VILLA BUILDING REVISING finished date

#1 toilet at first floor smell not good

wooden curtain not install yet


railway at master bedroom need to reapaint
#2 fence need to repaint
light at the stair not isntall yet
out side wall modly

ceiling at small room is dirty


wall under te AC not paint yet at small room
light at the stair not istall yet
#3
crack under AC at first floor
master bedroom sharp edge
water leaked at the window near refrigerator

#4 water leaked at the railway in bed room

wall crack and need to repaint in front of stair


#6 water leaked at the railway beside the soffa at first floor
Strorage under the strair need to repaint

#7 wall near entrance and near villa number need to repaint

wall near the stair need to repaint


#8
Strorage under the strair need to repaint

the paint leftover have to clean at the entrance gate


#9 dirty in all pool areas
leaked at ther corner near beside the stove

no bed install yet


#10 the paint leftover have to clean at the garden near entrance
dirty in all pool areas
on duty noted