S No Greenfield Nandhavanam 29 - Pending items Date: 19-Dec-2020

1 Loft not available in two bedrooms


2 Pergola has to be added
3 Grill for open terrace to be fixed
4 Straight stairs instead of spiral has been committed but not fixed
5 Gas unit hole not present
6 Exhaust fan hole not made in the kitchen
7 Fridge power connection to be interchanged
8 Grill paint asked for white, they made it black. I want it to be white.
9 Second coating of painting pending
10 Exterior painting is pending
11 Main gate painting is pending
12 Backyard tap to be fixed near garden
13 Electric boxes have to be closed
14 20A socket to be fixed for RO Water area along with the usual one
15 Rain water outlet in the open terrace to be fixed
Between the inside stairs and the ground floor bathroom, there is a
16 huge hole in the top wall
17 Door polishing not done for all doors
18 Broken tiles in Kitchen
19 Broken tiles in first floor western toilet bathroom
20 Kitchen sink outlet not completed
21 Wash basins yet to be fixed
22 Wall patti not finished fully