You are on page 1of 5

‫جودة‬

NCR Registry
ASF-2 2/‫ذ‬/255/‫ج‬/‫ج‬

Technical office NC NCR


S.N Date Jop No. Client Type QTY Description/Reference Category Item-No Inspector Status
Decision responsible No

Distance of connection plate less Closed


18 9-May-22 1188 Technip FMC Steel Structure 1 Use as it is Production Manpower 18-22 F2001 Sherif
than required M.Elsayed

Closed
19 12-May-22 1188 Technip FMC Steel Structure 1 Holes are drilled in wrong dimension - Prefabrication Manpower 19-22 AST7000 Sherif
Moamen said

Welding process was performed by Closed


20 15-May-22 1220 EGAT Steel Structure 1 - Fabrication Manpower 20-22 RF10404 Sherif
Non qualified person Moamen said

Welding process was performed by Closed said


21 17-May-22 1220 EGAT Steel Structure - - Fabrication Manpower 21-22 BF-MS-206 Sherif
Non qualified person abdelhameed
‫جودة‬

NCR Registry
ASF-2 2/‫ذ‬/255/‫ج‬/‫ج‬

Technical office NC NCR


S.N Date Jop No. Client Type QTY Description/Reference Category Item-No Inspector Status
Decision responsible No
‫جودة‬

NCR Registry
ASF-2 2/‫ذ‬/255/‫ج‬/‫ج‬

Technical office NC NCR


S.N Date Jop No. Client Type QTY Description/Reference Category Item-No Inspector Status
Decision responsible No
‫جودة‬

NCR Registry
ASF-2 2/‫ذ‬/255/‫ج‬/‫ج‬

Technical office NC NCR


S.N Date Jop No. Client Type QTY Description/Reference Category Item-No Inspector Status
Decision responsible No
NCR Analysis from : 01-09-2019 to 31-01-2020 Page : 1/1
% Type of fualt / Total No of
Root Cause Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Faults

Manpower 2 1 1 4 4 12 57.1

Material 3 1 4 19.0

Machine 0 0.0

Methodology 1 2 3 14.3

Drawing 1 1 2 9.5
Others 0 0.0

Total 6 4 3 4 4 0 0 0 0 0 0 0 21 100%

Quality Engineer: Quality Manager : Ahmed Essam

You might also like