2. Clean down all doors, windows, meter boxes, rainwater goods and canopies (where
fitted)
4. Ensure all inspection chambers have their full complement of screws and are driven
home
7. Front Elevation Fit door numerals / parking demarcations and check they are fitted correctly
9. Install BT
12. Clean mortar off from brick sills and repair large bedroom window sill
Page 1 / 5
Plot Location Issue
116
17. Side Elevation Straighten electric hockey stick
18. Infill hole in electric meter box where cable goes into plot – foam or mastic
28. Ensure all sockets, switches and spurs are flush to wall and have their full complement
of screw pips
29. Complete sealant / cover trims round all light fittings and fixtures including door
hinges
31. Internal doors to be adjusted to reduce rattle & ensure doors latch – refit doors after
flooring has been laid
Page 2 / 5
Plot Location Issue
116
37. Kitchen cont. Improve finish above and below boiler especially around pipes fit rosettes
47. Improve finish to newel post hole by the side and there is tape around the newel post
52. Finish making good above the door architrave and ceiling
57. Improve finish to rack of banister rail especially between the banister rail and the
lounge wall big holes on slope and at the top under the nosing
Page 3 / 5
Plot Location Issue
116
58. Hall / Stairs / LHS on way up the stairs - cracking
Landing cont.
59. Improve the nosing on the banister rail
60. Improve banister rail on landing improving the bottom – gap by newel post and
underneath the handrail and around the newel post
64. Creaking on the landing as you enter bedroom 2 where the cupboard is - investigate
72. Bathroom Bath filled to overflow – no obvious signs of leak – refit bath panel
Page 4 / 5
Plot Location Issue
116
79. Bathroom cont. Clean valves of paint