAL
Cause: POKA YOKE PROVIDED IN JIGS
AESTHETIC PROBLEM / CUSTOMER 1. DAMAGED JIGS, MANUAL SUITABLE TRAINING GIVEN TO OPERATOR
10. NO SCRATCH SCRATCH TRAINING TO BE GIVEN SUPERVISOR
80
5
0
DISSATISFACTION MISHANDLING AND MONITORED
FM :Nil
FM/EFCT:
Cause: Gauge calibration Interact with the Cause: 100% Gauge inspection
1.Gauge allowed the defect Customer ONCE IN THREE MONTHS CALIBRATION PLAN SCHEDULE TO BE
Inspector - QA
0
component CALIBRATION PLAN ADHERED
Operation no.200 A .Customer dissatisfaction FM :Nil FM/EFCT:
1. ANSWERING TO ACC GAUGE Gauge not Answering B. Not able to assemble in vehicle
54
6
6
FINAL ACC GAUGE INSPECTION C. NC Product. Cause: SKILL MATRIX
Cause: On the job Training
SUITABLE TRAINING GIVEN TO OPERATOR
2. Operator not trained TRAINING TO BE GIVEN SUPERVISOR
AND MONITORED
FM :Nil
FM/EFCT:
Cause: VISUAL
Operation no.210 1. NO Cause: Internal monitoring
Dents, damages, scratches, SUITABLE TRAINING GIVEN TO OPERATOR
DENT,DAMAGE,SCRATCHES,MISPL Problem in subsequent operation 1. Mishandling TRAINING TO BE GIVEN SUPERVISOR
80
5
0
misplace AND MONITORED
MOVE TO ASSEMBLY AREA ACE FM :Nil
FM/EFCT:
Operation no.220 Cause: Skill matrix to be prepared & evaluated Cause: 100% Gauge inspection
NO OPERATION SKIP/EXCESS for the inspector. ONCE IN THREE MONTHS CALIBRATION PLAN SCHEDULE TO BE
Operation skip / excess spraying Poor appearance- Customer dissatisfactioN 1. Inadequate inspector skill Inspector - QA
60
5
0
FINAL VISUAL INSPECTION AND SPRAYING CALIBRATION PLAN ADHERED
SPRAY TOUCH UP FM :Nil FM/EFCT:
Cause: Monthly layout Inspection Schedule
Operation no.230 Cause:
A&B 2.Customer dissatisfaction ONCE IN THREE MONTHS LAYOUT LAY OUT INSPECTION PLAN SCHEDULE TO
NO DIMENSION VARIATION Dimension variation & Out of spec 1. Process variation Inspector - QA
72
6
0
c.Nil INSPECTION PLAN BE ADHERED
LAYOUT INSPECTION FM :Nil
FM/EFCT:
Operation no.240 Cause: Dedicated Trolley Visual Inspection
A. Nil Cause:
NO SCRATCHES , LINE MARK,DENT SUITABLE TRAINING GIVEN TO OPERATOR
Scratches, line mark, Dent, damage B.customer dissatisfaction Operator not Trained TRAINING TO BE GIVEN SUPERVISOR
60
5
0
DAMAGE AND MONITORED
C.Nc Product FM :Nil
PACKING FM/EFCT:
Operation no.260 A. Nil Cause: Sample inspection
Cause:
B.Miss match Comp, defect comp send to
QTY AS PER INVOICE Qty Missing As per Invoice 1. Inadequate inspector skill TRAINING TO BE GIVEN QC- engineer Tra8ning to be given
80
20
4
5
Customer
FM :Nil
DOC AUDIT C.Nil FM/EFCT:
Cause: 100% VISUAL
Cause: Skill matrix to be prepared
A. Nil SUITABLE TRAINING GIVEN TO OPERATOR
144
1. PROPER PACKING Improper packing 1. Unskilled worker AS PER SCHEDULE SUPERVISOR
48
6
8
B 1.Customer dissatisfaction c.Nil AND MONITORED
FM :Nil
FM/EFCT:
Operation no.260
Cause: Material handling to be done as per work
Cause: Internal audit
A. Nil instruction SUITABLE TRAINING GIVEN TO OPERATOR
2. PROPER TROLLEY Improper trolley 2. Improper trolley or bin used AS PER SCHEDULE SUPERVISOR
90
30
6
5
B 1.Customer dissatisfaction c.Nil AND MONITORED
FM/EFCT:
FM :Nil
DESPATCH TO TVS
Cause: Material handling to be done as per work Cause: Internal audit
A. Nil instruction SUITABLE TRAINING GIVEN TO OPERATOR
3.PREPLANNED TRANSPORTATION Transportation defects 3. Improper trolley or bin used AS PER SCHEDULE SUPERVISOR
75
25
5
5
B 1.Customer dissatisfaction c.Nil AND MONITORED
FM :Nil FM/EFCT:
Revision Record
Date Rev. No. Revision Details Sign
CONTROL PLAN
Prototype Pre - launch Production
Date ( Org.): Revision No. Revision date
Key Contact person / Phone : Mr.Gireesh Krishnan (AGM)
1 14.05.2016
Control Plan Number :
26.03.2016
Part Number / Latest Change CFT Members: Satish vakundkar, Gireesh Krishnan, Manimaran, Customer Engineering Approval / Date ( if
N9092230 Prabakar,Reddy,
Level : Reqd.)
Supplier / Plant Approval / Date Customer Quality Approval / Date
Part Name / Description : SWING ARM ASSY U180 (if required)
ANY DEVIATION
EVERY
20.01 Conveyor Chain CONVEYOR SPEED - Nil 1.2 m/min CONTROL BOARD DISPLAY Nil TWICE CONTROL PANEL OPERATOR OBSERVED- INFORM TO
SHIFT
Conveyor SUPERVISOR
DIFFERENT JIG NOT TO
20.02 JIGS As Per Jig Matrix MA Nil 50 KGS As Per Jig Matrix Nil - - Jig Matrix Displayed OPERATOR
BE USED
EVERY
20.04 HOOK TO HOLD THE COMPONENT - Nil 300MM PITCH VISUAL Nil ONCE VISUAL OPERATOR
BATCH
20 LOADING HOOK
TWO
20.05 HOOK TO HOLD THE COMPONENT - Nil No bend & damage VISUAL Nil ONCE VISUAL OPERATOR
HOURS
NO BEND ,NO HEAVY
NO DEVIATION, COMPONENT TO BE EVERY DAMAGED JIGS TO BE
Jigs 20.06 DEPOSITED POWDER, NO TO HOLD THE COMPONENT - Nil VISUAL Nil ONCE VISUAL OPERATOR
HOLD CORRECTLY BATCH MOVED TO REWORK
DAMAGE
IMPROPER LOADING, DENT, EVERY WORK INSTRUCTION TO BE SEND BACK TO
COMPONENT 20.07 - - Nil NOT ALLOWED VISUAL Nil ONCE SUPERVISOR
DAMAGE,RUST,EXCESS OIL, BATCH DISPLAYED SUPPLIER
30.01 TYPE OF WATER USED PREPARING SOLUTION Ma Nil RAW WATER - Nil - - _ - _
30.02 RAW WATER PH LEVEL - Nil 6. - 8 PH METER/PH PAPER Nil ONCE SHIFT ANALYSIS REPORT CHEMIST INFORM TO SUPPLIER
IN TWO FILL WITH FRESH RAW
BATH SOLUTION
30.03 WATER LEVEL - Mi Nil 1500LTRS VISUAL Nil ONCE HOURS
VISUAL OPERATOR
WATER
- 1500Ltrs
CHEMICALS: RIDOLINE 1352
BA ( M/S HENKEL ADDITION AS PER LAB
30.04
CHEMBOND SURFACE
CONCENTRATION Ma Nil 05 -10 ml TITRATION AT LAB Nil THRICE PER SHIFT ANALYSIS REPORT CHEMIST RECOMMENDATION
TECHNOLOGIS LTD)
CONTROL PANEL/ TWO CLEAN THE HEAT
BURNER 30.05 DIESEL TEMPERATURE - Nil 50-65 DEG. Nil ONCE CHECK THE HEAT EQUIPMENT OPERATOR
EQUIPMENT
THERMOMETER HOURS
ANY DEVIATION INFORM
PRE TREATMENT - PRESSURE GAUGE 30.06 - PRESSURE - Nil 0.8 - 1.2 Kg/Sq Cm PRESSURE GAUGE Nil TWICE IN A SHIFT PRESSURE GUAGES PROVIDED OPERATOR PMD
30 KNOCK OUT
AUTO MOVEMENT OF ANY DEVIATION INFORM
DEGREASING [KOD] CONVEYOR 30.07 - PROCESS TIME - Nil 60 SEC. Nil TWICE IN A SHIFT READ IN CONTROL PANEL OPERATOR
PMD
CONVEYOR
ANY DEVIATION INFORM
SKIMMER 30.08 - OIL SKIMMER - Nil CONTINUOUS RUNNING VISUAL Nil TWICE IN A SHIFT VISUAL OPERATOR SUPERVISOR
SOLUTION SHOULD BE FREE FROM PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
TANK 30.09 TANK CLEANING OF TANK Ma Nil
SLUDGE
MANUAL Nil ONCE PER WEEK SCHEDULE
OPERATOR SUPERVISOR
FLAT FAN
BALL
ANY DEVIATION INFORM
SPRAY NOZZLE 30.10 SPRAY NOZZEL TYPE - JOINT- Nil 48 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN A SHIFT MANUALLY OPERATOR SUPERVISOR
P.P [10
LPM]
IN A PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
RISERS 30.11 RISERS - - Nil 8 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE SCHEDULE
SUPERVISOR SUPERVISOR
MONTH
40.01 TYPE OF WATER USED PREPARING SOLUTION Ma Nil RAW WATER - Nil - - _ - _
40.02 RAW WATER PH LEVEL Nil 6. - 8 PH METER/PH PAPER Nil ONCE SHIFT ANALYSIS REPORT CHEMIST INFORM TO SUPPLIER
PER TWO FILL WITH FRESH RAW
40.03 WATER LEVEL - Mi Nil 1500 LTRS VISUAL Nil ONCE HOURS
VISUAL OPERATOR
WATER
BATH SOLUTION - 1500Ltrs
CHEMICALS: RIDOLINE 1352
BA ( M/S HENKEL ADDITION AS PER LAB
40.04
CHEMBOND SURFACE
- Ma Nil 25-30 ml TITRATION AT LAB Nil THRICE PER SHIFT ANALYSIS REPORT CHEMIST RECOMMENDATION
TECHNOLOGIS LTD)
CONTROL PANEL/ TWO CLEAN THE HEAT
BURNER 40.05 DIESEL TEMPERATURE - Nil 55 - 60 DEG. Nil ONCE CHECK THE HEAT EQUIPMENT OPERATOR
EQUIPMENT
THERMOMETER HOURS
ANY DEVIATION INFORM
40 DEGREASING STAGE - 1 PRESSURE GAUGE 40.06 - PRESSURE - Nil 0.8 - 1.2 Kg/Sq Cm PRESSURE GAUGE Nil TWICE IN A SHIFT PRESSURE GUAGES PROVIDED OPERATOR PMD
AUTO MOVEMENT OF ANY DEVIATION INFORM
CONVEYOR 40.07 - PROCESS TIME - Nil 60 SEC. Nil TWICE IN A SHIFT READ IN CONTROL PANEL OPERATOR
CONVEYOR PMD
SOLUTION SHOULD BE FREE FROM PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
TANK 40.08 TANK CLEANING OF TANK Ma Nil
SLUDGE
MANUAL Nil ONCE PER WEEK SCHEDULE OPERATOR SUPERVISOR
FLAT FAN
BALL
ANY DEVIATION INFORM
SPRAY NOZZLE 40.09 SPRAY NOZZEL TYPE - JOINT- Nil 48 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN A SHIFT MANUALLY OPERATOR SUPERVISOR
P.P [10
LPM]
IN TWO PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
RISERS 40.10 RISERS - - Nil 8 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE SCHEDULE
SUPERVISOR SUPERVISOR
MONTHS
50.01 TYPE OF WATER USED - Ma Nil RAW WATER - Nil - - _ - _
50.02 RAW WATER PH LEVEL Nil 6. - 8 PH METER/PH PAPER Nil ONCE SHIFT ANALYSIS REPORT CHEMIST INFORM TO SUPPLIER
PER TWO FILL WITH FRESH RAW
50.03 WATER LEVEL - Mi Nil 3000 LTRS VISUAL Nil ONCE HOURS VISUAL OPERATOR
WATER
BATH SOLUTION - 3000 Ltrs
CHEMICALS: RIDOLINE 1352
BA ( M/S HENKEL ADDITION AS PER LAB
50.04
CHEMBOND SURFACE
- Ma Nil 20-25 ml TITRATION AT LAB Nil THRICE PER SHIFT ANALYSIS REPORT CHEMIST RECOMMENDATION
TECHNOLOGIS LTD)
CONTROL PANEL/ TWO CLEAN THE HEAT
BURNER 50.05 DIESEL TEMPERATURE - Nil 50-55 DEG. THERMOMETER
Nil ONCE
HOURS
CHECK THE HEAT EQUIPMENT OPERATOR
EQUIPMENT
ANY DEVIATION INFORM
50 DEGREASING STAGE - 2 SPRAY PUMPS 50.06 - PRESSURE - Nil 0.8 - 1.2 Kg/Sq Cm PRESSURE GAUGE Nil TWICE IN A SHIFT PRESSURE GUAGES PROVIDED OPERATOR PMD
AUTO MOVEMENT OF ANY DEVIATION INFORM
CONVEYOR 50.07 - PROCESS TIME - Nil 180 SEC. CONVEYOR
Nil TWICE READ IN CONTROL PANEL OPERATOR
PMD
SOLUTION SHOULD BE FREE FROM PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
TANK 50.08 TANK CLEANING OF TANK Ma Nil
SLUDGE
MANUAL Nil ONCE PER WEEK SCHEDULE OPERATOR SUPERVISOR
FLAT FAN
BALL
ANY DEVIATION INFORM
SPRAY NOZZLE 50.09 SPRAY NOZZEL TYPE - JOINT- Nil 120 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN A SHIFT MANUALLY OPERATOR SUPERVISOR
P.P [10
LPM]
IN TWO PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
RISERS 50.10 RISERS - - Nil 20 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE SCHEDULE
SUPERVISOR SUPERVISOR
MONTHS
60.01 TYPE OF WATER USED - Ma Nil RAW WATER - Nil - - _ - _
60.02 RAW WATER PH LEVEL Nil 6. - 8 PH METER/PH PAPER Nil ONCE SHIFT ANALYSIS REPORT CHEMIST INFORM TO SUPPLIER
PER TWO FILL WITH FRESH RAW
BATH SOLUTION - 1500 Ltrs 60.03 WATER LEVEL - Mi Nil 1500 LTRS VISUAL Nil ONCE HOURS VISUAL OPERATOR
WATER
CONTINUOUS OVER FLOW
ANALYSIS REPORT FROM
60.04 WATER CONCENTRATION OF CHEMICAL Ma Nil 2ML MAXIMUM TITRATION AT LAB Nil THRICE PER SHIFT
LAB
CHEMIST & FRESH RAW WATER
ADDITION
PRESSURE GUAGES ANY DEVIATION
SPRAY PUMPS 60.05 - PRESSURE - Nil 0.8 - 1.2 Kg/Sq Cm PRESSURE GAUGE Nil TWICE IN A SHIFT
PROVIDED
OPERATOR
INFORM PMD
AUTO MOVEMENT OF ANY DEVIATION
CONVEYOR 60.06 - PROCESS TIME - Nil 60 SEC. Nil TWICE IN A SHIFT READ IN CONTROL PANEL OPERATOR
CONVEYOR INFORM PMD
60 WATER RINSE 1
TWO ANY DEVIATION
60.07 OVER FLOW - Nil CONTINUOUS RUNNING VISUAL Nil ONCE CHECK LIST OPERATOR
HOURS INFORM SUPERVISOR
SOLUTION SHOULD BE FREE FROM EVERY PREVENTIVE MAINTENANCE ANY DEVIATION
60.08 - FREQUENCY OF CLEANING Mi Nil VISUAL Nil ONCE OPERATOR
SLUDGE WEEK SCHEDULE INFORM SUPERVISOR
FLAT FAN
BALL
ANY DEVIATION INFORM
SPRAY NOZZLE 60.09 SPRAY NOZZEL TYPE - JOINT- Nil 48 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN A SHIFT MANUALLY OPERATOR SUPERVISOR
P.P [10
LPM]
IN THREE PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
RISERS 60.10 RISERS - - Nil 8 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE SCHEDULE
SUPERVISOR SUPERVISOR
MONTHS
70.01 TYPE OF WATER USED - Ma Nil RAW WATER - Nil - - _ - _
70.02 RAW WATER PH LEVEL Nil 6. - 8 PH METER/PH PAPER Nil ONCE SHIFT ANALYSIS REPORT CHEMIST INFORM TO SUPPLIER
PER TWO FILL WITH FRESH RAW
BATH SOLUTION - 1500 Ltrs 70.03 WATER LEVEL - Mi Nil 1500 LTRS VISUAL Nil ONCE HOURS VISUAL OPERATOR
WATER
CONTINUOUS OVER FLOW
ANALYSIS REPORT FROM
70.04 WATER CONCENTRATION OF CHEMICAL Ma Nil 1~ 1.5 ML MAXIMUM TITRATION AT LAB Nil THRICE PER SHIFT
LAB
CHEMIST & FRESH RAW WATER
ADDITION
PRESSURE GUAGES ANY DEVIATION
SPRAY PUMPS 70.05 - PRESSURE - Nil 0.8 - 1.2 Kg/Sq Cm VISUAL Nil TWICE IN A SHIFT
PROVIDED
OPERATOR
INFORM PMD
AUTO MOVEMENT OF ANY DEVIATION
CONVEYOR 70.06 - PROCESS TIME - Nil 60 SEC. Nil TWICE IN A SHIFT READ IN CONTROL PANEL OPERATOR
CONVEYOR INFORM PMD
FLAT FAN
130 DM MIST BALL
ANY DEVIATION
SPRAY NOZZLE 130.03 SPRAY NOZZEL TYPE - JOINT- Nil 8 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN A SHIFT MANUALLY OPERATOR
INFORM SUPERVISOR
P.P [1
LPM]
PREVENTIVE MAINTENANCE ANY DEVIATION INFORM
RISERS 130.04 RISERS - - Nil 2 NOS FREE FROM BLOCKAGE VISUAL Nil ONCE IN 3 MONTH SCHEDULE
SUPERVISOR SUPERVISOR
INFORM ANY
BURNER 140.01 DIESEL OVEN TEMPERATURE - Nil 150±10 ° C CONTROL PANNEL Nil ONCE
IN TWO
HOURS
CHECK LIST OPERATOR DEVIATION TO
SUPERVISOR
EVERY PREVENTIVE MAINTENANCE CLEANING EVERY
BLOWER & EXHAUST 140.02 HOT AIR AIR CIRCULATION - Nil TO BE RUN CONTINUOSLY VISUAL Nil ONCE PMD
WEEK SCHEDULE WEEK
140 WATER DRY OFF OVEN
TWICE IN A ANY DEVIATION
CONVEYOR 140.03 PROCESS TIME - Nil 15 MIN. READ IN CONTROL BOARD Nil 100%
SHIFT
READ IN CONTROL PANEL OPERATOR
INFORM SUPERVISOR
EVERY PREVENTIVE MAINTENANCE CLEAN / REPLACE NEW
FILTER 140.04 FILTER DUST COLLECTION - Nil NOT ALLOWED VISUAL Nil ONCE SUPERVISOR
WEEK SCHEDULE FILTER
FREE FROM PRE TREATMENT EVERY ANY DEVIATION
150.01 PHOSPATING PARTS - Nil VISUAL Nil 100% VISUAL OPERATOR
DEFECTS BATCH INFORM SUPERVISOR
COMPLETELY DRY FROM WATER / IN TWO ANY DEVIATION
150.02 COMPONENTS OIL FREE AIR BLOWER - Nil VISUAL Nil ONCE VISUAL OPERATOR
CHEMICAL HOURS INFORM SUPERVISOR
THE COMPONENT TO BE
EXPOSED FOR 500 HOURS
DURING AND AFTER THE TEST
IN WEATHEROMETER AND
THERE SHOULD BE NO BLISTER ,
ASSESSED AS PER TEST
ACCELERATED WEATHERING PEEL OFF , FADING, 5 BATCH AS PER SUPPLIER TEST SEND THE POWDER
WEATHEROMETER 190.10 - - Nil CYCLE GIVEN BELOW. TEST Nil ONCE CHEMIST
TEST CHALKING , .MAXIMUM ONCE REPORT RETURN TO SUPPLIER
CYCLE, 4 HOURS
PERMISSABLE LOSS BY GLOSSY
CONDENSATE AT 45 DEG. 4
AFTER THE TEST : 20%
HOURS UV RADIATION AT
50 DEG
1 No /
HARDNESS TEST : USE 2H EVERY ANY DEVIATION
Supplier LAB TEST REPORT CHEMIST
PENCIL AT 45° ANGLE TO BATCH INFORM SUPPLIER
Panel
2H PENCIL 190.11 TYPE OF PENCEIL USED EFFECTIVE SURFACE AND - Nil 2H PENCIL SCRATCH TEST Nil
SPEED OF 3MM/SEC APPLYING PER INFORM ANY
MAX PRESSURE TO PENCIL ONCE MODEL / LAB TEST REPORT CHEMIST DEVIATION TO
DAY SUPERVISOR
NO PEEL OFF THE POWDER TEST PIECE OF 20X20 CM 1 No /
FLEXIBILITY EVERY SUPPLIER TEST PANEL
190.12 - - Nil COATING AT THE END OF MANUAL SHOULD BE BENT UPTO Nil Supplier CHEMIST -
TEST BATCH WITH CERTIFICATE
BEND [CONICAL] TEST 2MM Panel
Note: All Dimension are in mm unless otherwise specified.
LEGENDS FOR CONTROL IN CHARGE LEGENDS FOR SPECIAL CHARACTERISTIC CLASS
S PATROL INSPECTOR C - CRITICAL D.H.G. Digital Height Gauge P.G.G.- Plug Gap Gauge
O OPERATOR Ma - MAJOR D.V.C. Vernier Caliper R.G. - Receiver Gauge
FFP FIRST FIVE PARTS Mi - MINOR LFP LAST FIVE PARTS P.G. - Plug Gauge
5 N = No. of samples to be checked, C = No. of defectives permitted
4 Note: Reaction Plan: Whenever the Process Parameters or Product Characteristics are found non-conforming, quarantine the pieces produced after
3 the last product characteristic check, identify with Yellow Colour label and re-inspect 100%. Remove Non-conforming products and identify with Red
2 Colour Tag. Make entry in Production Log Book and inform Team Leader / Charge-hand and Supervisor.
1 Customer Drawing number changed from G4300280 C1 to G4300289 L4 14.05.2016
0 Control plan updated as per AVB audit requirement 26.03.2016 PREPARED BY: APPROVED BY: Date:
Sl. No. DESCRIPTION OF REVISIONS CARRIED OUT DATE Prepared Approved Riyaz Mubarak .M Manimaran .G 27/02/2016
Part description Part Number Rev No & date
XXXXXXX XXXXX XXXXX
SlNo Quality
characteristic Spl Char Class Cpk Target UOM
description
I Appearance
8 Warpage Visual
Damage on
9 textured area
Visual
12 Streak Visual
13 Deepcut Visual
14 Degating Visual
Lock Rib bend
15 /Crack
Visual
17 Colour Visual
Wrong direction
29 assy (Mud flap)
Visual
30 Assy part miss Visual
31 Finish (Mud Flap) Visual
II Material
1 PP-3 SJS 1012 Bag
General Remarks :
Person responsible
Name :
Designation :
Sign & Date :
Notes -
Quality characteristic description: Dimension or parameter to be inspected
Means of Inspection : Inspection instrument, equipment, jigs, fixtures, etc. used for inspection
Stage of control : Stage at which inspection is carried out at diffent stages of processes (e.g.In
Frequency at Supplier end : Frequency of inspection carried out at supplier end - To be filled b
Inspection method can be added as separate annexure (if reqd)
TVSM Part Specific Inspection Plan ( Agreement of Inspection )
Sup . Drawing Sup Drg Rev
Model Supplier Name Supplier Code
No No. & Date
XXXX NA NA XXXX XXXX
Stage of
Specification Tolerance Means of Inspection Frequency at Supplier end
control
Sample Size
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
As per AAR In process online
Not Allowed Visual 5 nos
sample inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
As per AAR In process online
Not Allowed Visual 5 nos
sample inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
In process online
Not Allowed Visual 5 nos
inspection
Uneven surface In process online
Visual 5 nos
not allowed inspection
In process online
Not Acceptable Visual 5 nos
inspection
In process online
Not Acceptable Visual 5 nos
inspection
In process online
Delta E Less than 1.0 Spectrometer 5 nos
inspection
Not acceptable Visual Final inspection 100%
Not acceptable Visual Final inspection 100%
Enmould Visual Final inspection 100%
As per TSMS M/s Basel Test
Incoming Every lot
9745 certificate
Every 6th Lot
11 ±2.0 MFI testing machine inspection @ 6th Lot
incoming
Every 6th Lot
20 ±2.0 Muffle furnace inspection @ 6th Lot
incoming
As per TSMS M/s Reliance
Incoming Every lot
9745 Test certificate
Every 6th Lot
9 ±1.0. MFI testing machine inspection @ 6th Lot
incoming
M/s Konkan
Konkan Incoming Every lot
Test certificate
Geometrical
l Characteristics Non Geometrical Dimensions
Dimensions
1.67 1.33
1.67 1.33
1.33 1
xtures, etc. used for inspection with a specific instruction on reference plane,location and other inspection related instructions. -
ent stages of processes (e.g.In-process inspection , Final inspection ,Pre-despatch inspection, etc.). - To be filled by supplier
at supplier end - To be filled by Supplier
ent of Inspection )
Supplier Code Plant Location
XXXX XXX
Sample
Frequency
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Every lot
Once in year
Once in production
Onerun
production call one lot
Reporting Method
Through mail
Revised by Date
For TVS- M
spection related instructions. - To be filled by supplier
c.). - To be filled by supplier
Agreement Of Inspection
Supplier name and plant location : XXXX
Part no : XXXX Rev no. / date : XXXX Part name : XXXX Model : XXX
Submission for : Alternate source
Availablity of approved control plan by TVSM shall audit the process as per approved control
B1
TVSM plan
The contents of check list for agreement of inspectiion acknowledged & accepted .
Person responsible For Supplier
Name :
Designation :
Sign & Date :
ment Of Inspection and Testing
updation in
Every lot updation in website YES Tradewithtvs.com
Every 3 months To be retained at supplier end YES
To be agreed with the supplier To be retained at supplier end YES
Indiviual Quality
----- ----- YES rating map
monitoring
For TVS- M
Remarks
COMPONENT SUPPLY CHAIN CHART (CSCC)
Part description Part Number Rev No & date Model Sup Drg Rev No. & Date
Guidelines:
1. Sub supplier of Parts/Rawmaterials/sub processes/ special processes like Plating,Heat treatment,etc to be covered in CSCC
2. Parent - Child Relationship, graphical representation to be shown.
3. To be included in PPAP submission as customer specific requirement
4. To be amended and approved as part of Change Control Management System ( In case Change in Supply chain)
5.As per Supplier Manual for Rawmaterial, Special Processes,etc., - TVSM approved sources to be used.
Supplier Feature
Product Structure
Signature
and Prepared By
Designation
CHAIN CHART (CSCC)
Sup Drg Rev No. & Date Supplier Name Supplier Code Plant Location
Supplier Feature
Manufacturing Plant Tier 2 …. N
Location
Tier 2 …N
Approved by Tier 2 …N
QMS
TVSM Refer Certification Tier 2 …N
Guideline 5
Tier 2 …N ( ISO-TS QMS
PPAP Status ( 16949 / ISO Certification
Plant Name Country State. City (Yes/No) Yes/No/NA) 9001) Validity
Revised by
Approved By
Name Signed by
Prepared by
Checked by
Approved by
auges and Testing facility
Part No. & Rev : xxxxxx
Remarks
Single Cavity
Single Cavity
2 cavity
2 cavity
Signed date
Date 13.01.2016
Date 13.01.2016
Date 13.01.2016
SUPPLIER LOGO PACKAGING DATA SHEET
Address xxxxx
Phone No.
Packing Details
Packing Type Primary
Specification 560x450x315 mm
Packing Snapshots
Returnable Method
Non-returnable
Prepared by
Packing Number :
Rev (orgin) :
Description :
Name :
E-mail ID :
Contact Person :
king Details
Secondary
1 no & 16 nos
Approved by