MAIN BUILDING
ADMIN OFFICE
walls cracks application of marine epoxy as filler
repainting
no circuit breaker installation of circuit breaker (30AMP)
STOCK ROOM - ceiling leakages repainting
CONFERENCE ROOM
wall cracks application of marine epoxy as filler
improper installation of sprinklers provide proper covering on ceiling
damaged ceiling; leakage partial ceiling replacement
roofing sealant application
WARD HALLWAY
damaged ceiling; leakage complete repainting
roofing sealant application
WARDS
damaged door door replacement
damaged medical bed replacement
ceiling leakages; damaged lightings roofing sealant application
wall blistering repainting
non-functional lavatory provide accessories
wall cracks application of marine epoxy as filler
DELIVERY ROOM
door replacement to stainless
Cryo Fridge
HALLWAY
ACU additional ACU (2 per room); split type
ceiling damage & leaks total ceiling replacement
checking of roofing; sealant application
PHARMACY
no ACU provide 2 ACU
c replacement of cabinets
repair of sink
backflow (toilet) replacement of soil line
LABORATORY
new installation of 2 ACU
change of doors
proper cable management
request of new desktop unit
new installation of panel board
LABORATORY PANTRY
wall cracks
doors
toilet
cabinet
EXTERIOR
snakes
swamp for dumping
Dumping of Surroundings
OUT-PATIENT DEPARTMENT
ceiling
wall cracks
exit door
DENTAL CLINIC
ramp ra
AMBULANCE 2 UNITS
WATER TANK New Construction
WATER LINE separate firepro line to water supply
provide addtl waterline for other bldgs
ROADWAY for reblocking
Construction of Streetlights
POWERHOUSE new construction
STAFF DORM
Total Rehabilitation
DIETARY
Total Rehabilitation