‫مواصفات أعمال صيانة بمدرسة حليمة السعدية للتعليم اﻻساسي بوﻻية السويق‬

SPECIFICATIONS OF MAINTENANCE WORKS FOR HALIMA AL-SAADIA SCHOOL FOR BASIC EDUCTATION AT WILAYAT AL-SUWAIQ

Civil Work ‫اﻻعمال المدنية‬


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Paint all school Building from inside (Includes attached building) using (‫ﺻبﻎ كامل المبني المدرسي من الداخل ) يشمل المباني المرفقة‬
approved water proof oil paint ( at least three coat) with removing all ,(‫باستخدام أﺻباغ زيتية معتمدة مقاومة للرطوبة )ﻻيقل عن ثﻼث طبقات‬
coats of old paints using Grinder with cleaning and repairing the plaster ‫مع إزالة جميع طبقات الصبغ القديم حتي البﻼستر بأستحدام ال‬
and all cracks in wall, the work includes painting all ceilings of school ,‫ مع التنظيف و معلجة البﻼستر و جميع التشققات بالجدران‬Grinder
1 L.S L.S 19,700.000
building (includes attached buildings) using approved emolsion paint, the ‫يشمل العمل ﺻبﻎ جميع اﻻسقف بالمبني المدرسى ) يشمل المباني‬
work includes removing all existing connections (water + drainage) inside ‫ يشمل العمل إلغاء جميع التسليكات داخل‬,‫المرفقة( بأﺻباغ مائية معتمدة‬
walls for wash troughs, and fixing new connections with exposing them ‫ تﺻريف( ﻻحواض الغسيل مع عمل تسليكات جديدة‬+ ‫الجدران )مياه‬
according to engineer's direction and approval. .‫مكشوفة حسب توجيهات و إعتماد المهندس‬

Origenal BOQ Halima Al-saadia School Page 1 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Paint all school Building From Outside (Including attached buildings) using
approved water proof paint with removing all coats of old pants using
Grinder and repairing the plaster and cracks in walls, The includes works
fixing new drainage pipes for all AC,s outside wall and connecting them
2 with one pipes to drain water in a proposed place, with removing the old L.S L.S 16,900.000
pipes, The work includes removing and canceling existing rain water
drainage in roofs of all staircase rooms and installing new drainage
outside walls with doing all the works required for thar as per direction
and approval of engineer.

Paint all school compound wall using water proof paint with removing all
3 coats of old paints using Grinder and repairing the plaster and all cracks L.S L.S 5,600.000
in walls as per direction and approval of engineer.

Paint all steel works in school using approved epoxy paint, including
cleaning and removing the rusting ( it should be applied one coat of
4 L.S L.S 2,000.000
approved primer with removing the old paints of shades and playcourt)
as per direction and appoval of engineer.

Maintenance of all expansion joints inschool - including removing and


replaceing the existing concrete coping (with the block work) as per
5 attached drawing, removing and replacing the internal and roof aluminum L.S L.S 2,500.000
covers, cleaing the joints, and fill them with mastic sealent according to
direction and approval of engineer.

Origenal BOQ Halima Al-saadia School Page 2 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Removal of the existing water proof layer for (2) toilts at first floor as per
the attached drawings, then supply and laying of a new water proof layer
with five years warranty from specialist company according the general
spesifications, with all necessary civil works (removing the finishing layer,
excavation, backfilling, compaction, supply and laying new finishing layers
as per approval of engineer). the work includes replacement of internal
6 L.S L.S 2,000.000
drainage system for the two toilets with connection to the main drainage
system, with check and maintenance of all external drainage pipes for all
toilets at duct rooms inschool till the manhole, the work includes rectification
of leakage in the roof of first aid room (at roof beam) with doing all the
necessary works required for that and as per direction and approval of
engineer.

Remove and rplace all Existing water network in school, from the source to
the roof water tanks, and and from the roof water tanks to cooler rooms
and toilets and the other facilities/building in school, with new approval
one Coprex, and cover external pipes using approval insulation layer,
7 with replacing all existing roof water tanks in school with new approved L.S L.S 6,500.000
ones and fixing new approved water proof layer for the pedistals of roof
tanks ( construction new pedistal using block and plaster in the abcence
of them), with all works required for that as per direction and approval of
engineer.

Check and mainten all existing external drainage system in school from
start of drainage to holding tanks and soak pits , and rectify any
blockage, with replacing the damage pipes and accessories with new
approved one UPVC- Omani with Cleaning and suction of all existing
8 holding tanks and soak pits and manholes , the work includes maintening L.S L.S 800.000
all manholes covers and replacing the damaged with new approved ones
Heavy duty, with rising external manhole 20 cm from earth, and replacing
existing concrete protection for manholes at area of interlocks, with doing
all the civil works required as per approval of engineer.

Origenal BOQ Halima Al-saadia School Page 3 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Check and mainten all existing internal drainage system of toilets and
cooler rooms and the other facilities / building in school up to manholes,
and rectify any blockage , with replaceing the damaged pipes and
accessories with new approval one UPVC-Omani, the work includes
replacing all sanitary accessories (taps, mixers, shower sprayers, sprayers,
9 L.S L.S 9,000.000
water closets, kitchen sink, wash basin flush tank, floor traps,...etc) in all
toilets , cooler rooms , and the other favilities/ building in school and fixing
wash basin with counter top (use marble) in teacher's and adminstration
toilets, and rising walls of internal units upto ceiling , with doing the civil
works required as per approval of engineer.

Remove and Replace damage / affected / missing / swelling /


descending / separate, From Tiles, Steps, skirts ( including all types),
marbles, interlocks, Kerbstone, cement tiles with new approved one for
each type in all school building / facilities, with removing and replacing all
10 3,000.000
floor tiles of handecaped ramp in all staircase rooms, and replacing all
tiles in external edage of corridors at ground floor with new approved
ones for each type , with doing all the civil works required as per direction
and approval of engineer.

Application of Anti-termite treatments for all parts of school building


according to attached details, using the necessary chemical materials as
11 2,700.000
per approval of engineer, with ten years guarantee from a specialist
company.

Origenal BOQ Halima Al-saadia School Page 4 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Maintenance of all doors in school, including Replacing all damaged and


missing parts ( locks, handles, door closer, door stoper,… etc). fixing and
rectifying verticality, filling gaps with selicon, painting using approval
methods for each type,… etc. with supplying and fixing keys (2) + master
key. the work includes removing and replacing all wooden frames in
school, with replacing the damaged and missing doors for all types of
12 15,160.000
doors (including wooden doors effected by termite) with new approved
ones, the works includes removal and replacement of all wooden doors in
toilets ( Internal & main doors ) with new approved aluminum doors, and
replacement of existing wooden door of main entrance with new
approved one (aluminum and class), with doing all the works required as
per direction and approval of engineer.

Maintenance of all windows in school, including replacement of all


damaged and missing parts and accessories, and fixing of new fly mesh
13 1,500.000
for all windows, with doing all the works required as per approval and
direction of engineer.

Rehabilitation of the kiosk building as per attached drawings and details,


including extension of the building from the front side, removal and
replacement of existing shde, removal of existing steps intirely ( including
PCC) and making new steps, adding new barriers, new aluminum windows,
new security grills, new aluminum cupboards and new marble in the place
14 of of the extension with replacing the existing and missing one from each 11,600.000
type in the old building, fixing new ceramic and removing old tiles, and
replacing the existing door with new approved one UPVC type, with doing
all electrical works required and fixing of (1) new A/C-split to additional
part as per approved specifications, attached drawings and details, with
doing all works required as per direction and approval of engineer.

Origenal BOQ Halima Al-saadia School Page 5 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Construct new shade in main entrance of school as per attached site paln,
drawings, and details, the work includes maintenance of existing yard shde
and replacement of all roof covering sheet (top & side ), all base plates
15 6,100.000
covers, and all damaged and corrded parts and sections with new
approved ones for each type, with doing all the works required as per
direction and approval of engineer.

Replace the Faulty, broken, damaged, rusted, missing or burned include :(


fire alarm control panel with all accessories: emergancy lights, glass call
points, exit lights, bells, smoke detectors, MCBs, MCCBs, RCD-MCBs, ELCBs,
isolaters, A/C outlets, MCCBs, water heaters, swithes, sockets, DB
enclosures, wires, flood lights, wall lights, fly meshes, pen board) with new
16 one as approval of engineer. the works including: dismantle window type 3,200.000
A/C units in all school building with the block work, plastering, painting,
...etc, and make every thing to match existing & as approval of the civil
eng & Submit all widow A/Cs to the directorate's stores
The work Includes: Balance all Loads & check all cables & replace cable
damaged to new one as approval of engineer.

Replace all Ceiling Lights in:


Corridors (75 nos), admin rooms (12nos), CRMs (175nos), MPH (10nos),
staff rooms (16nos), computer rooms (10nos), L.R.C (12nos), F/A (2nos),
labs (20nos), Stores (7nos), toilets (16nos), W/C (4nos), kiosk (2nos), guard
17 room (3nos)
8,400.000

to new lights as (2x40W. PHILIPS BRAND), with all accessories, supports


and connections & as approval of engineer.

Origenal BOQ Halima Al-saadia School Page 6 of 7


Item Details Unit Qty Total Price ‫الفقرة‬ ‫م‬

Replace all Ceiling Fans & regulators fans in : Admin room & in CRMs (93
18 nos), to new on as (KDK) brand, the work including, replace all damaged 2,700.000
exhaust fans in all toilets to new one as approval of engineer.

Total tender sum 119,360.000

One Hundred Nineteen Thousand Three Hundred Sixty OMR