MAKATI UNIT C PUNCHLIST (FOR FINAL INSPECTION)

LOCATION: Novaliches St. Barangay Olympia Makati City


DATE VISIT: DECEMBER 21, 2016

Repaint and refurnish


beam extension between
stairs and living area

Realigned kitchen cabinet door

Repaint kitchen cabinet


connection
Repair and repaint
baseboard cracks

Smoothen plastering on column


and stairs area

Smoothen plastering on
terrace/railings
Smoothen, furnish and
repaint all window
openings

Smoothen plastering on
terrace/railings

Smoothen plastering on
terrace/railings
Realigned/smoothen
lavatory (abang tiles)

Refurnished finish of lavatory


tiles

Smoothen, furnish and repaint


all window openings
Smoothen, furnish and
repaint all window
openings

Smoothen, furnish and repaint


all door openings

Repair and repaint baseboard


cracks
Smoothen plaster finish
on stairs 4th floor
roofdeck

Repaint and refurnish skylight


ceiling termination

Repair and repaint paint cracks


at all wall and ceiling
connections
Repaint railings @
roofdeck

Repaint top of door and door


jamb

Repaint stain at kitchen cabinet

Additional door stopper for door


@ roofdeck

--NOTHING FOLLOWS--