Clerk of Works: Mark Aulsberry

Initial Snag: Plot 116 RJA Consultants


Postal Address: 33 Hopwoods Road, IP32 6GJ markaulsberry@rjaconsultants.com
07399125561
(132C) Bronze Fields, Marham Park
16th June 2023
Property Type: 2 Bedroom Semi-Detached

Plot Location Issue


116
1. External General Clean down all brickwork, paving, soffits, fascias and ironmongery

2. Clean down all doors, windows, meter boxes, rainwater goods and canopies (where
fitted)

3. Landscaping to all elevations needs to be completed

4. Ensure all inspection chambers have their full complement of screws and are driven
home

5. Remove protruding nails from fence

6. External doors to be adjusted to seal & operate correctly

7. Front Elevation Fit door numerals / parking demarcations and check they are fitted correctly

8. Lay topping course to driveway / pathway

9. Install BT

10. Install water meter

11. Clean brick head above kitchen window

12. Clean mortar off from brick sills and repair large bedroom window sill

13. Infill mortar where missing

14. Check outside light is set to the correct settings

15. Side Elevation Infill mortar and bricks by soffit on gable

16. Ensure shingle is below DPC course

Page 1 / 5
Plot Location Issue
116
17. Side Elevation Straighten electric hockey stick

18. Infill hole in electric meter box where cable goes into plot – foam or mastic

19. Fit electric charging point

20. Rear Elevation Check paving slabs

21. Remove rubbish from back garden

22. Infill mortar below DPC course

23. Ensure no gaps under fence when turf is laid

24. Internal All Rooms Sparkle clean prior to handover

25. Make good to all walls and ceilings as required

26. Make good & improve finish to all woodwork throughout

27. Complete mastic throughout property

28. Ensure all sockets, switches and spurs are flush to wall and have their full complement
of screw pips

29. Complete sealant / cover trims round all light fittings and fixtures including door
hinges

30. Touch up skirtings as required after flooring has been laid

31. Internal doors to be adjusted to reduce rattle & ensure doors latch – refit doors after
flooring has been laid

32. Kitchen Line up all cupboard doors & drawers

33. Sink / drainer scratched

34. Fit doorstop door hitting worktop

35. Radiator marked

36. Replace plinths after vinyl has been fitted

Page 2 / 5
Plot Location Issue
116
37. Kitchen cont. Improve finish above and below boiler especially around pipes fit rosettes

38. Improve finish around sockets above worktop

39. Improve finish around fan

40. Lounge Improve decoration

41. Adjust back door

42. Adjust window catching when closing

43. Pencil marks behind radiator

44. Improve finish around sockets

45. Understairs Improve finish to skirting LHS on entrance to cupboard


Cupboard
46. Install BT and make good around sockets

47. Improve finish to newel post hole by the side and there is tape around the newel post

48. Improve finish LHS of the architrave in cupboard

49. Ground Floor WC Improve finish behind WC and underneath basin

50. Clean valves on toilet and basin of paint

51. Pencil marks behind the radiator

52. Finish making good above the door architrave and ceiling

53. Hall / Stairs / Adjust front door stiff locking


Landing
54. Mastic behind the chain

55. Improve finish to mastic behind hinges RHS

56. Improve decoration

57. Improve finish to rack of banister rail especially between the banister rail and the
lounge wall big holes on slope and at the top under the nosing

Page 3 / 5
Plot Location Issue
116
58. Hall / Stairs / LHS on way up the stairs - cracking
Landing cont.
59. Improve the nosing on the banister rail

60. Improve banister rail on landing improving the bottom – gap by newel post and
underneath the handrail and around the newel post

61. Caulk loft hatch

62. Remove smoke alarm protection

63. Improve finish around switches

64. Creaking on the landing as you enter bedroom 2 where the cupboard is - investigate

65. Landing Cupboard Improve decoration

66. Clean wires to heating valves

67. Bedroom 1 Improve decoration – window board, skirtings, architraves

68. Bedroom 2 Improve decoration – window board, skirtings, architraves

69. Tidy pipes under radiator

70. Tape behind radiator on faceplate

71. Nail pops by architrave

72. Bathroom Bath filled to overflow – no obvious signs of leak – refit bath panel

73. Fit shower curtain

74. Infill grout missing from around the bath

75. Improve finish into tile trim on tiled shelf

76. Fill around toilet waste

77. Improve finish behind the toilet

78. Improve finish below the basin

Page 4 / 5
Plot Location Issue
116
79. Bathroom cont. Clean valves of paint

80. Hot valve is unaccessible to turn off

81. Improve finish around shaver point

82. Pencil marks behind the radiator

83. Improve decoration all around the bathroom