You are on page 1of 8

Abhijeet Techno Pla

STANDARD OPERAT

Part Name : Project

Part No: Station No

Customer: M&M Operation


`
1 2 3

( a) Clean the Checking area before ( a ) Remove the part fron the bag & @ Connect the HMSL connector to
starting the work check for the scarches & other defects electric connection as shown in picture
like lens brackage.

Marathi translation

©. Take care there should not be no ©.If scraches found reject the part & © Whlie connecting the HMSL there
dust record the rejection in rejection book should not be any loose contact

Marathi translation

® If dust found clean the dust with ® Rejected parts keep in rejection area ®
cloth

Marathi translation

Check the following points before start the work. Related documents
1)Table & resting fixture should be clean. 1)Process work instruction sheet.
2) Check the availability of red bin (rejection)and yellow bin(hold) 2)Control plan

Prepared By : Sandeep Bhalke


Abhijeet Techno Plast India Pvt Ltd.
STANDARD OPERATING PROCEDURE

DOCUMENT NO:

ISSUE DATE:

REV. NO:-

REV DATE: -
`
4 5

@ Connect the HMSL connector to @ Check all the lamps of HMSL are @ If found the HMSL OK, then mark
ectric connection as shown in picture in glowing condtion the part with black sticker & Keep it in
Ok Parts

© Whlie connecting the HMSL there © If found one of the lamp is not ©
hould not be any loose contact glowing then reject the HMSL

® Put the rejection sticker on the part ® I


mentioning the reason for rejection

Related documents Safety Points Legends


)Process work instruction sheet.
)Control plan @ Procedure

© Quality Points
® Risk

Approved By:Abinash Das


STANDARD OPERAT

Part Name : HIGH MOUNTING STOP LAMP (HMSL) Project

Part No: Station No

Customer: M&M Operation No


`
1 1S & 2S Of the station 2 Remove the part 3 Connect the Electric connection

( a) Clean the Checking area before ( a ) Remove the part fron the bag & @ Connect the HMSL connector to
starting the work check for the scarches & other defects electric connection as shown in picture
like lens brackage.

©. Take care there should not be no ©.If scraches found reject the part & © Whlie connecting the HMSL there
dust record the rejection in rejection book should not be any loose contact

® If dust found clean the dust with ® Rejected parts keep in rejection area ®
cloth

Check the following points before start the work. Related documents
1)Table & resting fixture should be clean. 1)Process work instruction sheet.
2) Check the availability of red bin (rejection)and yellow bin(hold) 2)Control plan

Prepared By :
STANDARD OPERATING PROCEDURE
DOCUMENT NO:

SCORPIO ISSUE DATE:

1 REV. NO:-

REV DATE: -
`
Connect the Electric connection 4 Check the lamp 5 Marking for OK lamp

@ Connect the HMSL connector to @ Check all the lamps of HMSL are @ If found the HMSL OK, then mark
ectric connection as shown in picture in glowing condtion the part with black sticker & Keep it in
Ok Parts

© Whlie connecting the HMSL there © If found one of the lamp is not ©
hould not be any loose contact glowing then reject the HMSL

® Put the rejection sticker on the part ® I


mentioning the reson for rejection

Related documents Legends


)Process work instruction sheet.
)Control plan @ Procedure

© Check Points

® Risk

Approved By: